Violations at 555 City Island Avenue
Bronx, NY 10464 · BBL 2-05635-0149 · Back to the property
HPD housing violations
19 HPD violations, newest first.
- BHazardous
Properly repair or replace the broken or defective hydronic baseboard cover at east wall in the 1st room from east at south located at apt 2c, 2nd story, 1st apartment from east at south
Sep 18, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 18, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 18, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective hydronic baseboard cover at west wall in the 3rd room from east at north located at apt 2c, 2nd story, 1st apartment from east at south
Sep 18, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 18, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Jul 2, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet cover plate at north wall at public hall, 1st story
Jul 2, 2025
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Jul 2, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall and west wall in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Jul 2, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Jul 2, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light switch at south and north wall at 2nd story at public hall stairs
Dec 12, 2024
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of wires exposed from removed light switch at south wall at 2nd story at public hall stairs
Dec 12, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...lower window sash glass window pane at east wall in the 2nd room from north at east located at apt floor2, 2nd story, 1st apartment from west at north
Nov 19, 2024 · Apt FLOOR2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ...at ceiling in the 1st room from north at east located at apt floor2, 2nd story, 1st apartment from west at north
Nov 19, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ...at ceiling in the 1st room from north at east located at apt floor2, 2nd story, 1st apartment from west at north
Nov 19, 2024 · Apt FLOOR2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...lower sash glass window pane at west wall. in the kitchen located at apt floor2, 2nd story, 1st apartment from west at north
Nov 19, 2024 · Apt FLOOR2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 18, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 7, 2024 · Apt 2C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 7, 2024 · Apt 2C
Open — Notice of issuance sent to tenant
DOB building violations
6 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Apr 23, 1993
Dob violation - dismissed
ECB violations
2 ECB violations, newest first.
- Class - 1
Noted at time of my inspection i observed at the second floor of this property, with active demolition work in progress without a permit, removing the interior walls and ceiling and framing. also observed in ki
Feb 12, 2025 · Penalty $2,500
Resolve - Class - 2
Gas piping installed in an improper location. found at location, high pressure gas piping installed in egress of residential stwy gas pipingnot allowed in public stwy. remedy: inform utility obtain a permit and
Mar 30, 2011 · Penalty $2,500
Active