110 Columbia Street
Brooklyn, NY 11231BBL 3-00538-0001Map
Owner of record: NYC Housing Authority
110 Columbia Street is an elevator apartment building built in 1940 in Brooklyn, 11231. It has 1,836 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has recorded 77 housing violations here, most recently on April 20, 2022. 39 of the 50 most recent violations are still open.
- HPD violations
- 77
- DOB violations
- 272
- ECB violations
- 246
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 77
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the kitchen , the private hallway , the bathroom located at apt 1d, 1st story, 2nd apartment from north at east
Apr 20, 2022 · Apt 1D
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective medicine cabinet in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Jul 17, 2018 · Apt 1C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling , 25 square feet in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Jul 17, 2018 · Apt 1C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Jul 17, 2018 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Jul 17, 2018 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the private hallway , the kitchen located at apt 2a, 2nd story, 1st apartment from west at north
Mar 7, 2017 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak concealed at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Oct 11, 2012 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative electrical outlet at west wall in the 3rd room from east at south located at apt 1b, 1st story, 1st apartment from north at east
Oct 11, 2012 · Apt 1B
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl loose in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Oct 11, 2012 · Apt 1B
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair the broken or defective locking device at door
Sep 11, 2009
Closed — Violation closed - BHazardous
Properly repair the broken or defective ceiling light fixture in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Mar 21, 2007 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling in the 2nd room from east located at apt 1b, 1st story, 1st apartment from north at east
Mar 21, 2007 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from east located at apt 1b, 1st story, 1st apartment from north at east
Mar 21, 2007 · Apt 1B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of a concealed water leak at ceiling in the bathroom located at apt 4c, 4th story, apartment at east
Nov 16, 2005 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4c, 4th story, apartment at east
Nov 16, 2005 · Apt 4C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling, north & west walls in the bathroom located at apt 4c, 4th story, apartment at east
Nov 16, 2005 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling & all walls in the bathroom located at apt 4c, 4th story, apartment at east
Nov 16, 2005 · Apt 4C
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of a concealed water leak at ceiling in the kitchen located at apt 4c, 4th story, apartment at east
Nov 16, 2005 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east & west walls in the kitchen located at apt 4c, 4th story, apartment at east
Nov 16, 2005 · Apt 4C
Open — Nov sent out - BHazardous
Replace with new the broken or defective shut off valve at radiator in the 1st room from east located at apt 4b, 4th story, apartment at east
Mar 5, 2005 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt 4b, 4th story, apartment at east
Mar 5, 2005 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls throughout in the 2nd room from north at east located at apt 4b, 4th story, apartment at east
Mar 5, 2005 · Apt 4B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of concealed water leak at west wall in the bathroom located at apt 4b, 4th story, apartment at east
Mar 5, 2005 · Apt 4B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 4b, 4th story, apartment at east
Mar 5, 2005 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and wall throughout all rooms 6 sty south apt 6a , section '' ''
Sep 8, 1997 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair the broken or defective springs sashes upper and lower window southwest room 6 sty apt 6a , section '' ''
Sep 8, 1997 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster wall under sink kitchen 6 sty south apt 6a , section '' ''
Sep 8, 1997 · Apt 6A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing 6 sty south apt 6a , section '' ''
Sep 8, 1997 · Apt 6A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches 2 sty west apt 2c , section '' ''
Aug 15, 1995 · Apt 2C
Open — Nov sent out - ANon-hazardous
Refit north room and closet door private hall 2 sty west apt 2c , section '' ''
Aug 15, 1995 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing 2 sty west apt 2c carroll , section '' ''
Aug 15, 1995 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thru out 2 sty west apt 2c , section '' ''
Aug 15, 1995 · Apt 2C
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed ceiling water leak kitchen and bathroom 2 sty west apt 2c , section '' ''
Aug 15, 1995 · Apt 2C
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches thru out 6 sty apt 6a , section '' ''
May 9, 1994 · Apt 6A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls thru out 6 sty apt 6a , section '' ''
