Violations at 360 Union Street
Brooklyn, NY 11231 · BBL 3-00436-0022 · Back to the property
HPD housing violations
The newest 50 of 61 HPD violations. The city keeps the complete history.
- BHazardous
Properly repair or replace the broken or defective locking assembly at entrance door at public hall, 1st story
Oct 4, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 4, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 4, 2021
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Aug 4, 2021 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 13, 2021 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at heat riser in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 13, 2021 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 13, 2021 · Apt 1A
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 13, 2021 · Apt 1A
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 15, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 15, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 15, 2021
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective rubber gasket on door at refrigerator in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Apr 15, 2021 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 15, 2021 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection at wasteline under washbasin in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 15, 2021 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain surface at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 15, 2021 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 15, 2021 · Apt 1A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors in the entrance located at apt a1, 1st story, 1st apartment from north at east
Jan 28, 2020 · Apt A1
Closed — Violation closed - ANon-hazardous
Refit the door in the entrance located at apt a1, 1st story, 1st apartment from north at east
Dec 27, 2019 · Apt A1
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors in the entrance located at apt a1, 1st story, 1st apartment from north at east
Dec 27, 2019 · Apt A1
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130f at all hot water fixtures in the entire apartment located at apt a1, 1st story, 1st apartment from north at east
Dec 27, 2019 · Apt A1
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical stopper at bathtub in the bathroom located at apt 1a, 1st story, apartment at south
Jan 20, 2015 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete tread first from top at building entrance door at stoop
May 16, 2014
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1a, 1st story, 1st apartment from north at east
May 16, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1a, 1st story, 1st apartment from north at east
May 16, 2014 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
May 16, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from north located at apt 1a, 1st story, 1st apartment from north at east
May 16, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
May 16, 2014 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete floor at landing at stoop, 1st story
May 13, 2014
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1a, 1st story, 1st apartment from south at west
Apr 18, 2014 · Apt 1A
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1a, 1st story, 1st apartment from south at west
Apr 18, 2014 · Apt 1A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Apr 18, 2014 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing rung at drop ladder at fire escape at front of building
Jan 21, 2014
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance of lower window sash at north wall in the 1st room from north at east located at apt 1c, 3rd story, 1st apartment from north at east
Oct 2, 2008 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt 1c, 3rd story, 1st apartment from north at east
Oct 2, 2008 · Apt 1C
Closed — Violation dismissed - BHazardous
Replace with new the missing electric light switch cover plate, at west wall, in the 1st room from north located at apt 1a, 1st story, 1st apartment from north at east
Sep 20, 2007 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , the ceiling, in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 20, 2007 · Apt 1A
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of a concealed water leak, at ceiling, in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 20, 2007 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Apr 18, 2006 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Apr 18, 2006 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Apr 18, 2006 · Apt 1A
Open — Nov certified late - BHazardous
Replace with new the broken or defective wood base at sink cabinet in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Apr 18, 2006 · Apt 1A
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
May 10, 2002
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of chain link fence erected impeding egress to gooseneck ladder with gate capable of being padlocked at south , roof
May 10, 2002
Closed — Violation dismissed - BHazardous
Properly secure the loose wood tred 15 up 4 story to roof at public hall stairs
May 10, 2002
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of sloping floor surface at public hall, 2nd story
May 10, 2002
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires at the west wall at public hall, 1st story
May 10, 2002
Closed — Violation dismissed - BHazardous
Properly secure the loose balustrade at the 1st story at public hall stairs, 2nd story
May 10, 2002
Closed — Violation dismissed
DOB building violations
6 DOB violations, newest first.
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
Work without a permit. violation#080101c06mc01 issued 8/1/01 pending failure to maintain building, hazardous defect is is broken, loose steps in hallway from first to second floor. third floor landing has heavy pitch. from north to south various cracks and holes in walls & ceilings of public hallway. remedy:maintain bldg provide engineers
Aug 31, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
Wwork without a permit work nooted: total ggut rehad partitioms removed throut apartments a2 and c2 remedy: stop all work obtain all necessary permits and approvals from this department. call the dob prior to returning to work 718-802-3685
Aug 1, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
Work without a permit. work noted: having demo entire bath & kitchen, removal of doors & frame throughout entire apt. new electrical work throughout apt #d4 remedy: stop all work, make site safe, file plans
May 8, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
Work without a permit. work noted: having demolished enyire bath & kitchen, remodel all doors & fraaame throughout entire apt. new electrical work throughout apt
May 8, 2001
Vw-violation work without permit - active - Construction other optional
Work without a permit. work noted: having demolish entire bathroom and kitchen. removal of doors and frame throughout entire apartment. new electrical work throughout apartment #d4 remedy: stop all work, make site safe, file plans, opbtain permit
Aug 6, 1998
Vw*-violation - work w/o permit dismissed
ECB violations
6 ECB violations, newest first.
- Non-hazardous
Failure to provide approved plans at premises at time of inspection note construction work being done with permit #301297415 expires 1/29/03, from 2 to 4 story north such as gut rehal, removed replace wood jois
Jul 31, 2002 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit.violation #080101c06mc01 issued 8/1/01 pending. failure to maintain building.hazardous.defect is:broken,loose steps in hallway from first to second floor.third floor landing has heavy pitc
Aug 31, 2001 · Penalty $5,000
Resolve - Non-hazardous
Work without a permit work noted 8 total gut rehab partitions removed throughout apts a 2 and c 2 remedy stop all work obtain all necessary permits and approvals from this dept call the dob prior to returning
Aug 1, 2001 · Penalty $250
Resolve - Non-hazardous
Work without permit.noted:having demolished entire bath & kitchen removal of doors & frame throughout entire apt. new electrical work throughout apt.d4 rem:stop all work, make site safe, fire plans
May 8, 2001 · Penalty $2,500
Resolve - Hazardous
Work without a permit. work noted: 1) having demo bathroom entire in apartment (3b) and removed and demo bathroom plumbing fixtures, new bathtub installed with new plumbing. removed base boards and installed
Mar 12, 1999 · Penalty $2,500
Resolve - Non-hazardous
Work w/o a permit. work noted: having demolished entire bath & kitchenremoval of doors & frame throughout entire apt. new electrical work throughout apt #d4. remedy: stop all work, make site safe, file plans
Aug 6, 1998 · Penalty $800
Resolve