4621 Carpenter Avenue
Bronx, NY 10470BBL 2-05078-0061Map
Owner of record: Bkbx01 Investors INC
4621 Carpenter Avenue is a walk-up apartment building built in 1920 in Bronx, 10470. It has 3 residential units across 2 floors. The owner of record is Bkbx01 Investors INC. HPD has recorded 51 housing violations here, most recently on April 12, 2026. 6 of the 50 most recent violations are still open.
- HPD violations
- 51
- DOB violations
- 3
- ECB violations
- 12
- HPD complaints
- 67
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 12, 2026
Closed — Violation dismissed - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story
Apr 12, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story
Apr 12, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing
Apr 12, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 12, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Apr 12, 2026
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts apartment at cellar under vacate order #260455 dated 02/20/2026
Feb 20, 2026
Open — Info nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections sink, water closet, wash basin and shower stall at cellar
Feb 13, 2026
Closed — Violation dismissed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, electric stove at cellar
Feb 13, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble saddle at entrance door to building at public hall, 1st story
Feb 12, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective marble tread 2nd up from bottom in vestibile at public hall, 1st story
Feb 12, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective right hand handrail at vestibule , 1st story
Apr 22, 2016
Open — Not complied with - CImmediately hazardous
Replace with new the broken or defective broken glass panel at vestibule door , 1st story
Apr 22, 2016
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective broken marble tread 2nd from bottom up at vestibule , 1st story
Apr 22, 2016
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective at bldg. entrance leading from street to public hall , 1st story
Jan 15, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Jan 15, 2016
Closed — Violation dismissed - ANon-hazardous
Refit the bldg. entrance door leading from street to public hall , 1st story
Jan 15, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jan 15, 2016 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Refit the apt. entrance door located at apt 2f, 2nd story, 1st apartment from north at east
Jan 15, 2016 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective apt. entrance door located at apt 2f, 2nd story, 1st apartment from north at east
Jan 15, 2016 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the 2nd room from east at south located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling ceiling in the 2nd room from east at south located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from west at north wall ceiling, 1st closet from west at north wall wall in the foyer located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane upper sash second window from south at west in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the broken or defective lock at the door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls ceilings and trims in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east at south, the bathroom , the foyer , the private hallway located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - BHazardous
Replace with new the missing light fixutre at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Oct 3, 2015 · Apt 2B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 3, 2015
Closed — Violation dismissed - BHazardous
Replace with new the missing electric outlet cover at north wall in the bathroom located at apt 1, 1st story
Dec 14, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective marble saddle at entrance door located at apt 1, 1st story
Dec 14, 2011 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the kitchen located at apt 1, 1st story
Dec 14, 2011 · Apt 1
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed
ECB violations · 12
- Class - 2
Failure to maintain building in code complaint matter; noted at exposure 2 step cracks in brick work between second and first floor window at middle of building., repair and/or replace
Jul 10, 2026 · Penalty $1,280
Active - Class - 1
Work without permit; noted at exterior of building at exposure 2 installed electrical lines for 7 fujitsu split cooling and heating system all with disconnected boxes., obtain permit
Jul 10, 2026 · Penalty $2,530
Active - Class - 2
Failure to maintain building in code complaint manner; noted at second floor rear apartment at front bedroom has cracks and bulge in wall at right side of window., repair and/or replace
Jul 9, 2026 · Penalty $1,280
Active - Class - 1
Occupancy in contrary to that allowed by c/o and/or department of building records. illegal class "a" apartment created at cellar, with fullbathroom and kitchen. vacate recommended due to no 2nd means of egress
Feb 13, 2026 · Penalty $12,500
Active - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 34851348h issued on 08/02/10. bsmt apt occupied w/o adequate light & ventillation. remedy : comply w/ the commissioner's order
Dec 16, 2011 · Penalty $24,000
Resolve - Class - 2
Failure to comply with the commissioners order to file a certificate of correction with the department of buildings for notice of violation #34851348h issued on 08/02/10 pursuant to 28-204.4 & 1rcny 102-01.
