Violations at 555 49 Street
Brooklyn, NY 11220 · BBL 3-00775-0063 · Back to the property
HPD housing violations
The newest 50 of 109 HPD violations. The city keeps the complete history.
- BHazardous
Remove all encumbrances consisting of households articles on the floor, at public hall, 1st story
Oct 5, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Oct 5, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 5, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latchset assembly of the door knob defective at the front entrance door to building , , 1st story
Oct 5, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset assembly of the door knob at the front entrance to building , 1st story
Oct 5, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing located at apt 2r, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing located at apt 2r, 2nd story, 2nd apartment from west at north
Mar 30, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of air conditioner, bicycle and barbecue grill at public hall, 4th story
Mar 23, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 4th story
Nov 23, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded plaster material at celling at public hall stairs, 4th story
Nov 23, 2025
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Nov 23, 2025 · Apt 4A
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Nov 23, 2025 · Apt 4A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at celling in the 5th room from north located at apt 4a, 4th story, 1st apartment from west at north
Nov 23, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at celling in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Nov 23, 2025 · Apt 4A
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key oberated lock installed at door leading to fire escape window in the 1st room from north located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 6, 2025 · Apt 2R
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 6, 2025 · Apt 2R
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 6, 2025 · Apt 2R
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 6, 2025 · Apt 2R
Open — Not complied with - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate window at north wall in the 1st room from north located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 6, 2025 · Apt 2R
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchen located at apt 2r, 2nd story, 2nd apartment from west at north
Nov 6, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder in the down position at rear yard at fire escape, section ''rear''
Nov 5, 2025
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing missing metal tread (4th from bottom) at drop ladder at building rear yard. at fire escape, section ''rear''
Nov 5, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner at rear yard at fire escape, 3rd story
Nov 5, 2025
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at the west wall at public hall, 4th story
Nov 5, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall at public hall, 4th story
Nov 5, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling and west wall at public hall, 4th story
Nov 5, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 4th story
Nov 5, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet doors in the kitchen located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Aug 4, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the private hallway , the bathroom , the 5th room from north, the 3rd room from north, the kitchen located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
May 16, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 4th story
May 16, 2025
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the private hallway located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from west at north
May 16, 2025 · Apt 4A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Jan 31, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at cei,ing at public hall, 4th story
Jan 31, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
Jan 31, 2025
Closed — Violation closed
DOB building violations
9 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 1, 1990
Vp*-violation unserved ecb- dismissed
ECB violations
2 ECB violations, newest first.
- Non-hazardous
Bq9/34a/36/50 bq9-weil mclaijn boielr 50-discharge pipe from 1'to 34
Apr 25, 2005 · Penalty $430
Active - Non-hazardous
Failure to provide maintian fire stopping where required in open cellar and boiler rear north ceiling are exposted wood joists. remedy; provide maintian fire stopping forthwith.
May 10, 2002 · Penalty $350
Resolve