May 9, 1994 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair the broken or defective kentile fooors thru out 6 sty apt 6a , section '' ''
May 9, 1994 · Apt 6A
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of mildew on walls around tub bathroom 6 sty apt 6a , section '' ''
May 9, 1994 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective 6 sty apt 6a , section '' ''
May 9, 1994 · Apt 6A
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice & roaches thru out 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at southeast room 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass upper sash window southeast room 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling bathroom & kitchen 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak ceiling bathroom 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls ceiling & woodwork thru out 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the broken or defective peephole at sink range door 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the broken or defective wood base at cabinet sink kitchen 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wall under sink kitchen 2 sty south apt 2a , section '' ''
Feb 8, 1994 · Apt 2A
Open — Nov sent out - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 1 sty apt 1d. , section '' ''
Jul 26, 1991 · Apt 1D
Open — Nov sent out
DOB building violations · 272
- Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Cycle 9 failure to correct swarmp conditions
May 7, 2025
Dob violation - active - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Feb 19, 2025
Dob violation - active - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Feb 13, 2025
Dob violation - active
Show 40 more ↓
- Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Oct 10, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Construction other optional
Work without a permit
Aug 17, 2021
Vpw-violation unserved ecb-work without permit-active - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Nov 24, 2020
Dob violation - active - Hazardous condition (facade) facade required
Nycha cycle 9b unsafe report filed
Nov 24, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha filed unsafe report cycle 9b
Nov 2, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha filed unsafe report cycle 8b
Nov 2, 2020
Dob violation - dismissed - Zoning none
Illegal off street parking maintained without dob or dot approval. apprx. seven privately owned vehicles illegally parked at the grass at exposure#3 in residential district. zr 25-62, bc 3202.2.2.4
Sep 30, 2020
Dob violation - active - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 19, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report was filed
Feb 19, 2020
Dob violation - active - Facade safety program facade required
Nycha unsafe cycle 8 report was filed
Feb 19, 2020
Dob violation - active - Facade safety program facade required
Nycha unsafe cycle 8 report was filed
Feb 19, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report was filed
Feb 19, 2020
Dob violation - active - Facade safety program facade required
Nycha unsafe cycle 8 report was filed
Feb 19, 2020
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report was filed
Feb 19, 2020
Dob violation - active
ECB violations · 246
- Class - 2
Responding to an incident where a worker sustained a laceration to the lip after falling from a ladder at the 2dn fl level while performing programming work. upon request, contractor failed to provide documenta
Aug 5, 2026 · Penalty $5,000
Active - Class - 1
Bc 3301.8.2. responding to an incident in which a worker sustained a laceration to the lip after falling from a ladder at the second-floor level while performing programming work. the ladder involved in the inc
Aug 5, 2026 · Penalty $5,000
Active - Class - 1
On august 5,2026 a worker suffered a laceration on the lip falling from ladder as per dob record the site failed to notify dob within 3 business day to date of 16 items expressly listed in 28-103.21 via e-file
Aug 5, 2026 · Penalty $10,000
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note: at time of inspection observed multiple broken windows throughout the building with shards present at exposure #1 observed 2 broken windows
Dec 10, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measures such as shed,netting,ect.where required to protect public and property.initial unsafe compliancefiling#tr6-909207-9b-i1 on 10-10-2024 by qewi(pe/ra).noted:at time of
Oct 24, 2024 · Penalty $10,000
Resolve - Class - 1
Failure to maintain exterior facade amd appurtenances. note:-at the time of inspection observed:-broken windows glass at multiple locations.remedy: maintain exterior facade provide safety measures. repair the d
May 17, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to maintain buildings exterior walls and/or appurtenances.-at time of inspection observed cracked/broken windows at multiple locations of exposure 1(west elevation) and exposure 2(north elevation). reme
May 9, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to maintain buildings exterior walls and/or appurtenances.-at time of inspection observed a broken window where the broken pieces have been displaced, having jagged glass on the broken window, at the 4t
