roofy

861 48 Street

Brooklyn, NY 11220BBL 3-00769-0047Map

Owner of record: Zohov Rlty Corp

861 48 Street is a walk-up apartment building built in 1928 in Brooklyn, 11220. It has 32 residential units across 4 floors. The owner of record is Zohov Rlty Corp. HPD has recorded 1,162 housing violations here, most recently on October 19, 2026. 35 of the 50 most recent violations are still open.

HPD violations
1,162
DOB violations
29
ECB violations
23
HPD complaints
880

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,162

  • C

    Repair the broken or defective connection at the waste pipe at the sink in the kitchen located at apt 1d, 4th story, 2nd apartment from north at east

    Oct 19, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 4th story, 2nd apartment from north at east

    Oct 19, 2026 · Apt 1D

    Open — Notice of issuance sent to tenant
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): violation #19290473 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Oct 12, 2026

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt b5, 2nd story, 1st apartment from north at east

    Oct 9, 2026 · Apt B5

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at celing at cellar

    Oct 9, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardent material at the ceiling at cellar

    Oct 9, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt d3, 4th story, 2nd apartment from north at east

    Oct 9, 2026 · Apt D3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt b5, 2nd story, 1st apartment from north at east

    Oct 9, 2026 · Apt B5

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sq feet at ceiling in the bathroom located at apt b5, 2nd story, 1st apartment from north at east

    Oct 9, 2026 · Apt B5

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Closed — Violation closed
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door frame from north at east wall, east wall, west wall in the foyer located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, south wall in the 3rd room from north at east located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the bathroom located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at north wall in the 2nd room from north at west located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from north at west located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north at west located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st door frame from south at west wall in the private hallway located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall and ceiling in the 3rd room from north at east located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • B

    Properly secure the loose hinges at door in the bathroom located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • B

    Properly secure the loose light fixture at the ceiling in the private hallway located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the private hallway located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, 1st door frame from east at south wall in the bathroom located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, 1st window frame from north at east wall in the 2nd room from north at west located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the 3rd room from north at east located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at east located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, baseboard at east wall in the 3rd room from north at east located at apt d3, 4th story, 2nd apartment from north at east

    Sep 15, 2026 · Apt D3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 3rd room from north at east located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Open — Not complied with
  • C

    M/d law abate the nuisance consisting of electric extension cord from north wall at 1st story public hall to ac unit at south wall in the 3rd room from north at east located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Open — Not complied with
  • A

    Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) at ceiling in the bathroom located at apt a5, 1st story, 1st apartment from south at west

    Jul 6, 2026 · Apt A5

    Open — Not complied with
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — First no access to re- inspect violation
  • C

    Provide hot water at all hot water fixtures in the 1st room from north located at apt b4, 2nd story, 1st apartment from north at east

    Feb 20, 2026 · Apt B4

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from north located at apt b4, 2nd story, 1st apartment from north at east

    Feb 20, 2026 · Apt B4

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at basement

    Feb 20, 2026

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective marble riser at first,second and third tread at public hall, 1st story

    Oct 14, 2025

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at center floor ceiling at public hall, 2nd story

    Oct 14, 2025

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at center floor ceiling at public hall, 3rd story

    Oct 14, 2025

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at center floor ceiling at public hall, 4th story

    Oct 14, 2025

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt a8, 1st story, 1st apartment from west at north

    Oct 8, 2025 · Apt A8

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt a8, 1st story, 1st apartment from west at north

    Oct 8, 2025 · Apt A8

    Open — First no access to re- inspect violation
  • B

    M/d law abate the nuisance consisting of plexi-glass at building entrance doors at public hall, 1st story

    Oct 7, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective mortar joints north exterior bricks wall at 1st,2nd 3rd stories at east centre court yard

    Aug 6, 2025

    Open — Not complied with
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt c4, 3rd story, 1st apartment from south at west

    Aug 6, 2025 · Apt C4

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak at ceiling at bulkhead at public hall, 4th story

