Violations at 549 49 Street
Brooklyn, NY 11220 · BBL 3-00775-0065 · Back to the property
HPD housing violations
13 HPD violations, newest first.
- CImmediately hazardous
Provide ready access to buildings heating system door locked at public hall, 1st story
Dec 8, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 8, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective wood baseboard at south wall in the foyer located at apt 1b, 1st story, 1st apartment from north at east
Jul 11, 2017 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jul 11, 2017 · Apt 1B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Dec 1, 2013
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling approx.15 sq.ft in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Sep 11, 2013 · Apt 1B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Sep 11, 2013 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at walls and ceilings in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Sep 11, 2013 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 1b, 508th story, 1st apartment from west at north
Sep 7, 2013 · Apt 1B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 4 sq.ft. in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Sep 7, 2013 · Apt 1B
Closed — Violation dismissed - BHazardous
Replace with new the missing glass at vestibule door to 1 sty public hall.
Feb 22, 1996
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls thru out 2 sty north apt 2d.
May 9, 1995
Open — Not complied with
DOB building violations
2 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
1 ECB violations, newest first.
- Class - 2
Pedestrian protection doesnt meet code specs.@time of insp observed sidewalk shed installed@exp1 approx18'h.sidewalk shed found in unstable condition due to posts/columns stecz pipes noticeably out of plumb,cro
Mar 16, 2021 · Penalty $2,400
Resolve