229 45 Street
Brooklyn, NY 11220BBL 3-00736-0071Map
Owner of record: Gomez Ninfa
229 45 Street is a walk-up apartment building built in 1920 in Brooklyn, 11220. It has 3 residential units across 2 floors. The owner of record is Gomez Ninfa. HPD has recorded 65 housing violations here, most recently on May 1, 2026. 6 of the 50 most recent violations are still open.
- HPD violations
- 65
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 6
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 65
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jul 14, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Remove the illegal fastening double cylinder key operated lock installed at gate to building
Jul 14, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - BHazardous
Refit north 1 lower window sash at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2025 · Apt 2
Closed — Violation closed - BHazardous
Remove the illegal fastening double cylinder key operated lock installed at entrance gate to building
Mar 21, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 21, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 21, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 21, 2025
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof .. at public hall, 2nd story
Mar 21, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Mar 21, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of shoe rack at public hall, 2nd story
Mar 21, 2025
Closed — Violation dismissed - BHazardous
Refit north 2 lower window sash at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the kitchen located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Open — Not complied with - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door in the kitchen located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 6 in the entire apartment located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame in the 1st room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame in the 2nd room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the bathroom located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd door from north at east wall in the 4th room from north at west located at apt 2floor, 2nd story, 1st apartment from west at north
Apr 10, 2023 · Apt 2FLOOR
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st window frame from west at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 2nd room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 3 sq ft at the north wall and east wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the 4th room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame, 1st door frame from east at south wall in the 2nd room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Jan 11, 2023 · Apt 2
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Window frame
Apr 6, 2023 · Apt 2FLOOR
Close - Paint/plaster
Door/frame
Apr 6, 2023 · Apt 2FLOOR
Close - Flooring/stairs
Floor
Apr 6, 2023 · Apt 2FLOOR
Close - Paint/plaster
Wall
Apr 6, 2023 · Apt 2FLOOR
Close - Safety
Fire escape
Apr 6, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 6, 2023 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 1,952 ft²
- Lot area
- 2,003 ft²
- Zoning
- M1-2D
- Community board
- 307
- Council district
- 38
- Block / lot
- 736 / 71
- Assessed value
- $76,740
- Landmark / historic district
- No
HPD registration #361118, last renewed Aug 19, 2025.
Questions about 229 45 Street
Who owns 229 45 Street?
The owner of record in NYC Department of City Planning PLUTO data is Gomez Ninfa.
Does 229 45 Street have violations?
Yes. NYC HPD has recorded 65 housing violations at this property.
Is 229 45 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 229 45 Street built?
City records list 1920 as the year it was built.
How many apartments are in 229 45 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.