    Aug 6, 2025

    Closed — Violation closed
  • C

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt c4, 3rd story, 1st apartment from south at west

    Aug 6, 2025 · Apt C4

    Open — Not complied with

DOB building violations · 29

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 22, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 16, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
Show 19 more ↓
  • Immediate emergency anythingoptional

    Install an approx total of 400 linear feet of sidewalk shed along the entire perimeter of bldg w/approx 100 linear feet along exp#1,approx 100 linear feet along exposure 2.approx.100 linear feet along exp#4 to safeguard the public and property

    Sep 8, 2021

    Dob violation - dismissed
  • Construction other optional

    At time of inspection observed coping stone removed throughout roof, sections of parapet wall in state of disrepair with multiple cracks, voids, missing mortar in between joists and leaning towards building with a possibility to fall down.

    Sep 7, 2021

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active

ECB violations · 23

  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons 39093645x., file a certificate of correction

    Jun 11, 2026 · Penalty $6,250

    Active
  • Class - 2

    At the time of inspection i observed a sidewalk shed installed at exp. # 1. i searched on dob system and appears that the permit for temporary equipment on site-sws expired on 03/01/2022.permit # b00591978.i di

    Apr 19, 2024 · Penalty $1,250

    Active
  • Class - 1

    Unlawful acts: failure to comply with the commissioner's order as stated in ecb# 35576712h issued on 09/15/2021 and file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01, comply with commission

    Feb 2, 2024 · Penalty $6,250

    Resolve
  • Class - 2

    At time of inspection observed sws in place at exp#1 however permit has been expired on 03/01/2022., renew permit

    Aug 29, 2023 · Penalty $6,250

    Active
  • Class - 1

    At time of inspection observed fire escape exit passageway to street obstructed by side walk shed upright member ,cross brace and netting., repair and/replace

    Aug 29, 2023 · Penalty $6,250

    Active
  • Class - 2

    Failure to maintain bldg walls or appurtenance note@roof level parapetwall in state of disrepair w/cracks&missing mortar thruout also wall leaning sws installed.permit b00591978 expires3/1/22 also permit b00653

    Feb 28, 2022

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner observed:@roof level,parapet wall,missing coping stone in diff secs,parapet wall sec above main entrance in uneven,@exp1,facade missing mortar&cracks in diff loc

    Dec 13, 2021 · Penalty $1,563

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39047076h issued on 09/07/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls or appurtenances.

    Oct 28, 2021

    Resolve
  • Class - 2

    Work does not conform to approced construction documents. note: at thetime of inspection,i observed sidewalk shed in place. upon review of plans the sidewalk shed did not conform to approved plans. i observed

    Oct 8, 2021 · Penalty $620

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping.note:at time of inspection observed excessive amounts of stored debris household items building material black garbage bags boxes tired etc throughout basement and rear

    Sep 15, 2021 · Penalty $625

    Resolve
Show 13 more ↓
  • Class - 2

    Failure to properly secure support electrical metalic tubing (emt) electrical raceway in boilerrm not properly supported properly secure support emt

    Sep 15, 2021

    Resolve
  • Class - 2

    Fail to provide effective electrical continuity for metal raceways enclosures cable armor emergency lights raceway not continuous provide effective electrical continuity

    Sep 15, 2021 · Penalty $600

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.no fire stopping.note:at time of inspection observed several areas of fire stopping materials removed from ceiling in basement.occupied apartments causing c

    Sep 15, 2021 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain building in code compliant manner.note:at time of inspection observed mortar joints eroded on parapet wall coping stones missing and broken parapet wall booding numerous spots on roof broken

    Sep 15, 2021 · Penalty $312

    Resolve
  • Class - 2

    Electrical work w/o permit observed@8am replacement of 125amp circuit breaker in panel&installation of new circuit breaker panels no app on file for electrical work obtain permit

    Sep 15, 2021

    Resolve
  • Class - 2

    Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or woring in use defective wiring&features thruout bsmt,armored cable racewayused for outdoor lighting,defective emergenc

