589 Fulton Street
Brooklyn, NY 11201BBL 3-00149-0014Map
Owner of record: Brook NY Residential LLC
589 Fulton Street is an elevator apartment building built in 2023 in Brooklyn, 11201. It has 591 residential units across 52 floors. The owner of record is Brook NY Residential LLC. HPD has recorded 13 housing violations here, most recently on October 15, 2026. 11 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 2
- ECB violations
- 26
- HPD complaints
- 57
Available now in this building
For rentstudio condo for rent in downtown brooklyn
New York, NY
For rent1-bedroom condo for rent in downtown brooklyn
New York, NY
For rent1-bedroom apartment for rent in downtown brooklyn
New York, NY
For rent1-bedroom condo for rent in downtown brooklyn
New York, NY
For rent2-bedroom condo for rent in downtown brooklyn
New York, NY
For rent2-bedroom condo for rent in downtown brooklyn
New York, NY
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- ANon-hazardous
Provide adequate supply of cold water for the fixtures wash basin in the bathroom located at apt 11j, 11th story, apartment at west
Oct 15, 2026 · Apt 11J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system in the entire apartment located at apt 11j, 11th story, 1st apartment from south at west
Oct 15, 2026 · Apt 11J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective casement operator at 2nd window from south at west in the 3rd room from north located at apt 50k, 50th story, 1st apartment from south at west
Oct 14, 2026 · Apt 50K
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 50k, 50th story, 1st apartment from south at west
Aug 18, 2026 · Apt 50K
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic washbasin in the bathroom located at apt 50k, 50th story, 1st apartment from west at north
Aug 18, 2026 · Apt 50K
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective defective wood floor in the foyer located at apt 50k, 50th story, 1st apartment from south at west
Aug 18, 2026 · Apt 50K
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 50k, 50th story, 1st apartment from south at west
Aug 18, 2026 · Apt 50K
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 50k, 50th story, 1st apartment from south at west
Aug 18, 2026 · Apt 50K
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around window sash in the bathroom located at apt 50k, 50th story, 1st apartment from west at north
May 22, 2026 · Apt 50K
Open — Not complied with - BHazardous
Refit swing window at north wall in the 4th room from east located at apt 50k, 50th story, 1st apartment from west at north
May 22, 2026 · Apt 50K
Open — Not complied with
Show 3 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 50k, 50th story, 1st apartment from west at north
May 22, 2026 · Apt 50K
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings all walls throughout in the entrance located at apt 50k, 50th story, 1st apartment from west at north
May 22, 2026 · Apt 50K
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 50k, 50th story, 1st apartment from west at north
Apr 16, 2026 · Apt 50K
Closed — Violation dismissed
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 3, 2002
Vw*-violation - work w/o permit dismissed
ECB violations · 26
- Class - 1
At the time of inspection of a 52 story mixed used building i observed construction activity at exp 3/ 4. workers installing and welding steel, no approved drawings provided and no ssm on site. stop all work un
Sep 30, 2026 · Penalty $10,000
Active - Class - 2
At the time of inspection of a 52 story mixed used building i observed construction activity at exp 3/ 4. workers installing and welding steel, no approved drawings provided and no ssm on site. stop all work un
Sep 30, 2026 · Penalty $1,250
Active - Class - 2
Active site observed spider crane in used at 4th floor set exp # 1. upon reviewing the site safety planned spider crane were not indicated.comply and /or amended drawings.
Jul 26, 2025 · Penalty $625
Resolve - Class - 1
At the time of my inspection of a 52 story new building at foundation phase, i observed at exposure #2 adjoining building has large cracks all over the exterior walls and inside the building cracks on the floor
Feb 21, 2023
Resolve - Class - 1
At the time of inspection of active construction site observed approx 20ft deep, 25ftx25ft excavation at corner of exp 3&4 with no support of sides or adequate slope in place and no guardrail system as required
Jul 26, 2022 · Penalty $5,000
Resolve - Class - 1
Observed active construction site at excavation phase and approx 20ft deep excavation at corner of exp 3&4. upon review of monitoring report provided for adjoining property at exp 3 it was found that on 07/16/2
Jul 26, 2022 · Penalty $2,500
Resolve - Class - 1
At the time of inspection of a proposed 55 story new building, i observed existing foundation wall being mechanically demolished. upon request for sequence and details for scope of demolition operation none was
Jul 26, 2022
Resolve - Class - 1
Observed existing concrete foundation being removed at corner of exp 3&4 with no demolition permit obtained prior to such work being performed.stop all demolition work.
