Violations at 3439 Contry Club Road
Bronx, NY 10465 · BBL 2-05409-0424 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
6 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Construction other optional
Boro commissioner's office notice of order to stop all work immediatel y due to permit holder withdrawal from job #220516118(al,fo,fo-ea,eq-f n) (fswo) stop all work. make jobsite safe
Nov 25, 2019
Dob violation - dismissed - Construction other optional
Commissioner's notice of order to stop work immediately due to withdra wal of superintendent of construction for job #220516118
Oct 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed
ECB violations
19 ECB violations, newest first.
- Class - 2
Supported scaffold not maintained and or erect as per code. observed supported scaffold installed at exposure 1 with missing guardrails and toeboards,missing debris netting,planks not tied down, scaffold not se
Oct 18, 2022
Resolve - Class - 1
Permit holder failed to ensure workers attend pre-shift safety meetingprior to commencement of work. at time of inspection on a proposed 2-story alteration site observed 6 workers on site engaging in constructi
Apr 5, 2021 · Penalty $5,000
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientation. at time of inspection of 2 story building,observed no site safety orientation were provided for the 5-6 worker. upon request of site safet
Apr 5, 2021
Resolve - Class - 2
Failure to maintain jobsite fence as required. at time of inspection on a proposed 2-story alteration site observed at exposure#4 in rear ofsite;job site fence open and not fully enclosing the site allowing per
Apr 5, 2021
Resolve - Class - 2
Construction superintendent failed to do duties as per code. at time of inspection on a proposed 2-story alteration site currently under a partial stop work order for non-conformance of dob approved plans. obse
Apr 5, 2021 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at time of inspection i observed an active construction site w/ framing workin progress,during inspection noted after review&search on bis system
Feb 4, 2021
Resolve - Class - 1
3305.2.2 structural steel assembly/fabrication at the time of inspection of a 2 story alteration,i observed steel assembly/fabrication/connection modified from cellar/1st floor upon request for approved drawing
Jan 19, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approve construction documents and/or amendments.cellar/first fl.structural plans at time of inspection at a 2 story alteration i observed on the cellar and 1st floor structural steel d
Jan 19, 2021 · Penalty $2,500
Resolve - Class - 2
Bc 3307.7 job site fence not constructed or maintained pursuant to subsection. at time of inspection observed an active construction site w/wood framing on progress, during inspection noted at exposure#4 missin
Sep 14, 2018
Resolve - Class - 2
Construction superintendent failed to perform duties per code. at timeof inspection observed an active construction site w/ wood framing on progress, during inspection i ask worker for superintendent or compete
Sep 14, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33. "ssp" at time of inspection observed an active construction site w/wood framing on progress, during inspection i ask for at site safety p
Sep 14, 2018 · Penalty $625
Resolve - Class - 2
Bc-3301.2 uncapped rebars at time of inspection observed an active construction site w/ wood framing on progress, during inspection noted atthe cellar level there was no rebar cap, this creating hazardous condi
Sep 14, 2018 · Penalty $625
Resolve - Class - 1
Bc-3301.2 no guard rails. at time of inspection observed an active construction site w/ wood framing on progress, during inspection noted onthe 2nd fl there was no guardrails at way exposure, this creating haza
Sep 14, 2018 · Penalty $2,500
Resolve - Class - 2
Bc3307.7 fence note at time of inspection of a bldg to grade-excava tion on site, i observed site is not fully fence at exp2, 3, 4. stop all work - entire site except to provide fence. rmdy: stop all work
Jan 11, 2018 · Penalty $400
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35247650y issued on 04/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c filed. remedy: comply w/comm's order &/or file a c of
Dec 21, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35247650y issued on 04/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 9, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/violation #35247650y issued on 04/19/17 and to file a certificate of correction pusuant to 28-2011 and 1rcny 102-01. noted: document file for job #
Aug 22, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35247650y issued on 04/19/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work w/o permit.rem:
Jun 27, 2017 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit. work noted: demolished roof,2nd sty & most of 1st sty except part of front wall. note: work is not covered under permit #220557190 also note application #220516118 is only approved & not perm
Apr 19, 2017 · Penalty $1,600
Resolve