215 19 Street
Brooklyn, NY 11232BBL 3-00634-0057Map
Owner of record: 215 South Slope, LLC
215 19 Street is a two-family home built in 1910 in Brooklyn, 11232. It has 2 residential units across 3 floors. The owner of record is 215 South Slope, LLC. HPD has recorded 21 housing violations here, most recently on November 24, 2025. 20 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 26
- ECB violations
- 37
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 4, 2024
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 2, 2019
Open — Info nov sent out - CImmediately hazardous
Replace with new the missing building entrance door at public hall, 1st story
Sep 26, 2019
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wire at wall light fixture in the exterior wall at building front
Sep 26, 2019
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door to building , 1st story
Aug 21, 2019
Open — Nov sent out
Show 11 more ↓
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed romex along wall and base board to provide heat for electrical heater in the entire apartment located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from north located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling and north wall in the 4th room from north located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall in the 4th room from north located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective door at sink cabinet in the kitchen located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 1st room from north located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing skylight in the 2nd room from north located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 10 sf at ceiling in the bathroom located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 2nd room from north located at apt 2fl, 2nd story
May 9, 2019 · Apt 2FL
Open — Nov sent out
DOB building violations · 26
- Construction other optional
Failure 2 comply w/bc3303.13.3. operations halted 3+ months. site not graded to prevent water damage. monitoring plan (09/12/24) by anthony f.marmo recommends optical monitoring twice/week&visual inspections remedy: comply w/site monitorng plan.inspect weekly & after rainfall obtain dewatering permits.reports by nys pe.notify dob of movement
Sep 13, 2024
Dob violation - active - Construction other optional
Uncertified underpinning. 2-story bldg & adj. property damgd by demo, needed emergency underpinning to re-support foundation remedy: failure to comply with commissioner's order contained in vio #041124ce30702pt. comply with order by 8/1/24
Jun 25, 2024
Dob violation - dismissed - Construction other optional
Uncertified underpinning. 2-story bldg & adj. property damgd by demo, needed emergency underpinning to re-support foundation. remedy: comply w code,retain nys pe 4 u.p. docs & sia sign-off,assess & repair damage.file & permit u.p. by 05/31/24.assessmt by 5/10
Apr 11, 2024
Dob violation - dismissed - Construction other optional
Unstable 2-story wood & metal building+yard. unsupported floor framing walls, anchorage remedy: fail2comply w commisr's ordr#102023ce30701pt, ,iss'd 10/20/23 wrk not strtd by 11/27.strt stblztn wrk by 12/29/bldg & rear yard
Nov 30, 2023
Dob violation - active - Construction other optional
Failure to maintain. unstable 2-story wood & metal building + yard unsupported floor framing, walls, anchorage remedy: comply w code. retain rdp for stabilization. submit plans by 10/25. start work under permit by 11/27. submit docs for cseng review
Oct 20, 2023
Dob violation - active - Construction other optional
2-sty bldg destabilized by demo of interior walls, exp#3wall& rear 3- sty extension. deficient gravity & lateral system destabilizd adj rear yards. remedy: hire nys pe to submit plan, suprvse & intrprt monitoring,install equip & take baselines by 10/5/23.take readngs daily
Oct 4, 2023
Dob violation - active - Construction other optional
Emergency wrk, 2-sty bldg destabilized by demo of interior walls, exp# 3 wall & rear 3-sty extension. deficient gravity & lateral system, destabilized adj rear yards. remedy: hire nys pe, cs & gc 2 stabilize bldg, safegrd site, adj prop & public. full-time pe&cs supervision start by 10/5/23
Oct 4, 2023
Dob violation - dismissed - Construction other optional
2-sty bldg destabilized by demo of interior walls, exp#3wall& rear 3- sty extension. deficient gravity & lateral system destabilized adj rear yards. remedy:.hire nys pe to perform daily structural stability inspections. perform first inspection by 10/5/23
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 19, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed
Show 16 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 17, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Immediate emergency anythingoptional
Install approx. 20 linear feet of sidewalk shed the entire front (exp#1) of premises for protection
Apr 12, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2016
Dob violation - dismissed
ECB violations · 37
- Class - 1
Failure to comply with the commissioner's order contained in violation#062524ce30701pt(control #359009) issued on 06/25/24 which documented a failure to comply with previous violation #041124ce30702pt(control #
Dec 23, 2024 · Penalty $6,250
Resolve - Class - 1
At the time of my inspection of a 3 story building, i observed 3 story building at rear of construction site has being demolish and excavation/foundation down approximately10 to 12 feet.upon review of the depar
Oct 5, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection of an excavation job site at exposure 3 of a 3 story building, observed that no protection were provided to protect the adjacent properties at exposure 2/4 which creates an unsafe falling
Oct 2, 2023 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations. observed partial collapse of foundation wall at exposure #3 effecting neighboring property. no shoring., safeguard public and p
Sep 29, 2023 · Penalty $12,500
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35631967z issued on 10/29/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain build
Dec 16, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.at the time of my inspection and observed at rooftop a metal roofing on exp2.exp4 is leaning toward on both side of adjacent property.possible loose.remedy:
Oct 29, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35582511m issued on 07/12/21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bldg in code
Sep 8, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: observed during inspection of exp#2&4 roof level have metal railing that have become loose & are leaning outward to the adjacent property on both sides.
