Violations at 444 40 Street
Brooklyn, NY 11232 · BBL 3-00714-0019 · Back to the property
HPD housing violations
The newest 50 of 224 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch , 4th story
Jan 9, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to boiler door at boiler room
Oct 27, 2025
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Oct 27, 2025 · Apt 3L
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2022
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock at vestibule door at public hall, 1st story
May 18, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
May 18, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
May 18, 2022
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling at public hall, 3rd story
May 18, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at bulkhead ceiling at public hall, 3rd story
May 18, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at bulkhead at public hall, 3rd story
May 18, 2022
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling at bulkhead at public hall, 3rd story
May 18, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective mortise lock on door from vestibule to 1st story public hall.
Feb 15, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at all walls in the 6th room from north located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Open — Not complied with - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at all walls in the 5th room from north located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Open — Not complied with - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at all walls in the 2nd room from north located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Open — Not complied with - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood panels at all walls in the 1st room from north located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling apprx 1 square feet in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 1, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Feb 1, 2022 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors at bulk-head at public hall stairs, 3rd story
Dec 22, 2021
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors ... in the entrance located at apt 2l, 2nd story, 1st apartment from south at west
Dec 22, 2021 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees f at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 22, 2021 · Apt 2L
Closed — Violation closed - ANon-hazardous
Refit door at boiler room
Aug 24, 2021
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .... in the entrance located at apt 1r, 1st story, 2nd apartment from south at west
Aug 24, 2021 · Apt 1R
Closed — Violation closed - ANon-hazardous
Refit bulkhead door , 3rd story
Aug 24, 2021
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of air condioner unit at fire escape window in the 6th room from east located at apt 1l, 1st story, 1st apartment from south at west
Aug 24, 2021 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 12, 2021
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective building entrance door lock at public hall
Aug 12, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st story
Aug 12, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at north wall at public hall, 1st story
Aug 12, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at north and east at intermediate landing at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at roof bulkhead at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling and east wall at roof bulkhead at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at roof bulkhead at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane a skylight at roof bulkhead at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - CImmediately hazardous
Provide wire metal mesh net at skylight at roof bulkhead at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at roof bulkhead at public hall, 3rd story
Aug 12, 2021
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective locking device on door, vestibule at public hall, 1st story
Jun 28, 2021
Closed — Violation closed - CImmediately hazardous
Replace with new the missing heavy duty mechanical lockset at vestibule door , 1st story
Jun 24, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 29, 2021
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 1l, 1st story, 1st apartment from east at south
Apr 29, 2021 · Apt 1L
Closed — Violation closed
DOB building violations
10 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations
No ECB violations on record