roofy

Violations at 549 49 Street

Brooklyn, NY 11220 · BBL 3-00775-0065 · Back to the property

HPD housing violations

13 HPD violations, newest first.

  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at public hall, 1st story

    Dec 8, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Dec 8, 2023 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective wood baseboard at south wall in the foyer located at apt 1b, 1st story, 1st apartment from north at east

    Jul 11, 2017 · Apt 1B

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east

    Jul 11, 2017 · Apt 1B

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 19, 2015

    Closed — Violation dismissed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)

    Dec 1, 2013

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling approx.15 sq.ft in the bathroom located at apt 1b, 1st story, 1st apartment from west at north

    Sep 11, 2013 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Sep 11, 2013 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at walls and ceilings in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Sep 11, 2013 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 1b, 508th story, 1st apartment from west at north

    Sep 7, 2013 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 4 sq.ft. in the bathroom located at apt 1b, 1st story, 1st apartment from west at north

    Sep 7, 2013 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Replace with new the missing glass at vestibule door to 1 sty public hall.

    Feb 22, 1996

    Open — Not complied with
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ceiling and walls thru out 2 sty north apt 2d.

    May 9, 1995

    Open — Not complied with

DOB building violations

2 DOB violations, newest first.

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active

ECB violations

1 ECB violations, newest first.

  • Class - 2

    Pedestrian protection doesnt meet code specs.@time of insp observed sidewalk shed installed@exp1 approx18'h.sidewalk shed found in unstable condition due to posts/columns stecz pipes noticeably out of plumb,cro

    Mar 16, 2021 · Penalty $2,400

    Resolve