284 4 Avenue
Brooklyn, NY 11215BBL 3-00456-0032Map
Owner of record: 282 4th Ave Owner LLC
284 4 Avenue is a vacant lot in Brooklyn, 11215. The owner of record is 282 4th Ave Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 9
- ECB violations
- 18
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 18
- Class - 2
At time of inspection, demolition work was observed in progress on a wall at exp# 3 of the job site without adequate protection provided for the adjacent property located at 15 denton place, which corresponds t
Jun 11, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of inspection, demolition work was observed in progress on a wall at exposure 3 of the job site. a review of department records revealed that no active demolition permit was on file for the ongoing
Jun 11, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of inspection of the 15-story building, workers were observed performing electrical work from an a-frame ladder without maintaining three points of contact. this condition created a hazard to worker
Jun 7, 2026 · Penalty $2,500
Resolve - Class - 2
Bc 3301.1.3 at time of inspection, a yodock barrier system was observed with missing interlocking couplers throughout and barriers not filled with water or sand as required. this condition creates a safety haz
Jun 7, 2026 · Penalty $1,250
Resolve - Class - 2
At the time of inspection of the 15-story new building, excessive debris, including sheetrock, wood, and construction materials, was observed throughout the site. these conditions created tripping and falling h
Jun 7, 2026
Resolve - Class - 2
At the time of inspection of the 15-story building, a section of the construction fence was missing at the rear of the site at exposure 3. this condition created a hazard to public safety and property by allowi
Jun 7, 2026 · Penalty $1,000
Resolve - Class - 1
At the time of inspection of a 14-story new building active jobsite, i observed a large amount of construction debris approximately 5 feet in height , metal pieces, garbage and combustible materials at various
Mar 3, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection on an active jobsite of a 14-story new building at roof level, i observed road way closure by heavy duty crane operation approximately 140 feet high, hoisting material (rebar's) from roadw
Mar 3, 2026 · Penalty $2,500
Resolve - Class - 1
G.c bruklyn builders inc permitted a fassi f2150 knuckle boom plate#12990sr operated by angel r. lema lic#10648 to hoist a blue box from the ground, not a truck/trailer which requires a work permit for this sco
Dec 4, 2025 · Penalty $2,500
Resolve - Class - 1
Respondent permitted uncertified riggers to attach a load to the hook of a knuckle boom plate#12990sr. when asked for riggers certifications different people were presented not the rigger observed.timothy mauri
Dec 4, 2025 · Penalty $2,500
Resolve
Show 8 more ↓
- Class - 1
Crane user kmi inc permitted a fassi f2150 knuckle boom plate#12990sr operated by angel r. lema lic#10648 to hoist a blue box from the ground, not a truck/trailer which requires a work permit for this scope of
Dec 4, 2025 · Penalty $1,250
Resolve - Class - 1
Respondent permitted uncertified riggers to attach a load to the hook of a knuckle boom plate#12990sr. when asked for riggers certificationsdifferent people were presented not the rigger observed.timothy mauric
Dec 4, 2025
Resolve - Class - 2
Observed jersey barriers on the street at exp#1 with active dot permit. note: jersey barriers not maintained cracked, no reflective light , not interlocked and water filled as per specification of the manufact
May 9, 2025 · Penalty $1,250
Resolve - Class - 1
At time of inspection of a demolition jobsite of a 2 stories building, i observed active demolition in progress not conform to approved documents, debris was being throw from 2nd to 1st floor, upon review both
Jan 9, 2025 · Penalty $2,530
Resolve - Class - 2
Bc 3303.4.2 at time of inspection of a demolition jobsite of a 2 stories building, i observed active demolition in progress with debri container on the street at exposure # 1 full to the brim with debri of demo
Jan 9, 2025 · Penalty $2,530
Resolve - Class - 2
Bc 3307.2.1 at time of inspection of a demolition jobsite of a 2 stories building, i observed active demolition in progress with debri container on the street full of demo material at exposure # 1, upon request
Jan 9, 2025 · Penalty $2,530
Resolve - Class - 1
At time of inspection of a demolition jobsite of a 2 stories building, i observed active demolition in progress without protection to adjacent buildings at exposure #2 and 3 , no control access and safety zone
Jan 9, 2025 · Penalty $2,530
Resolve - Class - 2
A demolition of a 2 stories building, i observed demolition in progress without protection to adjacent buildings at exposure #2 and 3 , no control access and safety zone was created to prevent pubic from haza
Jan 9, 2025 · Penalty $5,030
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Vacant lot (V1)
- Year built
- —
- Floors
- —
- Residential units
- —
- Building area
- —
- Lot area
- 3,913 ft²
- Zoning
- C4-4D
- Community board
- 306
- Council district
- 39
- Block / lot
- 456 / 32
- Assessed value
- $255,150
- Landmark / historic district
- No
Questions about 284 4 Avenue
Who owns 284 4 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 282 4th Ave Owner LLC.
Does 284 4 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 284 4 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.