Jul 12, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. at roof top level,exp#4&2 railing are dislodged & leaning toward both adjacents. 217 19th st & 213 19st. remedy: repair &/or replace.
May 20, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner:at exp.#1 above 2nd fl windows parapet is leaning;tilted w/railing on both side are loose/misplaced.possible bricks if not attending can fall onto front yard or
Jan 27, 2021 · Penalty $3,125
Resolve
Show 27 more ↓
- Class - 1
Failure to maintain building in code-compliant manner.at the time of my inspection and observed at rooftop exp#2&4 metal railing has been dislodged or tilting toward adjacent neighbors,chimney is tilted toward
Dec 21, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg. noted: at exp#1 the parapet wall is leaning into the bldg. this dangerous condition should be addressed asap. remedy: maintain bldg/make condition safe.
Oct 13, 2020 · Penalty $1,250
Resolve - Class - 1
Reissue#39016086j date of issue 1-21-20 failure to maintain bldg in code compliant manner. this bldg is facing 19 st. at roof top level at exp#4 metal railing has dislodged & right side chimney leans onto adjac
Sep 11, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35384597p issued on 04/10/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Mar 10, 2020
Resolve - Class - 1
Reissue ecb#35459178y issued 11/29/2019.failure to maintain building in code compliant manner at time of inspection observed,at front of thebuilding at exposure#1 top above the second floor window the wall is l
Feb 13, 2020 · Penalty $3,125
Resolve - Class - 1
At roof top level, at exposure 4, metal railing has dislodged and leans onto adjacent chimney at 217 19th st., repair and/replace
Jan 21, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35384597p issued on 04/10/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at 2nd fl. remedy: comply w/comm's order &/or
Dec 13, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35384598r issued on 04-11-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for working while on a
Nov 29, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner noted observed at front of buildings at (exposure #1) ta top above th eseocn dfloor window the wall is leaning inward repair and or replace
Nov 29, 2019 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35384598r issued on 04-11-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. unlawfully continued to work while on notice of stop work order
Oct 15, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35434465x issued on 06-25-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. at time of
Oct 15, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35384597p issued on 04/10/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at 2nd fl. no permits or cert of correction o
Oct 15, 2019 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35384598r issued on 04-11-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. unlawfully continued working while on notice of a swo#3115841.
Aug 29, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35434465x issued on 06-25-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner at exp#1 abov
Aug 29, 2019
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35384597p issued on 04/10/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o a permit at 2nd fl. remedy: comply w/comm's order &/or
Aug 29, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation# 35384598r issued on 04/11/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for: unlawfully contin
Jun 25, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner. at the time of inspection and observed, at exp #1 front facade above 2nd floor rooftop and masonary/brick works is leaning inward with some missing bricks.
Jun 25, 2019 · Penalty $6,250
Resolve - Class - 1
Unlawfully continued working while on notice of a swo. @ tim eof insp 1 male worker working @ 1st fl of premises contrary to file swo # 3115841. remedy: comply with swo.
Apr 11, 2019
Resolve - Class - 1
Work w/o a permit.at time of inspection at 2nd floor of premises,electrical working and plumbing work done without permit.rem:obtain permit.
Apr 10, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. observed brick & stone rail masonry @ roof level on exp. 1 partially missing with remaining masonry leaning in danger of collapse. also observed substantial
Apr 9, 2019
Resolve - Class - 1
Work w/o permit on gas line to gas fired heater.3pm time of insp i observed new gas piping in cellar/bsmt from meter to gas fired heatr.no permit for this job on dob record.photos taken.utility company loaded g
Feb 25, 2016 · Penalty $8,000
Resolve - Class - 1
Gas being supplied to bldg w/o inspection & cert. by dob. at time of inspection(3:20 pm) observed new gas piping in cellar/bsmt from gas meter to gas fired heater unit. no inspection for gas piping on dob recor
Feb 25, 2016 · Penalty $5,000
Active - Class - 2
Electrical work w/o a permit. installed new gas heaters in basement. no permit on file. rmdy: obtain permit.
