Violations at 452 40 Street
Brooklyn, NY 11232 · BBL 3-00714-0027 · Back to the property
HPD housing violations
31 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum temperature of 130 degrees-found 150 degrees in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jan 22, 2016 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 6th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 5th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 1st room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 6th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 5th room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 6th room from east located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 6th room from east located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector ,(missing), located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 4; wg to repair = 0; in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free-standing radiator at public hall, 1st story
Nov 8, 2014
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Nov 8, 2014
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system ,door locked at public hall, 1st story
Nov 8, 2014
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective window lower sash counter balance in the kitchen located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 2nd apartment from south at west
Nov 8, 2014 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east, north and south walls in the kitchen located at apt 3b, 3rd story, 2nd apartment from south at west
Jul 20, 2004 · Apt 3B
Closed — Violation closed - BHazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 3-b, 3rd story, 2nd apartment from east at south
Jun 21, 2002 · Apt 3-B
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt 3-b, 3rd story, 2nd apartment from east at south
Jun 21, 2002 · Apt 3-B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperative / quinonez lysette / in the foyer located at apt 1b, 1st story, apartment at west
Apr 25, 2000 · Apt 1B
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected creating bathroom water closet & washbasin cellar center.
Jun 14, 1983
Closed — Violation closed
DOB building violations
13 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations
5 ECB violations, newest first.
- Hazardous
Failure to comply w/ commissioners order to correct viol #34524345y issued on 6/28/06 for work w/ a permit in cellar for partitions & plumbing. no access, no permits filed at time of the issuing of this nov.
Mar 4, 2007 · Penalty $3,000
Resolve - Hazardous
Failure to comply w/commissioners orders to obtain a permit for violating conditions observed on ecb#34524345y issued 6/28/06 for work w/o apermit @ basement for plumbing & partitions.remedy:comply w/commission
Oct 31, 2006 · Penalty $1,500
Resolve - Hazardous
Work w/o a permit-hazardous.work noted:sheetrock partition erected thru-out basement level to subdivide into 6 single room occupancy.width 23pc bathroom & kitchen.each room having cylinder lock.
Jun 28, 2006 · Penalty $800
Resolve - Hazardous
Failure to maintain.bldg-defects noted:drain leader pipe from roof drain is not connected to sewer line.which let the rain water to flow onto concrete side yard,at left side of property.
Jun 28, 2006 · Penalty $800
Resolve - Hazardous
Failure to provide at least 2 means of egress from room or space whererequired.noted:at cellar level consists of approx 6 single room occupancy,each w/ entry door w/ cylinder locks.no natural or adequate ventil
Jun 28, 2006 · Penalty $480
Resolve