Violations at 547 49 Street
Brooklyn, NY 11220 · BBL 3-00775-0067 · Back to the property
HPD housing violations
The newest 50 of 63 HPD violations. The city keeps the complete history.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 1l, 1st story, apartment at north
Jun 26, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1l, 1st story, apartment at north
Jun 26, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, apartment at north
Jun 26, 2025 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door , 1st story
Apr 22, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, west wall and ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 2nd room from north located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower sash glass pane at north window in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 10 sq. ft. at east wall and 10 sq. ft. at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Oct 23, 2023 · Apt 1L
Open — Defect letter issued - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 24, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 24, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Oct 24, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 24, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at west wall, 1st window frame from north at east wall in the foyer located at apt 1r, 1st story, 2nd apartment from west at north
Nov 8, 2015 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from west at north
Nov 8, 2015 · Apt 1R
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north
Nov 8, 2015 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Nov 8, 2015 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Nov 8, 2015 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from west at north
Nov 8, 2015 · Apt 1R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present
Aug 23, 2014
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north
Feb 8, 2013 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4l, 4th story, apartment at west
Nov 14, 2012 · Apt 4L
Closed — Violation closed - ANon-hazardous
Properly secure the loose ceramic tiles at wall at bathtub in the bathroom located at apt 3r, 3rd story, apartment at east
Nov 14, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate palockable gate in the kitchen located at apt 3r, 3rd story, apartment at east
Nov 14, 2012 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 3r, 3rd story, apartment at east
Nov 14, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective counterbalances at lower sashes in the entire apartment located at apt 3r, 3rd story, apartment at east
Nov 14, 2012 · Apt 3R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the bathroom located at apt 3f, 3rd story, apartment at west
Nov 14, 2012 · Apt 3F
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate padlockable gate in the kitchen located at apt 3f, 3rd story, apartment at west
Nov 14, 2012 · Apt 3F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3f, 3rd story, apartment at west
Nov 14, 2012 · Apt 3F
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3f, 3rd story, apartment at west
Nov 14, 2012 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4l, 4th story
Nov 14, 2012 · Apt 4L
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system no access information on the sign at public hall, 1st story
Nov 14, 2012
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to cellar locked at public hall, 1st story
Nov 14, 2012
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective locking device on vestibule door at public hall, 1st story
Nov 14, 2012
Closed — Violation closed
DOB building violations
4 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
2 ECB violations, newest first.
- Class - 3
Occupancy contrary to that allowed by the c/o or bldg dept records. hpd records indicate 4 sty multiple dwelling approved for 8 class a apts,2 on each flr illegal occupancy:partitions erected in cellar creating
May 23, 2012
Resolve - Class - 1
Work w/o a permit. work noted: at cellar partitions erected creating rooms. plumbing lines installed for kitchen sink & 3 pc bathroom. remedy: obtain all necessary permits.
May 23, 2012
Resolve