Feb 25, 2016 · Penalty $4,000
Resolve - Class - 1
Work w/o permit work noted i observed 1:30pm in the basement and 1st flr gas boilers gas hot water heater disconnected, gas lines 1"at 1st flr has been capped off. and electric hot water heater with hot and co
Oct 21, 2015 · Penalty $8,000
Active - Hazardous
Failure to protect adjoining structure during excavation operation work noted at front of premises north excavation done approx 20'x8'x6' w/o protection adjacent property sheeth side left and right 213 bldg lea
Aug 14, 2003 · Penalty $5,000
Resolve - Hazardous
Work without permit work noted excavation of front yard approx six ft down and erected a door at center of foundation wall job # 301534757 filled 4/18/03 was drapped stop all work remedy: obtain a permit
Jun 5, 2003
Resolve - Hazardous
Work w/o a permit hazardous are.complete gut rehab done such as new wood metal joists installed throughout and metal and wood framing erected at various locations.also new cinder blocks extension erected at
May 22, 2003 · Penalty $800
Resolve
Complaints
- Water leak
Damp spot
Sep 13, 2019 · Apt FIRSTF
Close - Flooring/stairs
Floor
Sep 13, 2019 · Apt FIRSTF
Close - Unsanitary condition
Mold
Sep 13, 2019 · Apt FIRSTF
Close - Electric
Wiring
Sep 13, 2019 · Apt FIRSTF
Close - Electric
No lighting
Sep 13, 2019 · Apt FIRSTF
Close - Door/window
Door
Sep 13, 2019 · Apt FIRSTF
Close - Unsanitary condition
Mold
Sep 13, 2019 · Apt 1
Close - Unsanitary condition
Mold
Sep 9, 2019 · Apt 1
Close - Door/window
Door
Sep 9, 2019 · Apt 1
Close - Flooring/stairs
Floor
May 17, 2019 · Apt 2FL
Close
Show 24 more ↓
- Electric
Outlet/switch
May 17, 2019 · Apt 2FL
Close - Flooring/stairs
Floor
May 17, 2019 · Apt 2FL
Close - Unsanitary condition
Pests
May 17, 2019 · Apt 2FL
Close - Water leak
Heavy flow
May 17, 2019 · Apt 2FL
Close - Water leak
Heavy flow
May 17, 2019 · Apt 2FL
Close - Paint/plaster
Ceiling
Apr 22, 2019 · Apt 2FL
Close - Water leak
Heavy flow
Apr 22, 2019 · Apt 2FL
Close - Paint/plaster
Ceiling
Apr 22, 2019 · Apt 2FL
Close - Unsanitary condition
Mold
Apr 22, 2019 · Apt 2FL
Close - Electric
Wiring
Apr 22, 2019 · Apt 2FL
Close - Flooring/stairs
Floor
Apr 20, 2019 · Apt 2FL
Close - Water leak
Heavy flow
Apr 20, 2019 · Apt 2FL
Close - Water leak
Heavy flow
Apr 20, 2019 · Apt 2FL
Close - Water leak
Heavy flow
Apr 20, 2019 · Apt 2FL
Close - Unsanitary condition
Mold
Apr 20, 2019 · Apt 2FL
Close - Heat/hot water
Entire building
Mar 16, 2019 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 12, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 12, 2018 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 12, 2018 · Apt 1FL
Close - Heat/hot water
Apartment only
Jan 28, 2017 · Apt BMT
Close - Electric
Wiring
Feb 26, 2016 · Apt 2FL
Close - Electric
Wiring
Feb 26, 2016 · Apt 2FL
Close - Electric
Wiring
Feb 26, 2016 · Apt 2FL
Close - Electric
Wiring
Feb 26, 2016 · Apt 2FL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 31, 2026 | $1,100,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B9)
- Year built
- 1910
- Floors
- 3
- Residential units
- 2
- Building area
- 3,322 ft²
- Lot area
- 1,669 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 38
- Block / lot
- 634 / 57
- Assessed value
- $194,760
- Landmark / historic district
- No
HPD registration #819304, last renewed Dec 11, 2018.
Questions about 215 19 Street
Who owns 215 19 Street?
The owner of record in NYC Department of City Planning PLUTO data is 215 South Slope, LLC.
Does 215 19 Street have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 215 19 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 215 19 Street built?
City records list 1910 as the year it was built.
How many apartments are in 215 19 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.