Jul 26, 2022
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note:at time of my inspection i observed that the sidewalk shed errected at exposure#1 had no lights at the ungeiscde.the fixtures were present but the li
Jul 26, 2021 · Penalty $2,400
Resolve - Class - 2
Pedestrians protection doesnt meet code specs#3307.6.4.8 note:ato my insp,i observed sws erected@exp1&4.i also observed underside of sws wasnt provided w/lighting&all lightbulbs in place underside sws werent fu
Jul 14, 2021 · Penalty $2,400
Resolve
Show 16 more ↓
- Class - 2
Sec. 28-105.12.8 work contrary to site safety plan. at time of inspection of a full demolition 2 sty commercial bldg,i observed chain fence on top of yodlocks barriers when i observed site safety plans no chain
Jun 14, 2021 · Penalty $625
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:at time ofmy inspection of a 4 story bldg & 4 story bldg at 4 story stage,no work in progress.i observed at 5:15 am that the lights at the underside o
Apr 16, 2021 · Penalty $1,250
Resolve - Class - 2
No viewing panel in construction fence at time of inspection on an open demolition permit of 1 sty bldg. i observed no construction activityupon site inspection from exterior i noted no viewing panel on exp#1
Mar 19, 2020
Resolve - Class - 2
Project info panel/sidewalk shed parapet panel construction sign not provided or in compliance with section. noted: at time of my inspection of a 5 story building demolition complete and site at grade and
Jan 25, 2019 · Penalty $1,250
Resolve - Class - 2
Project info panel /sidewalk shed parapet panel construction sign not provided or in compliance with section. noted: at time of my inspection of a 5 story building demolition complete and site at
Jan 25, 2019 · Penalty $1,250
Resolve - Class - 2
Protect info panel/sidewalk shed parapet panel construction sign not provided or in compliance with section. noted: at time fo my insepction of a 5 story building demolition complete and site at grade and berm
Jan 25, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/vio# 35331762k issued on 6/10/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls or appurtenances @ time
Jul 18, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/vio# 35323497z issued on 5/1/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls & appurtenances. observe
Jul 10, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances at the timje of inspection,observed the sign at store front has become dislodged & potentialto collapse to street level. remedy: maintain exterior bldg walls and
Jun 10, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. at the time of inspection observed front of bldg at exp#1 an metal awning structure is leaning & pulled away from bldg. remedy: repair &/or replace.
Jun 10, 2018 · Penalty $1,562
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. @ time of insp @ above address on above date observed the sign from the stonefront has become dislodged & had the potential for collaspe. photos taken. rem: main
May 1, 2018 · Penalty $6,250
Resolve - Hazardous
Failure to maintain. defect noted:awning at store front measuring approx 20' x 5' has come loose of framing & is leaning onto adj awning foranthony's deli on flatbush ave ext at north east area.
