roofy

Violations at 537 49 Street

Brooklyn, NY 11220 · BBL 3-00775-0070 · Back to the property

HPD housing violations

The newest 50 of 79 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Closed — Violation dismissed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Dec 31, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 31, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story

    Nov 27, 2023

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retatdant ceiling at public hall, 3rd story

    Nov 27, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st story

    Nov 27, 2023

    Closed — Violation closed
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 27, 2023

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak at ceiling at 1st public hall from north, 4th story

    Nov 27, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling at 1st public hall from north, 4th story

    Nov 27, 2023

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant ceiling at 1st public hall from north, 4th story

    Nov 27, 2023

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of boxes & shopping cart at 1st public hall from north, 4th story

    Nov 27, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 22, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 6, 2021

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective lock at building entrance door , 1st story

    Mar 28, 2019

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story

    Mar 28, 2019

    Closed — Violation closed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Mar 28, 2019 · Apt 1L

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 15, 2018

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair the broken or defective lock at front entrance door to building , 1st story

    Jan 11, 2018

    Open — Nov certified late
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Open — Certification postponment denied
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Open — Certification postponment denied
  • CImmediately hazardous

    Properly repair with similar material the broken or defective shettrock at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, south wall, 1st window frame from west at north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from south at west wall in the foyer located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall, east wall, south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, ceiling in the foyer located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, 1st door frame from west at north wall, 1st door from west at north wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Abate the nuisance consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing escutcheon plate at riser at ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector inoperative in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Aug 16, 2017 · Apt 2L

    Closed — Violation dismissed
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 16, 2017

    Open — Not complied with
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 16, 2017

    Open — Not complied with
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Nov 28, 2016 · Apt 2L

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair the broken or defective lock at building entrance door

    Apr 19, 2016

    Closed — Violation closed
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jan 15, 2016

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair the broken or defective mechanical locking assembly at building front entrance door , 1st story

    Jan 31, 2015

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 4th story

    Jan 31, 2015

    Closed — Violation closed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Aug 23, 2014

    Open — Nov sent out

DOB building violations

9 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active

ECB violations

5 ECB violations, newest first.

  • Class - 2

    During an inspection of one weil mclain model egh105.found ceiling andwalls with holes. found backflow with no pipe down /boiler room being used for storage. correct all violating conditions and submit a certif

    Jan 5, 2024 · Penalty $310

    Resolve
  • Non-hazardous

    Use of illegal hardware! door use for access to cellar from 1st flr public hall found with padlock preventing egress in case of an emergency as cellar found with dwelling space(consisting) of sros. #3 rooms wit

    Mar 31, 2008 · Penalty $350

    Active
  • Non-hazardous

    Failure to maintain interior building! hazardous defects noted: cellarfound with dwelling space for living and walls and ceiling, not firestopped throughout with steel beam and(lolly)columns exposed with out sp

    Mar 31, 2008 · Penalty $800

    Active
  • Non-hazardous

    Occupancy contrary to that allowed by c of o or dept of building records: cellar is arranged and occupied as a dwelling spaces with bathroom, kitchens and rooms use as sros. contrary to dept records. which spec

    Mar 31, 2008 · Penalty $400

    Active
  • Non-hazardous

    Work w/o a permit! illegal work noted: full height partitions found erected at cellar to create dwelling space with bathroom, kitchen and rooms used as sros w/o prior obtaining proper permits from the departmen

    Mar 31, 2008 · Penalty $250

    Active