Owner of record: Eclectic Properties Group LLC
199 King Street is a garage / gas station built in 1931 in Brooklyn, 11231. The owner of record is Eclectic Properties Group LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 23
- ECB violations
- 56
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 23
- Construction other optional
Ewo: 1 story structure w/masonry brick, exterior facade @ exp1 vertica & horizontal cracks cause separation & loose mortar between brick in danger of falling into sidewalk public. remedy:immediately install adequate safe measures to protect public. retain nys professional eng to evaluate facade stabalizing/repairing the structure by 10/28/2025
Oct 14, 2025
Dob violation - active - Construction other optional
Ftm.on 11/9/23,obsrvd roof in state of disrepair w/waterdamage & saggng leavng trsses improperly braced.obsrvd masonry perimeter walls in state of disrepair w/diagonal crcks throughout.comply immediately with control #343306
Dec 5, 2023
Dob violation - active - Construction other optional
Ftm.on 11/9/23,obsrvd roof in state of disrepair w/watere damage & saggng,leavng tusses improperly bracd.obsrvd masonry perimeter walls in state of disrepair w/diagonal crcks throughout&improperly enclosed comply immediately with control #343307
Dec 5, 2023
Dob violation - active - Construction other optional
Ftm.on 11/9/23,obsrvd masonry walls in state of disrepair w/diagonal cracks&improperly enclosed opening w/unengineered lintel.comply immediately with control #343309
Dec 5, 2023
Dob violation - active - Construction other optional
Ftm.on11/9/23,obsrvd roof in state of disrepair w/water damage&saggng, leaving tusses improperly bracd.obsrvd masonry perimeter walls in state of disrepair w/diagonl crcks throughout&imperoperly enc.1.immed vacate(vacate order exists),2.ownr to engage nyspe&endorsd cntrctr to eval the ent bldg.other prmts to rpair by 11/30/23
Nov 9, 2023
Dob violation - active - Construction other optional
Ftm.on 11/9/23,obsrvd masonry walls in state of disrepair w/diagonal cracks&improperly enclosed opening w/unengineered lindel.ownr to engage nys pe&endorsd cntrctr to eval the ent bldg obtain prmts to rpair by 11/30/23.rpair prmt to be sgnd off by 12/21/2023
Nov 9, 2023
Dob violation - active - Construction other optional
Ftm.on 11/9/23,obsrvd roof in state of disrepair w/waterdamage&saggng leavng tresses improperly braced.obsrvd masonry perimeter walls in state of dsrepair w/diagonal crcks throughout.1.immed vacate premises, 2.ownr to engage nys pe&enclosed cntrctr to eval the ent bldg.obtn prmts to rpair by 11/30/23
Nov 9, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code complaint manner. wooden truss roof structural integrity is questionable. roofs underside experienced water damage & neglect, exposing the wood truss to corrosion. request for nyspe report.
Nov 2, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2011
Dob violation - active
Show 13 more ↓
- Construction other optional
C-construction other optional
Oct 6, 2011
Vpw*-violation unserved ecb-work without permit-dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Construction other optional
Comply with vacate order
Sep 9, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
May 4, 1990
Vp-violation unserved ecb-active
ECB violations · 56
- Class - 2
Failure to maintain buildings in code compliant manner.at exposure#1 observed vertical and horizontal cracks at the masonry brick facade approx.5-6 foot.at exposure#3 observed vertical and horizontal cracks at
Apr 20, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner.. noted at exp#1(sullivan st) above rolldown gate step crack in brick facade. at exp#3 (king st) step crack in brick facade above door. ., repair and/replac
Jan 8, 2026 · Penalty $5,000
Active - Class - 1
Failure to obey a vacate order from the commissionerat the time of inspection, observed2 workers servicing bus., comply with vacate order, comply with vacate order
Jan 8, 2026 · Penalty $10,000
Active - Class - 1
Failure to maintain building in code-compliant manner. as noted at time of inspection observed a 1 story structure masonry building with brick and mortar facade. observed at exposure #1, vertical and horizontal
Oct 14, 2025 · Penalty $2,500
Active - Class - 1
Failed to comply w/ vacate order. at the time of inspection, observed 2 workers servicing bus., comply with vacate order
May 2, 2025
Resolve - Class - 1
Observed step crack in brick facade, above roll down gate at exp #1. step crack above door exposure #3. several step cracks at interior east party wall. wood truss roof structural stability questionable due to
May 2, 2025 · Penalty $5,000
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $12,500
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $1,250
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $12,500
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $12,500
Active
Show 40 more ↓
- Class - 1
Failure to maintain building in code compliant manner. noted at exp#1 (sullivan st) above rolldown gate step crack in brick facade. at exp#3 (king st) step crack in brick facade above door. at interior east par
Nov 2, 2023 · Penalty $6,250
Active - Class - 1
Fail to comply w/the commissioner's order contained in n.o.v. #34854285n issued on 08/11/10.work w/o a permit.erected a wooden structure.remedy:comply w/the commissioner's order.
