roofy

Violations at 438 39 Street

Brooklyn, NY 11232 · BBL 3-00709-0020 · Back to the property

HPD housing violations

28 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 22, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 6, 2021

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation dismissed
  • BHazardous

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following **minimum 100 watts required***

    Jun 20, 2010

    Open — Nov certified late
  • ANon-hazardous

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration north bedroom door in the entire apartment located at apt 4l, 4th story, 1st apartment from north at east

    May 25, 2005 · Apt 4L

    Open — Nov sent out
  • ANon-hazardous

    Refit upper sash southeast window in the 1st room from east located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective and or make operable lower sash window 1 and in the 2nd room from east located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of exposed electrical wires ceiling in the bathroom located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective sink base cabinet in the kitchen located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls in the bathroom located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective plaster board ceiling in the bathroom located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the foyer located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective entrance door in the 2nd room from east located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of vermin mice and roaches in the entire apartment located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic wall tile in the bathroom located at apt 1, 1st story, apartment at north

    Mar 26, 2003 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening double cylinder key operated lock installed in the door at the vestibule at public hall, 1st story

    Oct 16, 2001

    Open — Nov certified late
  • BHazardous

    Replace with new the missing wood panel under the north east window in the 1st bedroom from north located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Properly repair the broken or defective lower window sashes in the 1st bedroom from north located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Replace with new the missing sash chain lower window in the 2nd bedroom from north located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Properly repair with similar material the broken or defective wood flooring in the 3rd bedroom from north located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Replace with new the broken or defective metal ceiling around the electric light fixture in the kitchen located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Properly repair the broken or defective improperly counter balanced upper and lower window sashes in the kitchen located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Replace with new the broken or defective wood flooring at the radiator pipe in the kitchen located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    M/d law abate the nuisance consisting of splintered wood flooring in the kitchen located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late
  • BHazardous

    Repair the roof so that it will not leak over in the kitchen located at apt 3-l, 3rd story, apartment at east

    Oct 16, 2001 · Apt 3-L

    Open — Nov certified late

DOB building violations

7 DOB violations, newest first.

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations

No ECB violations on record