Dec 16, 2011 · Penalty $8,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the d.o.b. for open e.c.b. nov # 34851348h & 34877304l .remedy : comply w/ the commissioner's order to file a certificate of c
Feb 19, 2011 · Penalty $800
Resolve - Class - 1
Fail to comply w.comm order respondent failed to correct the conditions cited in prior nov 34851347x installed plumbing & electric to createbasement apt. no permits have been issued to remove illegal work or to
Oct 2, 2010 · Penalty $12,000
Resolve - Class - 2
Sec bc 3314.4.6 & rcny 52-05 unqualified persons using a supported scaffold. noted: at side yard driveway 2 persons observed using supportedscaffold approx 22 feet high (4 sections with wheels attached) w.o use
Oct 2, 2010 · Penalty $4,000
Resolve - Class - 2
Sec bc 3314.9.2 & 27-1009 (a) fail to provide adequate foundation for supported scaffold. noted: 4 sections of 5' pipe scaffold erected at sideyard driveway w.o proper foundation. wheels attached & proper foun
Oct 2, 2010 · Penalty $4,000
Resolve
Show 2 more ↓
- Class - 1
Work w/o permit noted in bsmt of multiple dwelling erected partitions performed plumbing and electrical work to create class a apt studio including ktcn & 3pc bath blocks physical access to gas meters visual ac
Aug 2, 2010 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by bldg dept records observed front of bsmt occupied as ibr apt w/ insufficient natural light or natural ventilations no light or ventilation in bdrm and no mechanical ventila
Aug 2, 2010 · Penalty $2,400
Resolve
Complaints
- Door/window
Window frame
Feb 9, 2026 · Apt 2R
Open - Heat/hot water
Entire building
Feb 9, 2026 · Apt 2R
Open - Door/window
Door
Feb 9, 2026 · Apt 2R
Open - Water leak
Slow leak
Feb 9, 2026 · Apt 2R
Open - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 2R
Open - Unsanitary condition
Sewage
Feb 5, 2026 · Apt BASEME
Close - Unsanitary condition
Mold
Feb 5, 2026 · Apt BASEME
Close - Water leak
Heavy flow
Feb 5, 2026 · Apt BASEME
Close - Electric
Outlet/switch
Feb 5, 2026 · Apt BASEME
Close - Heat/hot water
Apartment only
Nov 25, 2025 · Apt 2R
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 30, 2018 · Apt 2F
Close - Heat/hot water
Entire building
Oct 28, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 25, 2016 · Apt 2
Close - Flooring/stairs
Stairs
Apr 17, 2016 · Apt 2B
Close - Flooring/stairs
Stairs
Apr 17, 2016 · Apt 2B
Close - Heat/hot water
Entire building
Jan 29, 2016 · Apt 2A
Close - Heat/hot water
Entire building
Jan 20, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2016 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 17, 2015 · Apt 2
Close - Paint/plaster
Door/frame
Sep 30, 2015 · Apt 2B
Close - Unsanitary condition
Mold
Sep 30, 2015 · Apt 2B
Close - Paint/plaster
Wall
Sep 30, 2015 · Apt 2B
Close - Electric
No lighting
Sep 30, 2015 · Apt 2B
Close - Paint/plaster
Wall
Sep 30, 2015 · Apt 2B
Close - Paint/plaster
Ceiling
Sep 30, 2015 · Apt 2B
Close - Water leak
Slow leak
Sep 30, 2015 · Apt 2B
Close - Paint/plaster
Wall
Sep 30, 2015 · Apt 2B
Close - Paint/plaster
Ceiling
Sep 30, 2015 · Apt 2B
Close - Appliance
Electric/gas range
Sep 30, 2015 · Apt 2B
Close - Appliance
Refrigerator
Sep 30, 2015 · Apt 2B
Close - Door/window
Window frame
Sep 30, 2015 · Apt 2B
Close - Water leak
Slow leak
Sep 30, 2015 · Apt 2B
Close - Heat/hot water
Entire building
Oct 25, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2014 · Apt 2
Close - Heat/hot water
Entire building
Oct 23, 2014 · Apt BLDG
Close - Electric
No lighting
May 8, 2014 · Apt BLDG
Close - Electric
No lighting
May 8, 2014 · Apt BLDG
Close - Electric
No lighting
May 8, 2014 · Apt BLDG
Close - Door/window
Door
May 8, 2014 · Apt BLDG
Close - Heating
Heat related
Nov 21, 2013 · Apt NA
Close - Heating
Heat related
Nov 13, 2013 · Apt NA
Close - Heating
Heat related
Nov 12, 2013 · Apt NA
Close - Heating
Heat related
Dec 11, 2011 · Apt 2F
Close - Heating
Heat related
Apr 8, 2011 · Apt 2F
Close - Heating
Heat related
Apr 1, 2011 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 2,930 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5A
- Community board
- 212
- Council district
- 11
- Block / lot
- 5078 / 61
- Assessed value
- $51,540
- Landmark / historic district
- No
HPD registration #218695, last renewed Oct 24, 2025.
Questions about 4621 Carpenter Avenue
Who owns 4621 Carpenter Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bkbx01 Investors INC.
Does 4621 Carpenter Avenue have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 4621 Carpenter Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4621 Carpenter Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 4621 Carpenter Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.