Violations at 623 Logan Avenue
Bronx, NY 10465 · BBL 2-05436-0062 · Back to the property
HPD housing violations
28 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 2nd story
Oct 15, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retartent material at all walls and ceiling at public hall, 2nd story
Oct 15, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling (public hall staircase intermediate landing) at public hall, 2nd story
Oct 15, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 15, 2025
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors missing and unit numbers at public hall, 1st story
Oct 15, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing at public hall, 1st story
Oct 15, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater missing cover in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden baseboard wrapped in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at sink at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bottom base cabinet rotting at west, east, south walls in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter top rotting at west, east, south walls in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective chaulking around bathtub in the 2nd bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglazing porcelain enamel finish by methor of reglazing at bathtub in the 2nd bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the 2nd bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 2nd bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the 2nd bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls ceiling in the 1st bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above the ceiling in the 1st bathroom from north located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater missing cover in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Oct 15, 2025 · Apt 2
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
4 ECB violations, newest first.
- Non-hazardous
Work without a permit. work noted excavation throughout front & back stop all work remedy: file plans & obtain approval & permit.
Oct 17, 1991 · Penalty $285
Resolve - Hazardous
Failure to provide protection at side of excavation more than 5' at rear and front south side without sheeting and bracing stop all work remedy provide sheeting & bracing at side excavation
Oct 17, 1991 · Penalty $460
Resolve - Non-hazardous
Illegal use in a residential district: storage of five motor vehicles in an r-3 zoning didtrict. remedy; discontinue illegal auto storage forthwith.
Apr 10, 1991 · Penalty $500
Resolve - Hazardous
Failure to provide protection at side of excavation: shoring not pro- vided at 14' deep sheer cut at north-west rear of lot. remedy: stop all work except that required to make the site safe. provide shoring
Apr 10, 1991
Resolve