Violations at Atlantic Avenue
Brooklyn, NY 11201 · BBL 3-00245-0025 · Back to the property
HPD housing violations
26 HPD violations, newest first.
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 20, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Sep 20, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
May 1, 2026 · Apt 4E
Open — Nov certified late - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft. at ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
May 1, 2026 · Apt 4E
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 2, 2024
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 3j, 3rd story, 1st apartment from east at south
May 23, 2024 · Apt 3J
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3j, 3rd story, 1st apartment from east at south , section at south
Dec 17, 2023 · Apt 3J
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3j, 3rd story, 1st apartment from east at south , section at south
Dec 17, 2023 · Apt 3J
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3j, 2nd story, 1st apartment from south at west
Nov 29, 2023 · Apt 3J
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3j, 3rd story, 1st apartment from east at south , section ''south''
Sep 8, 2023 · Apt 3J
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3j, 3rd story, 1st apartment from east at south , section ''south''
Sep 8, 2023 · Apt 3J
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3j, 3rd story, 1st apartment from east at south , section ''south''
Sep 8, 2023 · Apt 3J
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles surface ,caulking and grouts joints of visible mold at north, east and south walls around bathtub in the bathroom located at apt 3j, 3rd story, 1st apartment from east at south , section ''south''
Sep 8, 2023 · Apt 3J
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling, approximately 4 sq ft. in the bathroom located at apt 4e, 4th story, 1st apartment from north at east original violation 15437174 issued 17-oct-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 17, 2022 · Apt 4E
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective ventilation system in the bathroom located at apt 4e, 4th story
Oct 17, 2022 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling, approximately 4 sq ft. in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 17, 2022 · Apt 4E
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 17, 2022
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 17, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 17, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story
Jul 17, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3j, 3rd story, 1st apartment from east at south
Nov 12, 2021 · Apt 3J
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed
DOB building violations
9 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2021
Dob violation - resolved
ECB violations
10 ECB violations, newest first.
- Class - 1
Sec. 3301.1.1 responsibility for safety. at time of inspection on a active jobsite of a 16 sty bldg,upon request for site safety orientationfor workers on a site safety program jobsite,workers juan diaz,carlos
Oct 11, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.1.3 manufactor specifications. at time of inspection on a active jobsite of at 16 sty bldg,observed workers working on top rails of suspended scaffold approx 20feet in height. upon reviewing the manuf
Oct 11, 2018 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved plans/design drawings. at time of inspection on a active jobsite of a 16 sty bldg,observed suspended scaffold installed at roof level at exp#4,upon reviewing suspended scaffold
Oct 11, 2018 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and or approved documents.note: at the time of my inspection of a 16 story buildingat bulkhead level construction work in progress. i observed upon revi
Feb 8, 2018 · Penalty $250
Resolve - Class - 1
Design of concrete formwork. note: @ time of insp of a 16 story bldg @ 5th flr level, construction work in progress. upon request for site specific formwork design drawings for formwork (column, shear wall) non
Dec 6, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to institute & maintain safety equipment measures & temporary construction. note: @ time of insp of a 16 story bldg @ 5th flr level, construction work in progress. observed crane in use for concrete ope
Dec 6, 2017 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction document &/or approved amendments. note: @ time of insp of a 16 story bldg @ 5th flr level approx 40ft in height construction work in progress. observed on adjacen
Dec 6, 2017 · Penalty $250
Resolve - Class - 1
Sec: bc 3303.3. watchperson. note: @ time of insp of a 16 story bldg @ 5th flr level. site closed & upon request for watch person as require for construction operation which was approx 9880 sq.ft as per constru
Dec 6, 2017 · Penalty $400
Resolve - Class - 1
Sec: bc 3307.7.5. design of fence. note: @ time of insp of a 16 story bldg @ 5th flr level, construction work in progress. observed construction fence erected @ exp#1 concrete jersey barrier w/ plywood, exp#2 p
Dec 6, 2017 · Penalty $400
Resolve - Class - 2
Collection & containment. note: @ time of my insp of a 16 story bldg @ 5th flr level, construction work in progress. observed concrete washout operation being perform @ exp#1 in roadway via a metal box & canvas
Dec 6, 2017 · Penalty $1,200
Resolve