Violations at 4417 5 Avenue
Brooklyn, NY 11220 · BBL 3-00739-0003 · Back to the property
HPD housing violations
41 HPD violations, newest first.
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... at public hall, 1st story
Aug 10, 2025
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the birds excerments throughout on the floor, building at front areaway
Jun 3, 2024
Closed — Violation closed - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the rear east sections , yard
May 29, 2024
Closed — Violation closed - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the extensions roof, in rear sections , yard, 1st story
May 29, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 29, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes plastic sheets with household articles throughout on the balcony, in rear yard stack, at fire escape, 2nd story
May 29, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes plywood board,garbages on the balcony, in building front stack, at fire escape, 2nd story
May 29, 2024
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stoires balconies and stairs , in the entire rear yard stack, at fire escape
May 29, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes water fountain bottoms on the balcony, in rear yard stack, at fire escape, 4th story
May 29, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes bicycles on the balcony, in rear yard stack, at fire escape, 3rd story
May 29, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window locks at 1st and 2nd window at fire escape in the 1st room from north at center located at apt 3l, 3rd story
May 8, 2024 · Apt 3L
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction material and black garbage bags at public hall, 1st story
May 8, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood door in the 3rd room from north at west located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at window upper sash in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective door knob at 1st bathroom from north at west in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 2nd bathroom from north at west in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchenette located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet 2nd from north at east wall in the kitchenette located at apt 3l, 3rd story, 1st apartment from west at north
May 8, 2024 · Apt 3L
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material, plaster at north and east walls, building 's vestibule, , 1st story
Feb 17, 2024
Closed — Violation closed - BHazardous
Replace with new the missing knob at iron security door at entrance to building, , 1st story
Feb 17, 2024
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock iron security door, building vestibule , 1st story
Feb 17, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes miscellaneous household items at fire escape at east at building front , 2nd story
Aug 16, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 5, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
May 11, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 12, 2018
Closed — Violation dismissed - BHazardous
Discontinue unlawful use for single room occupancy purposes .. located at apt 3r, 3rd story, 1st apartment from north at east
May 15, 2018 · Apt 3R
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Jun 6, 2016
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jun 6, 2016 · Apt 2R
Open — First no access to re- inspect violation - BHazardous
Provide an adequate supply of gas to the fixtures .. in the kitchen located at apt 4r, 4th story, apartment at west
Jun 22, 2013 · Apt 4R
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 4r, 4th story
Jun 22, 2013 · Apt 4R
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective glass pane lower sash in the 1st room from north located at apt 4r, 4th story, apartment at west
Jun 22, 2013 · Apt 4R
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective porcilien enamel glaze bathtub in the bathroom located at apt 4r, 4th story, apartment at west
Jun 22, 2013 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt 4r, 4th story, apartment at west
Jun 22, 2013 · Apt 4R
Closed — Violation dismissed
DOB building violations
4 DOB violations, newest first.
- Plumbing none
The dob intends to revoke all approvals and permits under plumbing laa #310455851 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Dec 26, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 16, 2007
Dob violation - dismissed - Construction other optional
Circumstance beyond control. due to circumstance beyond control fire d amage at 2nd fl. apt. 2r front room has affected 1st and 3rd fl. front section of ceiling and floor joists,partition walls,and water damage throughout.remedy:make safe obtain all necessary permits and make all necessary relairs
Feb 14, 2007
Dob violation - dismissed
ECB violations
5 ECB violations, newest first.
- Class - 2
Work w/o a permit. noted: at front 1st fl(stores)erected 2 non illuminated business awnings named(1)gold & diamonds (2)zapateria jalisco. remedy: obtain required permits.
Jul 18, 2018 · Penalty $625
Active - Class - 2
Occupancy contrary to that allowed by c of o and dob records. 3rd story apt 3r. illegally used for single room occupancy purposes. 4 s.r.o'spresent. also 2 community bathrooms present. remedy:discontinue illega
May 15, 2018 · Penalty $1,280
Active - Class - 2
Failure to maintain bldg in a code-compliant manner.defect noted at roof.found that the sky light in stairway bulk head has been removed.skylight is a requirement for fire fighting operations in multi dwellings
Mar 31, 2014
Resolve - Class - 2
Work does not conform to approved const docs &/or approved amendments for alt 2 job #320744511 for which permit is active till 2-11-15 & applicant is requesting a sign-off for issuance of l.o.c.non conforming w
Mar 31, 2014
Resolve - Class - 2
Work contrary to approved plans noted: work in progress under permit no 320744511-ot throughout and observe installations of partition walls in living rooms have compromised the access to fire escapes.also
Dec 5, 2013 · Penalty $2,500
Resolve