roofy

Violations at Silver Beach

Bronx, NY 10465 · BBL 2-05506-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

11 DOB violations, newest first.

  • Plumbing none

    Based on lic # 1343 being inactive, stop all plumbing work under job #x00281955 immediately.

    Jul 21, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 27, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 17, 1999

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Mar 7, 1999

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 2, 1998

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 14, 1990

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Aug 31, 1989

    Dob violation - dismissed

ECB violations

42 ECB violations, newest first.

  • Class - 1

    Work without a permit. observed newly/recently installed block foundation at exposure#2,3 and 4. no permits on file., obtain permit; obtain all permits

    Dec 3, 2025 · Penalty $2,500

    Active
  • Class - 1

    Work without a permit. observed newly/recently installed second floor addition at rear of house, newly/recently installed wood frame at exposure#2,3,and 4. no permits on file, obtain permit; obtain all permits

    Dec 3, 2025 · Penalty $2,500

    Active
  • Class - 1

    On-site for demo sign-off appointment of a one-story detached house. house is fully demolished. upon research through dob now system, notification was not provided to the department before start of demolition w

    Dec 23, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    At the time of inspection i observed removal/demo of all light fixtures, outlets, switches, and branch wiring throughout the entire house. also new installation of temporary wiring outlets and switch. no applic

    Nov 27, 2023 · Penalty $1,600

    Active
  • Class - 1

    At the time of inspection i observed outside the left side of the house exposed electrical service wires not safely secured hanging off a metal scaffold which can be energized by the wire if damaged, comply wit

    Nov 27, 2023 · Penalty $1,600

    Active
  • Class - 2

    At inspection, it was observed: 8 feet high plywood construction fence on all exposures, upon review of the dob website, there was no fence permit issued prior to installation contrary to code. obtain temporary

    Sep 30, 2023

    Resolve
  • Class - 1

    Observed energized powerlines running within 3' of a pump jack scaffolds. scaffolds must not be erected, used, dismantled, altered, or moved such that they or any conductive material on them might come closer t

    Sep 29, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements.at the time of inspection of a 2 story alt,i observed on the ground levelon all expos material,debris,garabage and equipment all over & randoml

    Mar 18, 2020 · Penalty $625

    Resolve
  • Class - 2

    Work does not conform to approved plans job # 220722252. 1- new floor joists, and section of center girder installed below first story rear extension. 2- new wood roof at extension. 3-sections of exterior and i

    Mar 5, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order contained in summons/violation#39008763h issued on 8/29/19 and to file a certificate of correction pursant to 28-201.1 and 1rcny 102.01.b121:demo work without req

    Feb 14, 2020 · Penalty $2,530

    Resolve
  • Class - 2

    Falilure to comply with the commissioner's order contained in summons/violation#39008763h issued on 08/29/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.demo work without permi

    Dec 5, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Work without a permit. at time of inspection noted an illegal addition added onto the house. the addition measures around 8 feet wide by 18 feet in length by 12 feet in height. removal of plumbing and electrica

    Nov 6, 2019

    Resolve
  • Class - 2

    Work without a permit. at time of inspection noted a construction fence up around the property. no permit on file with dob., obtain all permits; obtain all permits

    Aug 30, 2019 · Penalty $620

    Resolve
  • Class - 1

    Demolition work without required demolition permit. at time of inspection noted the existing structure no longer in place. new concrete footings and walls are erected. contrary to permit #220686096, obtain requ

    Aug 29, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection. at time of inspection no plans on site for job #220686096. three male workers. full stop work order issued. the wor

    Aug 29, 2019

    Resolve
  • Class - 1

    Unlawful acts. failure to comply with commissioners order involving construction operations.at time of demo legalization inspeciton noted on bis that the deputy borough commissioner partially rescinded full

    Dec 20, 2018

    Resolve
  • Class - 1

    Work without a permit.at time of inspection noted a fence erected at jobsite no permit previous obtain for the erection of the fence.also fence has no viewing panels and is not painted hunter green as per code

    Dec 18, 2018 · Penalty $400

    Resolve
  • Class - 1

    Work w/o a permit. work noted: demolished entire building and excavated leaving a shear cut over eight feet deep w/o sheeting shoring or bracing while fence is open and no workers are present. "stop all work"

    Oct 30, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/ violation# 35248828r issued on 4/09/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a perm

    Jul 12, 2018 · Penalty $625

    Resolve
  • Class - 1

    Work without a permit. renovation of the entire house, new partitions, beams, insulation and plumbing lines. new electrical wiring observed with only "general wiring lighting work" permit obtained and filed for

    Apr 9, 2018 · Penalty $1,600

    Resolve
  • Class - 2

    Work without a permit.work noted;erected partitions at 1st flr left room to create closet approx.7'x 2'x 7';at top of staircase between 1st and nd flr.sealed up window opening with masonry blocks approx.25 sf.