Oct 9, 2014 · Penalty $12,000
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34854285n issued on 8/11/10. work w/o permit erected wooden structure. remedy: comply w/the comm's order.
Aug 25, 2014 · Penalty $6,000
Active - Class - 1
Failure to comply w/the commissioner's order in notice of violation #34854285n issued on 08/11/10.for work w/o a permit.note:at the interior of 1)story garage a 2)story wooden structure erected w/o permit.rem:c
Jun 17, 2014 · Penalty $24,000
Active - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 34854285n issued on 08/11/10. for work w/o a permit. note :@ the interior of 1 story garage a 2 story wooden structure was erecte
Apr 25, 2014
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34854285n issued on 8/11/10. (work w/o permit). remedy: comply w/the comm's order.
Feb 7, 2014 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34854285n issued on 8.11.10. work w/o permit. in 1 sty garage: erected wood structure w/plumbing, electric and gas lines. remedy: comply w/the
Dec 23, 2013
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34854285h issued on 11.22.12. noted: at interior of 1 sty garage erected 2 sty wooden structure and installed electrical, gas and plumbing lines
Sep 9, 2013 · Penalty $2,400
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34854285n issued on 11/22/12. electrical,gas & plumbing lines on 1st & 2nd flrs w/o permit. remedy: comply w/the comm's order.
Jul 26, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34854285n issued on 11.22.12 for construction work done w/o a permit. remedy:comply w/the commissioner's order.
May 4, 2013 · Penalty $6,000
Active - Class - 1
Failure to comply w/the commissioner's order contained in nov #34854285n issued on 8.11.10 for work w/o a permit. 2 sty wood structure erected. remedy: comply w/the commissioner's order.
Mar 21, 2013 · Penalty $6,000
Active - Class - 2
Failure to comply w/commissioner's order to file a certificate of correction w/dob for nov #34987058m issued on 8/21/12 pursuant to 28-204.41rcny 102-01 for failure to maintain conditions.rmdy:file a certifica
Mar 21, 2013 · Penalty $2,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34854285n issued on 8/11/10. for work w/o a permit - erected a wooden structure-2 story-no record of correction in the bldg dept.
Oct 13, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: 11 step woodstairs,leading to 2nd floor,has no handrail. note: 2nd fl being used. therefore there is traffic up & down stairs. remedy: repair &/or repla
Aug 21, 2012 · Penalty $500
Active - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35049790z issued on 6/15/12. erect 1st fl office,2 keyed entry rooms,shower,toilet,kitchen sink - all on 2nd fl,w/o a permit.
Aug 21, 2012 · Penalty $6,000
Active - Class - 1
Failure to comply with the commissioner's order contained in notice ofviolation #34854285n issued on 8/11/10 work without a permit. rem:comply with the commissioner's order.
Jun 15, 2012 · Penalty $24,000
Resolve - Class - 2
Failure to comply with the commissioner's order to file a cert of correction with the dob for notice of violation #34950076r issued on 4-3-12 pursuant to 28-204.4 & 1rcny 102-01. rem:file a cert of correction.
Jun 15, 2012 · Penalty $8,000
Active - Class - 1
Failure to comply w/the comm's order contained in notice of violation #34854285n issued 8-11-10 for work w/o a permit. remedy: comply w/the comm's order.
Apr 3, 2012 · Penalty $24,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in notice ofviolation #34854285n issued on 8-11-10 for work without a permit erected 2 story wood structure in interior space & installed water & waste
Feb 28, 2012 · Penalty $6,000
Resolve - Class - 1
Failure to comply with the commissioner's order contained in notice ofviolation #34854285n issued on 8-11-10 erect partition walls,install ktchen & bathroom plumbing & electric without a permit converted garage
Dec 13, 2011 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 34854285n issued on 08/11/10. for work w/o permit. erectedinterior two story wooden structure, installed gas & plumbing lines to
Dec 9, 2011 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 34934139p issued on 10/06/11. for work w/o permit - removal of gas lines @ 2nd fl as mentioned in nov 34854285n. remedy : comply
Dec 9, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/ comms order contained in nov 34960257p issued on 7/14/11 for nov 34854285n issued on 8/11/10 for creating wooden structure was erected gas plumbing lines installed creating offices on 1st f
Oct 6, 2011 · Penalty $12,000
Resolve - Class - 1
Work noted removed gas lines as per nov 34854285n at 2nd fl rem: obtain permits
Oct 6, 2011 · Penalty $1,600
Active - Class - 2
Failure to maintain stair to mezzanine missing mid/rail &/or vertical posts. remedy: maintain premise as per code.
