Violations at 4705 5 Avenue
Brooklyn, NY 11220 · BBL 3-00766-0006 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
1 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed
ECB violations
11 ECB violations, newest first.
- Class - 2
Job 321388832 issued 07-09-19 alteration-1 to change use as supermarket also to amend c/o. as of this inspection c/o 60996 details building as motion pictures 07-10-30, building altered under job alt-1 no chang
Jul 27, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to have or maintain the required daily log book(log book inadequate) at the time of my inspection on an active job site of a 1 sty bldg. i observed workers on site engaged in plumbing activities on the
Jun 26, 2019
Resolve - Class - 2
Failure to provide approved/accepted construction documents at job site at the time of inspection(no site safety plans). at the time of my inspection on an active jobsite of a 1 sty bldg. i observed on site of
Jun 26, 2019
Resolve - Class - 1
Failure to designate &/or have a construction superintendent &/or competent person on site as required by code. at the time of my inspectionon an active jobsite of a 1 sty bldg. i observed workers working on th
Jun 26, 2019
Resolve - Class - 1
Failure to file evidence of compliance w/workers comp/law &/or diability benefits law(expired disabilty/workers comp). at the time of my inspection on an active jobsite of a 1 sty bldg. i observed workers on th
Jun 26, 2019
Resolve - Class - 1
Failure to notify the dept prior to commencement of earthwork(no rule 52)at time of inspection: i observed excavation wokr done in cellar,approx 8'x8'x5'deep. also a strip 36"x12"x12ft deep. no notification was
Apr 30, 2018
Resolve - Class - 2
Failure to provide approved construction documents &/or approved amendments)no see or underpinning dwg)at the time of inspection i observed excavation work underpinning address incellar no soe or underpinning
Apr 30, 2018
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction(no rebar caps)at time of inspection excavatopm & rebars were done in cellar. there are rebars protruding upwards at exp#2 w/no
Apr 30, 2018 · Penalty $625
Resolve - Class - 1
Sec. 3303.9 failure to provide required means of egress & other elements in existing bldg under construction. at time of inspection i observed work presently being done in cellar(excavation)2 metal bars blocked
Apr 30, 2018
Resolve - Class - 2
Sec. 3309.6 failure to monitor adjoining structures for movement in all directions during excavation related activity that may adversely affect adjoining structures. at the time of inspection it was observed ex
May 12, 2016
Resolve - Class - 1
Failure to notify dob w/i 24-48hrs of the start of excavation. at the time of inspection,it was observed excavation was on going & there wasno notifucation was ongoing & there was no notification # from the dob
May 12, 2016 · Penalty $1,230
Resolve