    Jun 27, 2017

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in nov #35172735j issued on 05/21/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. note: no document filed for work w/o a permit. remedy: comply

    Oct 24, 2016

    Resolve
  • Class - 2

    Work w/o a permit. work noted: constructed a structural wooden deck atthe front of the dwelling,approx 12feet wide x 8feet deep x 6feet high. the deck is supported by wooden posts embedded into concrete sleeves

    Aug 29, 2016

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in nov#35172735j issued on 05/21/16 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.wrk w/out permit.rem:comply

    Aug 17, 2016

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in nov#35172735j issued on 5/21/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01.rem:comply with commissioner's order and/or file a

    Jul 29, 2016

    Resolve
  • Class - 1

    Work w/o a permit.@ time of inspection observed the following.structure on property has been completely demolished due to grade.patial block foundation left in place and not (sackfilled).construction fence in p

    May 21, 2016

    Resolve
  • Class - 2

    Pc1101.2failaure to comply w/storm/rain water drainage requirement for roof,paved area of yard.noted:observed @ exp.1 leader running from roof to grade is connected to 3"pvc pipe that empties water at the stree

    May 8, 2014

    Resolve
  • Class - 1

    Work w/o a permit. noted: at front of premises, wooden deck installed along embarkment, approx area 15' x 15'. deck is raised from ground 1 sty approx. remedy: provide structure stability report from a pe or ra

    Aug 15, 2011

    Resolve
  • Non-hazardous

    Failure to post construction sign remedy:provide construction sign

    Jan 21, 2005 · Penalty $500

    Active
  • Hazardous

    Failure to provide 8 high fence were required during excavation operations 2'by 4' & blue tarp are not dept standards. "stop all work" remedy:stop all work immediately except to provide fence.

    Jan 21, 2005 · Penalty $480

    Active
  • Non-hazardous

    Work without permit demolished entire house at side including foundation "stop all work" remedy:obtain all necessary permits.

    Jan 21, 2005 · Penalty $500

    Active
  • Hazardous

    Failure to provide 8 foot high fence where required during excavation operations.remedy:"stop all work" immediately except to install protective fence around entire site w/construction gate.

    Jan 5, 2005 · Penalty $480

    Active
  • Non-hazardous

    Failure to post contractors sign. remedy:provide contractors sign.

    Jan 5, 2005 · Penalty $500

    Active
  • Non-hazardous

    Work without permit.removed entire building & foundation without a demolition permit."stop all work".remedy:obtain permits if feasible.

    Jan 5, 2005 · Penalty $500

    Active
  • Non-hazardous

    Plumbing work w/o a permit. found on 1st & 2nd fl plumbing work was done w/o permit at site remedy: obtain a permit if feasible call for appointment

    Sep 15, 2004 · Penalty $800

    Resolve
  • Non-hazardous

    No job site fence. remedy: stop all work with job site fence is immediately provided, except for work necessary to make site safe.

    Aug 14, 2003 · Penalty $1,000

    Resolve
  • Hazardous

    Work w/o permit having excavation the crave space to a deeper of approx 4 throughout installed inadequate temp sharing causing house to sink approx 6 due to heavy rear accumulation remedy vacute premises obtain

    Jun 1, 2003 · Penalty $800

    Resolve
  • Non-hazardous

    Work does not conform to approved plans. non-conforming work noted: entire buiding demolished contrary to alteration number 200607129. remedy: stop all work except for work necessary to make site safe ,amend pl

    Jun 12, 2000 · Penalty $130

    Active
  • Non-hazardous

    Work w/o a permit.work noted:removed entire roof, interior walls, and over fifty percent of the exterior walls.constructing new exterior wall at rear.remedy:stop all work,make site safe, provide job site fence

    Jun 1, 2000

    Resolve
  • Hazardous

    No job site fence. building demolished approx 6,400 cubic hole remainsremedy: immediately provide fence.

    Apr 21, 2000 · Penalty $1,000

    Active
  • Non-hazardous

    Work does not conform to approved plns. nonconforming work noted demolished entire building contrary to alteration number 200607129. remedy:amend plans and permit.

    Apr 21, 2000 · Penalty $2,500

    Active
  • Non-hazardous

    Work without a permit. work noted: constructing two story wooden structure throughout work done under alt 486-89 stop all work remdey:obtain permit from this dept.

    Aug 22, 1990

    Resolve