674 4 Avenue
Brooklyn, NY 11232BBL 3-00639-0136Map
Owner of record: Brolub Holdings LLC
674 4 Avenue is a mixed residential and retail building built in 1900 in Brooklyn, 11232. It has 3 residential units across 3 floors. The owner of record is Brolub Holdings LLC. HPD has recorded 22 housing violations here, most recently on July 29, 2007.
- HPD violations
- 22
- DOB violations
- 5
- ECB violations
- 4
- HPD complaints
- 116
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Properly repair with similar material the broken or defective ceramic-tile at north,south and east walls in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jul 29, 2007 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jul 29, 2007 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jul 29, 2007 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Jul 29, 2007 · Apt 2L
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Jul 29, 2007 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective locking assembly at entrance door to the building at public hall, 1st story
Jul 29, 2007
Closed — Violation closed - BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy
Feb 22, 2007
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate , in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south
Nov 29, 2006 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Nov 29, 2006 · Apt 3L
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south
Nov 29, 2006 · Apt 3L
Closed — Violation dismissed
Show 12 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system ... at cellar
Nov 29, 2006
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Oct 18, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counterbalances at north and south windows in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Oct 18, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of no electrical supply at ceiling in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Oct 18, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2f, 2nd story
Oct 18, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall in the kitchen located at apt 2f, 2nd story
Oct 18, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at north and south windows in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from north at east
Oct 18, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the bathroom located at apt 2f, 2nd story, apartment at east
Aug 16, 2006 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Refit windows thru-out in the entire apartment located at apt 2f, 2nd story, apartment at east
Aug 16, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2f, 2nd story, apartment at east
Aug 16, 2006 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings thru-out in the entire apartment located at apt 2f, 2nd story, apartment at east
Aug 16, 2006 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 2nd room from north located at apt 2f, 2nd story, apartment at east
Aug 16, 2006 · Apt 2F
Closed — Violation dismissed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 16, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34981158m issued on 10/13/12. for work w/o a permit merging 2lots to make passageway. remedy: comply w/the comm's order.
Feb 1, 2013
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34981158m issued on 10.13.12 for work w/o permit - merging 2 lots to create passageway. remedy: comply w/code.
Dec 10, 2012
Resolve - Class - 1
Work w/o permit;illegal work noted combing 2 lots making a passageway from 674 4 ave to 168 20st w/no bn or record of contractor for conversion failed to merge lots. access for fd to 168 20st is through 674 4
Oct 13, 2012
Resolve - Non-hazardous
Faliure to maintain left corner of cornice has water damage at down spout of leader corner is deter not a hazarddous condition yet remedy repair and maintain cornice.
Feb 14, 1998 · Penalty $2,500
Resolve
Complaints
- Plumbing
Water-leaks
Jan 10, 2014 · Apt GRND
Close - Heating
Heat related
Jan 10, 2014 · Apt GRND
Close - Plumbing
Basin/sink
Jan 10, 2014 · Apt GRND
Close - Nonconst
Vermin
Oct 5, 2009 · Apt 2F
Close - Nonconst
Vermin
Oct 5, 2009 · Apt 2F
Close - Paint/plaster
Wall
Oct 5, 2009 · Apt 2F
Close - Paint/plaster
Wall
Oct 5, 2009 · Apt 2F
Close - Paint/plaster
Ceiling
Oct 5, 2009 · Apt 2F
Close - General
Windows
Oct 5, 2009 · Apt 2F
Close - Nonconst
Vermin
Sep 29, 2009 · Apt 2F
Close
Show 40 more ↓
- Nonconst
Vermin
Sep 29, 2009 · Apt 2F
Close - Paint/plaster
Wall
Sep 29, 2009 · Apt 2F
Close - Paint/plaster
Ceiling
Sep 29, 2009 · Apt 2F
Close - Plumbing
Shower-stall
Sep 29, 2009 · Apt 2F
Close - Heating
Heat related
Jan 4, 2008 · Apt 3R
Close - Heating
Heat related
Jan 4, 2008 · Apt 3R
Close - Heating
Heat related
Jan 4, 2008 · Apt BLDG
Close - Electric
Electric-supply
Oct 11, 2007 · Apt 2L
Close - Electric
Electric-supply
Oct 11, 2007 · Apt 2L
Close - Nonconst
Vermin
Aug 17, 2007 · Apt 2F
Close - Nonconst
Vermin
Aug 17, 2007 · Apt 2F
Close - Nonconst
Rubbish
Aug 17, 2007 · Apt 2F
Close - Nonconst
Vermin
Aug 9, 2007 · Apt 2F
Close - Nonconst
Vermin
Aug 9, 2007 · Apt 2F
Close - Nonconst
Rubbish
Aug 9, 2007 · Apt 2F
Close - Nonconst
Rubbish
Aug 9, 2007 · Apt 2F
Close - Paint/plaster
Wall
Jul 24, 2007 · Apt 2L
Close - General
Ceramic-tile
Jul 24, 2007 · Apt 2L
Close - Appliance
Electric/gas range
Jul 24, 2007 · Apt 2L
Close - Plumbing
Water supply
Jul 18, 2007 · Apt 2L
Close - General
Doors
Jul 18, 2007 · Apt 2L
Close - Plumbing
Water-leaks
Jul 18, 2007 · Apt 2L
Close - Plumbing
Water-leaks
Jul 18, 2007 · Apt 2L
Close - Plumbing
Water supply
Jul 12, 2007 · Apt 3L
Close - Plumbing
Water supply
Jul 5, 2007 · Apt 3L
Close - General
Doors
Jul 2, 2007 · Apt 2L
Close - Plumbing
Water supply
Jul 2, 2007 · Apt 2L
Close - Electric
Lighting
Jun 22, 2007 · Apt 2F
Close - Nonconst
Rubbish
Jun 22, 2007 · Apt 2F
Close - Nonconst
Vermin
May 7, 2007 · Apt 2F
Close - Nonconst
Rubbish
May 7, 2007 · Apt 2F
Close - Nonconst
Janitor/super
May 7, 2007 · Apt 2F
Close - Nonconst
Rubbish
May 4, 2007 · Apt 3L
Close - Electric
Lighting
May 4, 2007 · Apt 3L
Close - Plumbing
Water supply
Feb 20, 2007 · Apt 2F
Close - Heating
Heat related
Feb 17, 2007 · Apt 2F
Close - Heating
Heat related
Feb 7, 2007 · Apt 2F
Close - Heating
Heat related
Feb 7, 2007 · Apt 2F
Close - Heating
Heat related
Feb 5, 2007 · Apt 2F
Close - Paint/plaster
Wall
Jan 3, 2007 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1900
- Floors
- 3
- Residential units
- 3
- Building area
- 3,050 ft²
- Lot area
- 1,500 ft²
- Zoning
- M1-2D
- Community board
- 307
- Council district
- 38
- Block / lot
- 639 / 136
- Assessed value
- $409,950
- Landmark / historic district
- No
HPD registration #814958, last renewed Oct 8, 2025.
Questions about 674 4 Avenue
Who owns 674 4 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Brolub Holdings LLC.
Does 674 4 Avenue have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 674 4 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 674 4 Avenue built?
City records list 1900 as the year it was built.
How many apartments are in 674 4 Avenue?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.