roofy

Violations at 555 City Island Avenue

Bronx, NY 10464 · BBL 2-05635-0149 · Back to the property

HPD housing violations

19 HPD violations, newest first.

  • BHazardous

    Properly repair or replace the broken or defective hydronic baseboard cover at east wall in the 1st room from east at south located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 18, 2026 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 18, 2026 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 18, 2026 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective hydronic baseboard cover at west wall in the 3rd room from east at north located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 18, 2026 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 18, 2026 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Jul 2, 2025 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Replace with new the missing electrical outlet cover plate at north wall at public hall, 1st story

    Jul 2, 2025

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south

    Jul 2, 2025 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color east wall and west wall in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south

    Jul 2, 2025 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Jul 2, 2025 · Apt 2C

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective light switch at south and north wall at 2nd story at public hall stairs

    Dec 12, 2024

    Open — Nov sent out
  • BHazardous

    Properly repair and abate unsafe electric wiring condition consisting of wires exposed from removed light switch at south wall at 2nd story at public hall stairs

    Dec 12, 2024

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective ...lower window sash glass window pane at east wall in the 2nd room from north at east located at apt floor2, 2nd story, 1st apartment from west at north

    Nov 19, 2024 · Apt FLOOR2

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department ...at ceiling in the 1st room from north at east located at apt floor2, 2nd story, 1st apartment from west at north

    Nov 19, 2024 · Apt FLOOR2

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ...at ceiling in the 1st room from north at east located at apt floor2, 2nd story, 1st apartment from west at north

    Nov 19, 2024 · Apt FLOOR2

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective ...lower sash glass window pane at west wall. in the kitchen located at apt floor2, 2nd story, 1st apartment from west at north

    Nov 19, 2024 · Apt FLOOR2

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 18, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 7, 2024 · Apt 2C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south

    Sep 7, 2024 · Apt 2C

    Open — Notice of issuance sent to tenant

DOB building violations

6 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Apr 23, 1993

    Dob violation - dismissed

ECB violations

2 ECB violations, newest first.

  • Class - 1

    Noted at time of my inspection i observed at the second floor of this property, with active demolition work in progress without a permit, removing the interior walls and ceiling and framing. also observed in ki

    Feb 12, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Gas piping installed in an improper location. found at location, high pressure gas piping installed in egress of residential stwy gas pipingnot allowed in public stwy. remedy: inform utility obtain a permit and

    Mar 30, 2011 · Penalty $2,500

    Active