650 18 Street
Brooklyn, NY 11215BBL 3-00634-0047Map
Owner of record: Hawd Alashraf LLC
650 18 Street is a mixed residential and retail building built in 1922 in Brooklyn, 11215. It has 2 residential units across 3 floors. The owner of record is Hawd Alashraf LLC. HPD has recorded 34 housing violations here, most recently on September 22, 2026. 32 of the 34 most recent violations are still open.
- HPD violations
- 34
- DOB violations
- 4
- ECB violations
- 2
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 34
- BHazardous
Properly repair or replace the broken or defective door casing in the 4th room from north located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Sep 22, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 22, 2026
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical outlet and fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Sep 18, 2026 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 2nd story, 1st apartment from north at east
Sep 18, 2026 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing latch at entrance at public hall, 1st story
Sep 18, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Sep 18, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and north wall at public hall, 2nd story
Sep 18, 2026
Open — Nov sent out
Show 24 more ↓
- BHazardous
Remove all encumbrances consisting of household items- air condition units and cabinet at public hall, 2nd story
Sep 18, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 18, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at grouts joints of the ceramic tiles at north, east, south and west walls around shower stall, in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Aug 10, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all electric outlets, in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Aug 10, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles , in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Aug 10, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective, in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Aug 10, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies, in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Aug 10, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of the exposed electric extension cords from generator in the west sections. extension roof to the room floor. in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from north at east
Aug 10, 2026 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing door knob at front entrsnce door to building, , 1st story
Aug 10, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 10, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of operated gasoline generator with extension cords, in the west sections extension roof, to supply electric service at apt 1, on 2nd story,
Aug 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Aug 4, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden door frame in the 1st room from east at north located at apt 1, 2nd story, 1st apartment from north at east
Aug 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east located at apt 1, 2nd story, 1st apartment from north at east
Aug 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 1, 2nd story, 1st apartment from north at east
Aug 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Aug 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the foyer located at apt 1, 2nd story, 1st apartment from north at east
Aug 4, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ar ceiling in the 2nd room from north located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures no electric supply in entire apartment cause unknown no access to basement in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling in the 2nd room from north located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door frame at entry in the 1st room from north located at apt 1, 2nd story, 1st apartment from north at east
Jul 25, 2026 · Apt 1
Open — Nov sent out
DOB building violations · 4
- Construction other optional
Structure rendered non compliant. at time of inspection observed cella r flooded due to water coming through rubble foungdation at exposure 4 fundation wall structure must be maintained in code compliaant manner
Oct 11, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 2
- Class - 2
Work without a permit. noted observed at exposure 2 there is a electrical disconnect for condenser for a/c units, there is no job filing for this work ., obtain all permits
Sep 3, 2024 · Penalty $6,250
Active - Class - 2
Work without a permit . noted observed exposure 1,and 2 there is a sign with black ground with wording town delicatessen, and grill, the second sign at exposure 2 with red background with wording super mega,the
Sep 3, 2024 · Penalty $6,250
Active
Complaints
- Electric
Power outage
Sep 18, 2026 · Apt 1
Close - Door/window
Door
Sep 18, 2026 · Apt 1
Close - Electric
Power outage
Sep 17, 2026 · Apt 1
Close - Electric
Power outage
Aug 28, 2026 · Apt 1
Close - Electric
Power outage
Aug 8, 2026 · Apt 1
Close - Door/window
Door
Aug 8, 2026 · Apt 1
Close - Door/window
Door
Jul 31, 2026 · Apt 1
Close - Door/window
Door frame
Jul 31, 2026 · Apt 1
Close - Electric
Outlet/switch
Jul 31, 2026 · Apt 1
Close - Door/window
Door
Jul 24, 2026 · Apt 1
Close
Show 3 more ↓
- Electric
Power outage
Jul 24, 2026 · Apt 1
Close - Electric
Power outage
Jul 24, 2026 · Apt 1
Close - Door/window
Door
Jul 24, 2026 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1922
- Floors
- 3
- Residential units
- 2
- Building area
- 1,835 ft²
- Lot area
- 1,400 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 38
- Block / lot
- 634 / 47
- Assessed value
- $103,680
- Landmark / historic district
- No
Questions about 650 18 Street
Who owns 650 18 Street?
The owner of record in NYC Department of City Planning PLUTO data is Hawd Alashraf LLC.
Does 650 18 Street have violations?
Yes. NYC HPD has recorded 34 housing violations at this property.
Is 650 18 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 650 18 Street built?
City records list 1922 as the year it was built.
How many apartments are in 650 18 Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.