214 Clinton Street

Brooklyn, NY 11201BBL 3-00285-0030Map

Owner of record: Unavailable Owner

214 Clinton Street is a walk-up apartment building built in 1892 in Brooklyn, 11201. It has 35 residential units across 5 floors. The owner of record is Unavailable Owner. HPD has recorded 62 housing violations here, most recently on May 2, 2026. 30 of the 50 most recent violations are still open.

HPD violations
62
DOB violations
35
ECB violations
2
HPD complaints
15

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 62

  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd stack from west at north at fire escape, 3rd story

    May 2, 2026

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st stack from west at north at fire escape, 2nd story

    May 2, 2026

    Open — Nov sent out
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder 2nd stack from north at east building west exterior at fire escape

    May 2, 2026

    Open — Nov sent out
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Dec 30, 2025 · Apt 3B

    Open — Nov sent out
  • C

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Dec 30, 2025 · Apt 3B

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 10, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 2nd story, 1st apartment from north at east

    Dec 21, 2025 · Apt 3B

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Dec 21, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Dec 21, 2025

    Open — Not complied with
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 21, 2025

    Open — Not complied with
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Dec 21, 2025

    Open — Not complied with
Show 40 more ↓
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at 1st stack from north at west at fire escape

    Dec 21, 2025

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 23, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 23, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2016

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Sep 3, 2015

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing 8th & 11th treads from bottom at front fire escape 4th story

    Aug 29, 2014

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing 10 tread from bottom at front fire escape 4th story

    Aug 29, 2014

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at north, south, east and west walls in the bathroom located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from east at north located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the private hallway located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Open — Defect letter issued
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the kitchen located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 2nd room from east located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at north wall, east wall, west wall in the 2nd room from east located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 1st room from east at north located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, east wall, south wall in the 1st room from east at north located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall, 1st riser from east at south wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, east wall, south wall, north wall, west wall, 1st door from east at south wall, 1st door frame from east at south wall in the bathroom located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • B

    Properly secure the loose (hanging) electric light fixture at ceiling in the kitchen located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, ceiling, 1st window frame from west at north wall in the 2nd room from east located at apt 1b, 2nd story, 2nd apartment from west at north

    Aug 12, 2014 · Apt 1B

    Open — Defect letter issued
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 12; in the entire apartment located at apt 3e, 5th story, 1st apartment from north at east

    May 2, 2014 · Apt 3E

    Open — Not complied with
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 12; wg to replace = 0; wg to repair = 0; located at apt 3e, 5th story, 1st apartment from east at south

    Mar 13, 2014 · Apt 3E

    Open — Not complied with
  • B

    Repair or replace the smoke detector missing located at apt 3e, 5th story, 1st apartment from east at south

    Mar 13, 2014 · Apt 3E

    Open — Not complied with
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 3e, 5th story, 1st apartment from east at south

    Mar 13, 2014 · Apt 3E

    Open — Not complied with
  • C

    M/d law abate the nuisance consisting of scalding hot water (154 degrees) in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north

    Mar 11, 2014 · Apt 3C

    Open — First no access to re- inspect violation
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3c, 3rd story, 1st apartment from west at north

    Mar 11, 2014 · Apt 3C

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector , missing, located at apt 3c, 3rd story, 1st apartment from west at north

    Mar 11, 2014 · Apt 3C

    Open — First no access to re- inspect violation
  • C

    D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty public hall & on boiler room door.

    Jun 17, 1991

    Open — Nov sent out
  • A

    D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling 3 sty east apt 5 2 room from front at north. located at apt 5

    Jun 17, 1991 · Apt 5

    Open — Nov sent out
  • B

    Properly repair the broken or defective door 3 sty east apt 2c foyer to south center room. , section '' ''

    Jun 17, 1991 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair the broken or defective window frames thru out 3 sty southeast apt 2c. , section '' ''

    Jun 17, 1991 · Apt 2C

    Open — Nov sent out
  • A

    D26-10.01 adm code properly repair the broken or defective window frames & sashes all rooms 3 sty west apt 5. , section '' ''

    Jun 17, 1991 · Apt 5

    Open — Nov sent out
  • B

    Properly repair the broken or defective entrance door 3 sty east apt 3c northeast room. , section '' ''

    Jan 25, 1988 · Apt 3C

    Open — Nov sent out
  • B

    Properly repair the broken or defective window sashes 3 sty east apt 3c thru out. , section '' ''

    Jan 25, 1988 · Apt 3C

    Open — Nov sent out
  • B

    Replace with new the missing putty window sashes 3 sty east apt 3c thru out. , section '' ''

    Jan 25, 1988 · Apt 3C

    Open — Nov sent out

DOB building violations · 35

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 3, 2021

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 3, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2020

    Dob violation - active
  • Construction other optional

    The dob hereby orders you to stop all work under job #321969494 (doc 2 - structural application) due to the withdrawal of the applicant of record

    Feb 13, 2020

    Dob violation - active
  • Construction other optional

    The dob hereby orders you to stop all work under job #321969494 (doc 2 - structural application) due to the withdrawal of the applicant of record

    Feb 13, 2020

    Dob violation - active
  • Plumbing none

    The dob intends to revoke all approvals and permits under plumbing laa #340129239 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit

    Aug 11, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
Show 25 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Landmark none

    Landmrk-landmark none

    Jun 14, 1985

    Dob violation - dismissed

ECB violations · 2

  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob records.submit a current all violating conditions and submit the certificate of correction.

    Sep 19, 2016

    Resolve
  • Non-hazardous

    Failure to provide approved plans at the premises at the time of inspection.

    May 4, 1989

    Resolve

Complaints

  • Safety

    Window guard broken/missing

    Dec 18, 2025 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2015 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Aug 5, 2014 · Apt 1B

    Close
  • Plumbing

    Water supply

    Mar 11, 2014 · Apt 3E

    Close
  • Heating

    Heat related

    Mar 9, 2014 · Apt 3C

    Close
  • Plumbing

    Water supply

    Mar 9, 2014 · Apt 3C

    Close
  • Heating

    Heat related

    Oct 10, 2012 · Apt 3D

    Close
  • Heating

    Heat related

    Oct 11, 2009 · Apt 1B

    Close
  • Heating

    Heat related

    Mar 6, 2006 · Apt BLDG

    Close
  • Heating

    Heat related

    May 24, 2005 · Apt BLDG

    Close
Show 5 more ↓
  • Heating

    Heat related

    Apr 9, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 16, 2004 · Apt ENT

    Close
  • Heating

    Heat related

    Dec 15, 2004 · Apt 0

    Close
  • Heating

    Heat related

    Oct 3, 2003 · Apt BLDG

    Close
  • Heating

    Heat related

    May 6, 2003 · Apt 1

    Close

Sales history

DatePriceTypeUnits
Feb 26, 2026$690,000Coops - walkup apartments—

Building details

Building type
Walk-up apartment building (C6)
Year built
1892
Floors
5
Residential units
35
Building area
27,525 ft²
Lot area
6,750 ft²
Zoning
R6
Community board
306
Council district
39
Block / lot
285 / 30
Assessed value
$2,760,300
Landmark / historic district
Cobble Hill Historic District

HPD registration #368738, last renewed Sep 25, 2025.

Questions about 214 Clinton Street

Who owns 214 Clinton Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 214 Clinton Street have violations?

Yes. NYC HPD has recorded 62 housing violations at this property.

Is 214 Clinton Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 214 Clinton Street built?

City records list 1892 as the year it was built.

How many apartments are in 214 Clinton Street?

It has 35 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.