81 Warren Street
Brooklyn, NY 11201BBL 3-00299-7504Map
Owner of record: 81 Warren Street Condominium
81 Warren Street is a condominium built in 1911 in Brooklyn, 11201. It has 4 residential units across 3 floors. The owner of record is 81 Warren Street Condominium. HPD has recorded 28 housing violations here, most recently on June 12, 2025.
- HPD violations
- 28
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 42
Available now in this building
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 13, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 13, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 13, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 13, 2022
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 13, 2022
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked from 1st story to boiler room
Jun 13, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed
Show 18 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective cracked storm window at lower sash in the kitchen located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Replace with new the broken or defective window pane at upper sash in the 1st room from north located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective metal ceiling in the kitchen located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Properly repair the broken or defective metal ceiling in the 1st room from north at west located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Mar 24, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire rated materials at ceiling at public hall, 3rd story
Mar 24, 2015
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Mar 24, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles in the kitchen located at apt 4, 3rd story
Mar 24, 2015 · Apt 4
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Oct 12, 2022 · Apt 3
Close - Plumbing
Water supply
Jul 4, 2022 · Apt UNIT1
Close - Heat/hot water
Apartment only
Jun 12, 2022 · Apt 3
Close - Door/window
Window pane
Oct 22, 2015 · Apt 4
Close - Electric
Lighting
Oct 22, 2015 · Apt 4
Close - Appliance
Electric/gas range
Oct 22, 2015 · Apt 4
Close - Plumbing
Radiator
Oct 22, 2015 · Apt 4
Close - Door/window
Window pane
Oct 19, 2015 · Apt 4
Close - Electric
No lighting
Oct 19, 2015 · Apt 4
Close - Appliance
Electric/gas range
Oct 19, 2015 · Apt 4
Close
Show 32 more ↓
- Electric
No lighting
Oct 19, 2015 · Apt 4
Close - Heat/hot water
Entire building
Oct 19, 2015 · Apt 4
Close - Heat/hot water
Entire building
Apr 22, 2015 · Apt 1
Close - Paint/plaster
Wall
Mar 19, 2015 · Apt 4
Close - Flooring/stairs
Floor
Mar 19, 2015 · Apt 4
Close - Door/window
Window frame
Mar 19, 2015 · Apt 4
Close - Appliance
Electric/gas range
Mar 19, 2015 · Apt 4
Close - Flooring/stairs
Floor
Mar 19, 2015 · Apt 4
Close - Water leak
Heavy flow
Mar 19, 2015 · Apt 4
Close - Water leak
Slow leak
Mar 14, 2015 · Apt 4
Close - Water leak
Slow leak
Mar 14, 2015 · Apt 4
Close - Paint/plaster
Ceiling
Mar 14, 2015 · Apt 4
Close - Paint/plaster
Ceiling
Mar 14, 2015 · Apt 4
Close - Paint/plaster
Ceiling
Mar 14, 2015 · Apt 4
Close - Paint/plaster
Ceiling
Mar 14, 2015 · Apt 4
Close - Water leak
Slow leak
Mar 14, 2015 · Apt 4
Close - Outside building
Roofing
Mar 14, 2015 · Apt 4
Close - Heat/hot water
Entire building
Jan 5, 2015 · Apt 1
Close - Heat/hot water
Entire building
Nov 10, 2014 · Apt 1
Close - Water leak
Slow leak
May 23, 2014 · Apt 4
Close - Water leak
Slow leak
May 23, 2014 · Apt 4
Close - Flooring/stairs
Floor
May 23, 2014 · Apt 4
Close - Door/window
Window frame
May 23, 2014 · Apt 4
Close - Door/window
Window pane
May 23, 2014 · Apt 4
Close - General
Mailbox
May 23, 2014 · Apt 4
Close - Door/window
Door
May 23, 2014 · Apt 4
Close - Heat/hot water
Entire building
Apr 22, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2014 · Apt WHOLE
Close - Heat/hot water
Entire building
Apr 22, 2014 · Apt 3
Close - Heat/hot water
Entire building
Apr 18, 2014 · Apt 3
Close - Heat/hot water
Entire building
Apr 17, 2014 · Apt 1
Close - Heat/hot water
Entire building
Apr 17, 2014 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R1)
- Year built
- 1911
- Floors
- 3
- Residential units
- 4
- Building area
- 5,747 ft²
- Lot area
- 2,496 ft²
- Zoning
- R6B
- Community board
- 306
- Council district
- 39
- Block / lot
- 299 / 7504
- Assessed value
- $1,239,751
- Landmark / historic district
- No
HPD registration #305584, last renewed Jun 30, 2026.
Questions about 81 Warren Street
Who owns 81 Warren Street?
The owner of record in NYC Department of City Planning PLUTO data is 81 Warren Street Condominium.
Does 81 Warren Street have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 81 Warren Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 81 Warren Street built?
City records list 1911 as the year it was built.
How many apartments are in 81 Warren Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