Jun 15, 2006 · Penalty $800
Resolve - Hazardous
Occupancy contrary to that allowed by the certificate of occupancy. note. c of o #122799 indicate storage for five cars. now at time of inspection a one story structure illegally erected and being use as a
Apr 27, 2005
Resolve - Non-hazardous
New building occupied without a valid certificate of occupancy. note. application #301525678 process on 4/14/03 to renovate existing deli, installation of new flooring and ceiling. job #301525678 not signed off
Apr 27, 2005 · Penalty $350
Resolve - Non-hazardous
Work without a permit.hazardous note:department records indicate vacant storage of five cars.now a one story structure illegally erected and being used as a restaurant with kitchen in cellar with two range,deep
Apr 27, 2005
Resolve - Non-hazardous
Failure to have certificate of occupancy posted or available for inspection at time of inspection. building being use as a restaurant and novisible c of o observe at premises. remedy: have certificate of
Apr 27, 2005 · Penalty $400
Resolve
Complaints
- Unsanitary condition
Pests
Oct 19, 2026 · Apt 4C
Open - Unsanitary condition
Pests
Oct 19, 2026 · Apt 4C
Open - General
Bell/buzzer/intercom
Oct 12, 2026 · Apt 11J
Close - Plumbing
Water supply
Oct 5, 2026 · Apt 11J
Close - Paint/plaster
Wall
Sep 14, 2026 · Apt 37K
Close - Unsanitary condition
Pests
Sep 10, 2026 · Apt ALLFLO
Close - Unsanitary condition
Garbage/recycling storage
Sep 10, 2026 · Apt ALLFLO
Close - Unsanitary condition
Garbage/recycling storage
Sep 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 9, 2026 · Apt BLDG
Close - Electric
Lighting
Aug 21, 2026 · Apt 5K
Close
Show 40 more ↓
- Plumbing
Water supply
Aug 18, 2026 · Apt 11J
Close - Heat/hot water
Apartment only
Aug 14, 2026 · Apt 6E
Close - Heat/hot water
Apartment only
Aug 14, 2026 · Apt 3S
Close - Heat/hot water
Apartment only
Aug 13, 2026 · Apt 12F
Close - Heat/hot water
Entire building
Aug 13, 2026 · Apt BLDG
Close - Water leak
Damp spot
Aug 9, 2026 · Apt 50K
Close - Unsanitary condition
Sewage
Aug 9, 2026 · Apt 50K
Close - General
Ventilation system
Aug 9, 2026 · Apt 50K
Close - Heat/hot water
Apartment only
Aug 8, 2026 · Apt 3S
Close - Heat/hot water
Apartment only
Aug 3, 2026 · Apt 39H
Close - Heat/hot water
Apartment only
Jul 31, 2026 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jul 2, 2026 · Apt 38D
Close - Heat/hot water
Apartment only
Jul 2, 2026 · Apt 10E
Close - General
Ventilation system
Jun 30, 2026 · Apt 28A
Close - Unsanitary condition
Garbage/recycling storage
Jun 30, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 18, 2026 · Apt BLDG
Close - General
Ventilation system
Jun 17, 2026 · Apt 50K
Close - Unsanitary condition
Sewage
Jun 17, 2026 · Apt 50K
Close - Unsanitary condition
Pests
Jun 16, 2026 · Apt PHD
Close - Unsanitary condition
Pests
Jun 16, 2026 · Apt 31A
Close - Unsanitary condition
Pests
Jun 16, 2026 · Apt 11J
Close - Unsanitary condition
Pests
Jun 16, 2026 · Apt 11J
Close - Heat/hot water
Apartment only
Jun 13, 2026 · Apt 17J
Close - Heat/hot water
Entire building
Jun 9, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 8, 2026 · Apt 11J
Close - Plumbing
Water supply
Jun 8, 2026 · Apt 11J
Close - General
Ventilation system
May 9, 2026 · Apt PHK
Close - General
Ventilation system
May 7, 2026 · Apt 50K
Close - Flooring/stairs
Floor
May 7, 2026 · Apt 50K
Close - Paint/plaster
Wall
May 7, 2026 · Apt 50K
Close - Water leak
Heavy flow
Apr 30, 2026 · Apt 50K
Close - Unsanitary condition
Sewage
Apr 21, 2026 · Apt 50K
Close - Electric
Wiring
Apr 5, 2026 · Apt 50K
Close - Paint/plaster
Ceiling
Apr 5, 2026 · Apt 50K
Close - Safety
Fire escape
Apr 5, 2026 · Apt 50K
Close - Unsanitary condition
Garbage/recycling storage
Apr 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Jan 12, 2026 · Apt 50K
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 52
- Residential units
- 591
- Building area
- 565,326 ft²
- Lot area
- 27,530 ft²
- Zoning
- C6-4.5
- Community board
- 302
- Council district
- 33
- Block / lot
- 149 / 14
- Assessed value
- $75,677,850
- Landmark / historic district
- No
HPD registration #391644, last renewed Oct 31, 2025.
Questions about 589 Fulton Street
Who owns 589 Fulton Street?
The owner of record in NYC Department of City Planning PLUTO data is Brook NY Residential LLC.
Does 589 Fulton Street have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 589 Fulton Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 589 Fulton Street built?
City records list 2023 as the year it was built.
How many apartments are in 589 Fulton Street?
It has 591 residential units and 593 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.