May 6, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to miantain exterior building facade and appurtenances. note: observed at exposure #3(north elev.) broken window glass at 7th floor.remedy: maintain exterior building facade and appurtenances. provide s
Apr 26, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior facade and appurtenances. note: observed at expoure #1(north elev.) broken glass at 1st floor. remedy: maintainexterior facade and appurtenances. provide safety measures, repair the
Apr 26, 2024 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain exterior wall and appurtenances. at the time of inspection i observed at exp. #2 west elevation broken windows glass at multiple locations. remedy: maintain exterior building walls, provide
Apr 17, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed at(1) exp. #1(south elev.) broken window glass at 6th floor.(2)at exp. #3(north elev.) broken window glass at 1st floor. also unsec
Mar 26, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed at (1) exp. #1 (east elev.) broken window glass at 2nd floor.(2)exp. #2(south elev.) unsecured flower pots between 5th and 7th floo
Mar 26, 2024 · Penalty $2,500
Resolve - Class - 1
Responding a complaint observed: at 465 columbia street on january 24 main pressure gas line was struck during excavation activities to expose gas line during storm recovery restauration activities. no notifica
Jan 25, 2024
Resolve - Class - 2
Failure to maintain building exterior facade and/or appurtenances.-at time of inspection i observed cracked concrete canopies directly aboveall main entrances. building has 3 main entrances, 93, 95 and 101 cent
Jan 19, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. observed at all exposures improperly supported a.c. units. also at exposure 2(south observed) broken window at top floor and 2 other broken window
Jan 8, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. at time of inspection it was observed: at exposure 1 92 centre mall entrancecanopy had spalling concrete, broken window at exposure 2 and several
Jan 8, 2024 · Penalty $2,500
Resolve - Class - 2
Condensating tank leak in basement of 447-columbia street in brooklyn., maintain boiler; repair condensating tank.
Apr 3, 2023 · Penalty $625
Resolve - Class - 1
Documents to be kept on site-manufacturer's specifications supported scffold.at time of inspection of alt 2 jobsite under permit #321726316 observed supported scaffold at exp #1 #2 #4 cut frames at base at exp
Apr 5, 2022 · Penalty $1,250
Active - Class - 2
Unapproved/unsafe/unsuitable electrical equipment apparatus,materials,devices,appliances or wiring in use.the entire b line electricity is interrupted due to contractor drilling and damaging pipe and wires cau
Jan 15, 2022 · Penalty $800
Resolve - Class - 2
Pedestrian protection doesnt meet code specs note:ato my insp of proposed 3stynb i observed pedestrian crosswalk sign covered by sws&const fence@corner of clintonst&hamiltonave.b/w const fence&sws made seeing c
Jan 10, 2022 · Penalty $2,400
Resolve - Class - 2
Temp const equipment onsite w/expired permit sws permit expired8/8/21.note:ato my insp of proposed 3stynb under const active jobsite i observed erected sws@bldg exp1 when requested to view valid permit for temp
Jan 10, 2022
Resolve - Class - 2
Bc3307.6.58 periodic insps 6mnths after initial installation insp&every 6mnths thereafter.note:ato my insp of 3stynb under const active jobsite.i observed erected sws@bldg's exp1,when requested to view 6mnth in
Jan 10, 2022
Resolve - Class - 2
Work doesnt conform to approved const docs.ssp doesnt reflect jersey barrier&sws on clintonst.ssp must reflect work&safety for pedestrians&personnel conform/amend sspto reflect work done&plan to being done conf
Jan 10, 2022
Resolve - Class - 2
Failure to maintain adequate housekeeping per sectoin requirements.at time of inspection on active job site observed permit holder failed to maintain adequate housekeeping consisting of dried tree leaves during
Nov 30, 2021
Resolve - Class - 3
Bc3304.4.4 guardrail system(excavated area)at time of inspection of active job site observed excavation aread slop 6 ft in depth at exp #1 within 4 ft of supported scaffolding of building.permit holder failed t
Nov 30, 2021
Resolve - Class - 2
Failure to institute safety measures for public and property affected by construction operations.note:at time of inspection for excavation in conjuction with the building and to answer an incident complaint for
Nov 18, 2021 · Penalty $5,000
Active - Class - 1
I observed in basement boiler room gas piping cut and plugged for main line after meter and no permits on file for work performed, obtain permit
May 10, 2021 · Penalty $2,500
Resolve - Class - 2
Bc3304.10=dewatering excavation at tiemof inspection of a 3 story building i observed at exposure #1,2 and 3 an approxmately 9 foot deep trenched excavation where 2-5 inches of settled water was undrained creat
Jul 13, 2020
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note:observed on all exposures 10 or more a/c units improperly installed w/ wood pieces,bricks,tin cans,etc used as support. remedy:maintain exter
Dec 20, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide safety measures to protect and secure public safety from documented "unsafe" facade as per 1rcny 103-04. facade technical report filed "unsafe" by pe/ra on 11/7/19. note:no sidewalk