    Sep 15, 2021

    Resolve
  • Class - 1

    At the time of inspection observed coping stone removed throughout roof, sections of parapet wall in a state of disrepair with multiple cracks, voids, missing mortar in between joists and leaning towards buildi

    Sep 7, 2021 · Penalty $625

    Resolve
  • Class - 2

    Unapproved/unsafe/unsuitable,electrical equipments,apparatus,materials,devices,appliances or wiring in use. observed extension cord use to supply electrical power to outdoor light fixture at the front of the bu

    Oct 4, 2019 · Penalty $2,000

    Resolve
  • Class - 1

    Work w/out a permit on 6/15/17 @approx 6:30pm i observed on the 2nd flapt b3 a newly installed gas appliance valve along w/piping & fittings supplying a gas stove stove all work was done w/out no permits on fil

    Jun 15, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested on 6/15/17 @approx 6:30pm i observed on the & fl apt b3 a gas line supplying a gas stove being altered w/out no insp or test on file under dob records.no ga

    Jun 15, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    B254,25a,34b,15,28b,50,50a. 50- missing belt guard on transfer pump. 34b- 2 doors. 50a- debris in boiler room.

    Nov 30, 2012 · Penalty $2,500

    Active
  • Hazardous

    B4b34b/50ab/50c 50a-fire box above burner corroded-hazardous repair immediate.50b-boiler control missing covers.50c-safety relief valves not piped down to safe location.

    Jul 21, 2006 · Penalty $2,500

    Active
  • Hazardous

    Failure to mainatain bldg. defects is ceiling cracked bugling and leaking plaster and paint is falling on living room furniture and floor below creating a hazardous condition also bedroom ceiling plaster and

    Apr 24, 2003 · Penalty $800

    Active

Complaints

  • Heat/hot water

    Entire building

    Oct 23, 2026 · Apt 6D

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2026 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2026 · Apt 1D

    Close
  • Paint/plaster

    Ceiling

    Oct 16, 2026 · Apt 1D

    Close
  • Door/window

    Window frame

    Oct 16, 2026 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Oct 16, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Oct 16, 2026 · Apt 1D

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Oct 16, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Pests

    Oct 16, 2026 · Apt 1D

    Close
  • Unsanitary condition

    Mold

    Oct 16, 2026 · Apt 1D

    Close
  • Plumbing

    Steam pipe/riser

    Oct 16, 2026 · Apt 1D

    Close
  • Plumbing

    Basin/sink

    Oct 16, 2026 · Apt 1D

    Close
  • Door/window

    Door

    Sep 12, 2026 · Apt D3

    Close
  • Paint/plaster

    Wall

    Sep 12, 2026 · Apt D3

    Close
  • Paint/plaster

    Ceiling

    Sep 12, 2026 · Apt D3

    Close
  • Electric

    Wiring

    Aug 20, 2026 · Apt C8

    Close
  • Electric

    Power outage

    Jul 3, 2026 · Apt A5

    Close
  • Electric

    Power outage

    Jul 3, 2026 · Apt A5

    Close
  • Heat/hot water

    Entire building

    May 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2026 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2026 · Apt B4

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 21, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt B3

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2025 · Apt D3

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2025 · Apt D6

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2025 · Apt B8

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1928
Floors
4
Residential units
32
Building area
32,000 ft²
Lot area
10,000 ft²
Zoning
R6
Community board
312
Council district
38
Block / lot
769 / 47
Assessed value
$692,550
Landmark / historic district
No

HPD registration #362512, last renewed Jun 30, 2022.

Questions about 861 48 Street

Who owns 861 48 Street?

The owner of record in NYC Department of City Planning PLUTO data is Zohov Rlty Corp.

Does 861 48 Street have violations?

Yes. NYC HPD has recorded 1,162 housing violations at this property.

Is 861 48 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 861 48 Street built?

City records list 1928 as the year it was built.

How many apartments are in 861 48 Street?

It has 32 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.