615 Sackett Street
Brooklyn, NY 11217BBL 3-00427-0061Map
Owner of record: 601 Sackett Property Owner LLC
615 Sackett Street is a care facility built in 1931 in Brooklyn, 11217. It has 14 residential units across 3 floors. The owner of record is 601 Sackett Property Owner LLC. HPD has recorded 10 housing violations here, most recently on May 5, 2026. 2 of the 10 most recent violations are still open.
- HPD violations
- 10
- DOB violations
- 0
- ECB violations
- 17
- HPD complaints
- 15
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom at north , 2nd story
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 2, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 2, 2021
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the room located at b-room 203, 2nd story, 2nd b-room from east at south
Mar 18, 2021 · Apt 203
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the community bathroom located at public parts 203, 2nd story, 2nd public parts from east at south
Mar 18, 2021 · Apt 203
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system notice missing at public hall, 1st story
Mar 18, 2021
Closed — Violation closed - BHazardous
Seal in open position the o.s.y. valve of the sprinkler system in accordance with the rules and regulations of this department total of 8 at boiler room, 1st story
Mar 18, 2021
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 17
- Class - 1
Class 1 items: door zone restrictor inoperative. in-car communication and alarm bell inoperative. class 2 item: resolve car from re-leveling. class 1 items must be reinspected prior for use with a d.o.b. inspec
Jun 20, 2024 · Penalty $1,250
Resolve - Class - 2
I observed on the first floor the failure to provide a remote shutdown at the point of egress for the gas-fired hot water heaters, as required in mc 1006.8.1. photos taken.; mc 1006.8.1, comply with ec code; pr
Nov 14, 2023
Resolve - Class - 1
I observed in the rooftop elevator motor room cab light switch the improper installation of the fuse, the fuse was installed with copper strands wrapped around the shell. this bypasses the fuse from acting as o
Nov 14, 2023 · Penalty $1,600
Resolve - Class - 1
I observed in the main electrical room the failure to bond the neutral of 2 service switches as required the switch shall be bonded up to the load side of all service switches. photos taken., provide proper bon
Nov 14, 2023 · Penalty $3,000
Resolve - Class - 2
I observed on the rooftops(upper and lower) no equipment disconnect to terminate power to the hvac systems prior to entering directly into the units. please note the factory supplied disconnect does not termina
Nov 14, 2023
Resolve - Class - 2
Incorrect information on construction documents as per mc106.7 a fill pipe shall terminate outside of a building as per mc1305.6.2 roof vent termination not visible from fill terminal location at first floor do
Mar 15, 2021
Resolve - Class - 2
Bc 3314.1 unsafe supported scaffold. at the time of inspection i observed supported scaffold installed on lower roof level. (1)no guardrailsin place (2)not fully planked (3)no debris netting (4)material storage
Nov 13, 2020
Resolve - Class - 2
Failure to institute and maintain safety equipment measures and temporary construction. note-at the time of my inspection of a 3 story building at roof level. i observed foam particles all over the block,inside
Nov 13, 2020 · Penalty $5,000
Resolve - Class - 1
Bc 3301.6 design. note-at the time of my inspection of a 3 story alteration construction site. i observed temporary work platform in staircases made of 2x4 and plywood. upon request for design drawings for plat
Nov 13, 2020 · Penalty $625
Resolve - Class - 1
Records. note-at the time of my inspection of a 3 story alteration construction site. upon request for site safety orientations for each worker for site. none was provided. project manager and competent person
Nov 13, 2020 · Penalty $12,500
Resolve
Show 7 more ↓
- Class - 2
Failure to maintain/display on site documents required by bc chapter 33. noted: at time of inspection of an active jobsite. upon request to see the site safety plans it was presented could not maintain. it was
Mar 25, 2020 · Penalty $625
Resolve - Class - 1
Sec. 3303.7.2 fire extinguisher. noted: at time of inspection of an active jobsite. oberved fire extinguisher on the floor & not hang as percode. remedy: comply w/nyc fire code.
Mar 25, 2020
Resolve - Class - 2
Sec. 3301.7 design drawings. at time of inspection of an active jobsite. observed work using pulley to take material to the 2 fl. upon request to see the design drawing none was provided. remedy: provided dd or
Mar 25, 2020
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33. noted: at time of inspection of an active jobsite-upon request to see the sidewalk shed installation report none was provided.
Mar 25, 2020
Resolve - Class - 1
At time of inspection, foundation and footing work at west end of first floor at premises does not conform to approved plans for alt 1 job #321912178 or alt 2 structural job #340674130, conform work to approved
Feb 12, 2020 · Penalty $625
Resolve - Class - 1
At time of inspection, failed to provide adequate guardrails at plumbing excavation at east section of first floor, structural footing excavation at west end of first floor and opening at roof, provide guard ra
Feb 12, 2020 · Penalty $2,500
Resolve - Class - 2
At time of inspection, at facade at exposure 1, multiple cracks in facade; at right side of roll down gate, between roll down gate and first door from right, between first door from right and large boarded up o
Oct 3, 2019 · Penalty $327
Resolve
Complaints
- Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 304
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt ROOM30
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt 417
Close - Heat/hot water
Entire building
Jun 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2023 · Apt 203 BE
Close - Heat/hot water
Entire building
Dec 24, 2021 · Apt ROOM 2
Close
Show 5 more ↓
- Heat/hot water
Entire building
Oct 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
May 30, 2021 · Apt 202
Close - Heat/hot water
Entire building
May 19, 2021 · Apt 1001
Close - Heat/hot water
Entire building
Mar 17, 2021 · Apt 203
Close - Heat/hot water
Entire building
Mar 17, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Care facility (N9)
- Year built
- 1931
- Floors
- 3
- Residential units
- 14
- Building area
- 32,171 ft²
- Lot area
- 16,000 ft²
- Zoning
- M1-4
- Community board
- 306
- Council district
- 39
- Block / lot
- 427 / 61
- Assessed value
- $2,952,450
- Landmark / historic district
- No
HPD registration #389994, last renewed Jul 7, 2026.
Questions about 615 Sackett Street
Who owns 615 Sackett Street?
The owner of record in NYC Department of City Planning PLUTO data is 601 Sackett Property Owner LLC.
Does 615 Sackett Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 615 Sackett Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 615 Sackett Street built?
City records list 1931 as the year it was built.
How many apartments are in 615 Sackett Street?
It has 14 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.