Dec 20, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior facade and appurtenances. observed approx10 a/c units installed on all exposures w/ improper support:tin cans,pieces of wood,bricks,etc. remedy:maintain exterior facade. provide&tak
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. observed approx 10 a/c installed on all exposures w/ improper support:bricks,wood pieces,tin cans etc. remedy:maintain exterior facade. take&provi
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. observed approx 10 a/c units installed on all exposures w/ improper support:wood pieces,tin cans,bricks,etc. remedy:maintain exterior facade. take
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide safety measures:sidewalk shed,netting etc.where required to protect and secure public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed unsafe b
Dec 12, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior building facade&appurtenances. observed approx 10 a/c units on all exposures installed w/ improper support of tin cans,wood pieces,etc. remedy:maintain exterior facade. take&provide
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide safety measures/sidewalk shed,netting etc.where required to protect and secure public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed "unsafe"
Dec 12, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to take and provide safety measures/sidewalk shed,netting etc.where required to protect and secure public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed "unsafe"
Dec 12, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. observed approx 10 a/c units on all exposures installed w/ improper support:pieces of wood,tin cans,bricks. remedy:maintain exterior facade. take&
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building exterior walls/facades and appurtenances.at various exposures,elevations and stories-a/cs supported by cans andwood. remedy:maintain building exterior walls/facades. repair/make saf
Dec 6, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg ext walls/facades & appurtenances.exp 4,east elevation:hanging air conditioner,air conditioners supported by brick & wood.exp 1,south elevation:air conditioner supported by cinder block
Dec 6, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measures,such as shed,netting,etc-where required to protect and secure public safety from a documented unsafe facade-filed by qewi on 11/7/19-as per 1rcny 103-04. note:at time
Dec 6, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to maintain building exterior walls/facades and appurtenances.exposure 1,south elevation:unsecured a/c and a/c supported by cans. exposure 2,west elevation:unsecured a/c. various exposures and elevation
Dec 6, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate safety measures,such as-shed,netting,etc-where required to protect and secure public safety from a documented unsafe facade-filed by qewi on 11/7/19 as per 1rcny 103-04. at time of i
Dec 6, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to provide adequate measures such as shed,netting,etc where required to protect & secure public safety from a documented unsafe facade-filed by qewi on 11/7/19 as per 1rcny103-104.@time of insp there we
Dec 6, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to maintain bldg ext walls/facades & or appurtenances.various exposures,elevations & stories:air conditioners supported by wood & cans.exp 1,north elevation:unsupported air conditioner-hanging @window.r
Dec 6, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide adequate measures such as shed,netting,etc where required to protect & secure public safety from a documented unsafe facade-filed by qewi on 11/7/19 as per 1rcny103-104.@time of insp there we
Dec 6, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to take and provide safety measures sidewalk shed,netting etc.where required to secure and provide public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed unsafe b
Nov 15, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note:on all exposures and levels observed approx 18 ac window units w/ improper support between the units and sill w/ wood,tin cans and other loos
Nov 15, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide safety measures-sidewalk shed,netting,etc.where required to protect and provide public safety from documented unsafe facade as per 1rcny-103-04. facade technical report filed"unsafe"
Nov 15, 2019 · Penalty $10,000
Resolve
Complaints
- Heating
Heat related
Jan 21, 2014 · Apt 1FL
Close - Heating
Heat related
Dec 17, 2003 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1940
- Floors
- 6
- Residential units
- 1,836
- Building area
- 1,466,751 ft²
- Lot area
- 1,079,791 ft²
- Zoning
- R5
- Community board
- 306
- Council district
- 38
- Block / lot
- 538 / 1
- Assessed value
- $44,520,750
- Landmark / historic district
- No
Questions about 110 Columbia Street
Who owns 110 Columbia Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 110 Columbia Street have violations?
Yes. NYC HPD has recorded 77 housing violations at this property.
Is 110 Columbia Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 110 Columbia Street built?
City records list 1940 as the year it was built.
How many apartments are in 110 Columbia Street?
It has 1,836 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.