Oct 6, 2011 · Penalty $500
Active - Class - 1
Failure to comply w/ the comms order contained in nov#34854285n issued on 8/11/10.for creating an interior wooden structure w/ partitions full kitchen & bathroom.rem:comply w/ the comms order.
Jul 14, 2011 · Penalty $6,000
Resolve - Class - 1
Unlawful act. failure to comply w/an order of the commissioner. respondent failed to correct conditions cited in ecb nov #34854285n for work done w/o a permit. 2 level structure erected w/full height partitions
May 17, 2011 · Penalty $6,000
Resolve - Class - 1
Unlawful acts.failure to comply w.an order of the comm's.respondent failed to correct the conditions cited in nov#34854285n.two story structure erected creating sro's.rem:comply w/comm's order
Mar 14, 2011 · Penalty $2,400
Resolve - Class - 1
Unlawful acts.failure to comply w/ an order of the comm.noted:respondent failed to correct the conditions cited in the prior n.o.v.#34854285n work w/o permit.2 sty structure erected creating s.r.o's inside comm
Jan 4, 2011 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/comm's order to vacate premises.noted:vacate order#94/08 has not been complied with as instructed.respondent has historyof non compliance of illegal construction & sro's currently being occu
Jan 4, 2011 · Penalty $2,000
Active - Class - 1
Occupancy contrary to that allowed by the bldg dept records. noted: 2 sty structure erected in garage creating sros at 2nd level of above premises w/kitchen and 3 pc bathroom. at time of inspection 2nd flr was
Oct 7, 2010 · Penalty $2,400
Active - Class - 1
Failure to comply w/an order of the commissioner. note: respondent failed to correct the conditions cited in the prior nov 34854286p for occupancy contrary to that allowed by bldg dept records;sros at 2nd level
Oct 7, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov 34854285n for work w/o a permit erected 2 sty structure inside garage creating sros at
Oct 7, 2010 · Penalty $2,400
Resolve - Class - 2
28-207.4 failure to comply w/ the commissioners order to vacate premises note vacate order 94/08 issued to vacate illegally constructed 6 rm sros w/ a total of 20 beds thruout 2nd fl rooms are still being
Aug 11, 2010 · Penalty $800
Active - Class - 1
Work w/o a permit note @ the interior of 1 sty garage a 2 sty wooden structure was erected electrical gas & plumbing lines installed creating offices on 1st fl & 6 rooms on 2nd fl w/ community bathroom (sink to
Aug 11, 2010 · Penalty $1,600
Active - Class - 1
Occupancy contrary to that allowed by the bldg dept records note bldg dept records indicates that premises is a garage illegal work done to erect a wooden structure 2 stories high being used as office space on
Aug 11, 2010
Resolve - Class - 1
Sec. 28-201.1 failure to comply comm - order to obtain a permit per violation #34640268h for erecting partitions. creating rooms,bathroom,gas line etc at mezzanine level w/o a permit. no records of correction
Oct 23, 2008
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building department records in that commercial garage/factory industrial building occupied with 5 sros at 2nd flr. 5 single rooms 2 beds in each rooms arranged for slee
Apr 14, 2008
Resolve - Non-hazardous
Work w/o a permit work noted 5 single rooms erected at 2nd fl and occupied for sheeting 3pc bathroom and kitchen with hot plate use for cooking observed created w/o approval remedy: obtain a permit if feasible
Apr 14, 2008
Resolve - Hazardous
Occupancy contrary to that allowed by the bldg records which indicatesbldg is garage/factory/industrial use. note: office space at mezzaninelevel converted into 6 sros occupancy dwelling space with bedroom and
Apr 7, 2008
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Garage / gas station (G1)
- Year built
- 1931
- Floors
- 1
- Residential units
- —
- Building area
- 24,575 ft²
- Lot area
- 25,000 ft²
- Zoning
- M2-1
- Community board
- 306
- Council district
- 38
- Block / lot
- 554 / 14
- Assessed value
- $1,544,400
- Landmark / historic district
- No
Questions about 199 King Street
Who owns 199 King Street?
The owner of record in NYC Department of City Planning PLUTO data is Eclectic Properties Group LLC.
Does 199 King Street have violations?
NYC HPD has no housing violations on record for this property.
Is 199 King Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 199 King Street built?
City records list 1931 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.