106 1 Place

Brooklyn, NY 11231BBL 3-00459-0007Map

Owner of record: 104-106 1st Place Corp

106 1 Place is a mixed residential and retail building built in 1931 in Brooklyn, 11231. It has 1 residential unit across 4 floors. The owner of record is 104-106 1st Place Corp. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
13
ECB violations
12
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 13

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 28, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 28, 2021

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 4, 2021

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 4, 2021

    Dob violation - dismissed
  • Construction other optional

    Snow load caused roof to collapse on to 2nd floor rear and side walll damaged at roof level

    Feb 2, 2021

    Dob violation - dismissed
Show 3 more ↓
  • Construction other optional

    Snow load caused roof to collapse onto 2nd floor rear wall and side wall damged at roof level

    Feb 2, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed

ECB violations · 12

  • Class - 2

    Altered/changed building occupied without a valid certificate of occupancy as per &28-118.3.1- &28-118- 118.3.2. at time of inspection, observed at basement level, gym, "district," in operation with gym-goers w

    Sep 16, 2024 · Penalty $620

    Resolve
  • Class - 1

    Bc330651-deficient drawings-the respondent registered design proffesionalfailed to meet the minimum requirements(ac28-101.2)set forth in bc330651.bc330651 mandates demolition drawings have plans.sections and de

    Mar 8, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide sidewalk shed were required.note:at the time of my inspection of a 4 story alteration operation in progress for a new bulkhead & roof terrace,i observed that there no sidewalk shed overhead

    Feb 3, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    3301.13.1 site safety plan.for jobs that require a designation of a primary construction superintendent,a site safety plan must be kept on site.a site safety plan is required to verify all safety measures perta

    Jan 27, 2021

    Resolve
  • Class - 1

    Work does not conform to approved construction documents or approved amendments.at time of inspection,observed cold form steel joist connecting to structural steel,when asked to verify details of connections an

    Jan 27, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    3303.9 elements to be maintained in existing buildings.at time of inspection,observed an existing staircase going from the first to the 2nd floor.there was a structural steel beam that was in place from the con

    Jan 27, 2021

    Resolve
  • Class - 2

    Construction superintendent failed to perform duties per code.at time of inspection,observed the daily logs the construction superintendent provided no signature or designation of competent person in the logs d

    Jan 27, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Requirement of license.it is unalwfull for any person to engage in anybusiness or occupation without a required license or other authorization.at the time of inspection and upon review of dob bis system databas

    Jan 27, 2021

    Resolve
  • Class - 1

    1704.1 failure to file tr1 for special inspections.at the time of inspection and upon review of dob now and dob/bis system records,no evidence of tr1's were filed for cold form streel or structural steel that w

    Jan 27, 2021

    Resolve
  • Class - 1

    Permit holder failed to ensure that each construction worker or demolition worker working/engaged at the site successfully completed the required training under bc 3221.2(i) and has a sst card,temporary sst car

    Oct 5, 2020 · Penalty $1,250

    Resolve
Show 2 more ↓
  • Class - 1

    Owner failed to ensure that each construction or demolition worker/working/engaged at the site successfully completed the required training under bc 3321.1 and has a sst card,temporary sst card or sst superviso

    Oct 5, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain/display onsite documents required by bc chapter 33.at time of inspection,observed temporary platform scaffold and temporary shore bracing.the temporary platform was in place of a shaft openi

    Jan 27, 2020 · Penalty $1,250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S1)
Year built
1931
Floors
4
Residential units
1
Building area
6,344 ft²
Lot area
1,831 ft²
Zoning
R6A
Community board
306
Council district
39
Block / lot
459 / 7
Assessed value
$192,900
Landmark / historic district
No

Questions about 106 1 Place

Who owns 106 1 Place?

The owner of record in NYC Department of City Planning PLUTO data is 104-106 1st Place Corp.

Does 106 1 Place have violations?

NYC HPD has no housing violations on record for this property.

Is 106 1 Place rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 106 1 Place built?

City records list 1931 as the year it was built.

How many apartments are in 106 1 Place?

It has 1 residential units and 2 units in total.