roofy

4621 Carpenter Avenue

Bronx, NY 10470BBL 2-05078-0061Map

Owner of record: Bkbx01 Investors INC

4621 Carpenter Avenue is a walk-up apartment building built in 1920 in Bronx, 10470. It has 3 residential units across 2 floors. The owner of record is Bkbx01 Investors INC. HPD has recorded 51 housing violations here, most recently on April 12, 2026. 6 of the 50 most recent violations are still open.

HPD violations
51
DOB violations
3
ECB violations
12
HPD complaints
67

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 12, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 51

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 12, 2026

    Closed — Violation dismissed
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story

    Apr 12, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story

    Apr 12, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing

    Apr 12, 2026

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Apr 12, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Apr 12, 2026

    Closed — Violation closed
  • I

    Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts apartment at cellar under vacate order #260455 dated 02/20/2026

    Feb 20, 2026

    Open — Info nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections sink, water closet, wash basin and shower stall at cellar

    Feb 13, 2026

    Closed — Violation dismissed
  • B

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, electric stove at cellar

    Feb 13, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective marble saddle at entrance door to building at public hall, 1st story

    Feb 12, 2026

    Closed — Violation closed
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective marble tread 2nd up from bottom in vestibile at public hall, 1st story

    Feb 12, 2026

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 4, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective right hand handrail at vestibule , 1st story

    Apr 22, 2016

    Open — Not complied with
  • C

    Replace with new the broken or defective broken glass panel at vestibule door , 1st story

    Apr 22, 2016

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective broken marble tread 2nd from bottom up at vestibule , 1st story

    Apr 22, 2016

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective at bldg. entrance leading from street to public hall , 1st story

    Jan 15, 2016

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at basement

    Jan 15, 2016

    Closed — Violation dismissed
  • A

    Refit the bldg. entrance door leading from street to public hall , 1st story

    Jan 15, 2016

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east

    Jan 15, 2016 · Apt 2F

    Closed — Violation dismissed
  • A

    Refit the apt. entrance door located at apt 2f, 2nd story, 1st apartment from north at east

    Jan 15, 2016 · Apt 2F

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective apt. entrance door located at apt 2f, 2nd story, 1st apartment from north at east

    Jan 15, 2016 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the 2nd room from east at south located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling ceiling in the 2nd room from east at south located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from west at north wall ceiling, 1st closet from west at north wall wall in the foyer located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperative in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation closed
  • C

    Replace with new the broken or defective glass pane upper sash second window from south at west in the 1st room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation closed
  • B

    Properly repair the broken or defective lock at the door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department walls ceilings and trims in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east at south, the bathroom , the foyer , the private hallway located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • B

    Replace with new the missing light fixutre at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    Oct 3, 2015 · Apt 2B

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 3, 2015

    Closed — Violation dismissed
  • B

    Replace with new the missing electric outlet cover at north wall in the bathroom located at apt 1, 1st story

    Dec 14, 2011 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the broken or defective marble saddle at entrance door located at apt 1, 1st story

    Dec 14, 2011 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the kitchen located at apt 1, 1st story

    Dec 14, 2011 · Apt 1

    Open — Nov sent out

DOB building violations · 3

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 13, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed

ECB violations · 12

  • Class - 2

    Failure to maintain building in code complaint matter; noted at exposure 2 step cracks in brick work between second and first floor window at middle of building., repair and/or replace

    Jul 10, 2026 · Penalty $1,280

    Active
  • Class - 1

    Work without permit; noted at exterior of building at exposure 2 installed electrical lines for 7 fujitsu split cooling and heating system all with disconnected boxes., obtain permit

    Jul 10, 2026 · Penalty $2,530

    Active
  • Class - 2

    Failure to maintain building in code complaint manner; noted at second floor rear apartment at front bedroom has cracks and bulge in wall at right side of window., repair and/or replace

    Jul 9, 2026 · Penalty $1,280

    Active
  • Class - 1

    Occupancy in contrary to that allowed by c/o and/or department of building records. illegal class "a" apartment created at cellar, with fullbathroom and kitchen. vacate recommended due to no 2nd means of egress

    Feb 13, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to comply w/ the commissioner's order contained in notice of violation # 34851348h issued on 08/02/10. bsmt apt occupied w/o adequate light & ventillation. remedy : comply w/ the commissioner's order

    Dec 16, 2011 · Penalty $24,000

    Resolve
  • Class - 2

    Failure to comply with the commissioners order to file a certificate of correction with the department of buildings for notice of violation #34851348h issued on 08/02/10 pursuant to 28-204.4 & 1rcny 102-01.

    Dec 16, 2011 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the d.o.b. for open e.c.b. nov # 34851348h & 34877304l .remedy : comply w/ the commissioner's order to file a certificate of c

    Feb 19, 2011 · Penalty $800

    Resolve
  • Class - 1

    Fail to comply w.comm order respondent failed to correct the conditions cited in prior nov 34851347x installed plumbing & electric to createbasement apt. no permits have been issued to remove illegal work or to

    Oct 2, 2010 · Penalty $12,000

    Resolve
  • Class - 2

    Sec bc 3314.4.6 & rcny 52-05 unqualified persons using a supported scaffold. noted: at side yard driveway 2 persons observed using supportedscaffold approx 22 feet high (4 sections with wheels attached) w.o use

    Oct 2, 2010 · Penalty $4,000

    Resolve
  • Class - 2

    Sec bc 3314.9.2 & 27-1009 (a) fail to provide adequate foundation for supported scaffold. noted: 4 sections of 5' pipe scaffold erected at sideyard driveway w.o proper foundation. wheels attached & proper foun

    Oct 2, 2010 · Penalty $4,000

    Resolve
Show 2 more ↓
  • Class - 1

    Work w/o permit noted in bsmt of multiple dwelling erected partitions performed plumbing and electrical work to create class a apt studio including ktcn & 3pc bath blocks physical access to gas meters visual ac

    Aug 2, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by bldg dept records observed front of bsmt occupied as ibr apt w/ insufficient natural light or natural ventilations no light or ventilation in bdrm and no mechanical ventila

    Aug 2, 2010 · Penalty $2,400

    Resolve

Complaints

  • Door/window

    Window frame

    Feb 9, 2026 · Apt 2R

    Open
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt 2R

    Open
  • Door/window

    Door

    Feb 9, 2026 · Apt 2R

    Open
  • Water leak

    Slow leak

    Feb 9, 2026 · Apt 2R

    Open
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 2R

    Open
  • Unsanitary condition

    Sewage

    Feb 5, 2026 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Feb 5, 2026 · Apt BASEME

    Close
  • Water leak

    Heavy flow

    Feb 5, 2026 · Apt BASEME

    Close
  • Electric

    Outlet/switch

    Feb 5, 2026 · Apt BASEME

    Close
  • Heat/hot water

    Apartment only

    Nov 25, 2025 · Apt 2R

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Nov 30, 2018 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2016 · Apt 2

    Close
  • Flooring/stairs

    Stairs

    Apr 17, 2016 · Apt 2B

    Close
  • Flooring/stairs

    Stairs

    Apr 17, 2016 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2016 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 13, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 13, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2016 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Oct 17, 2015 · Apt 2

    Close
  • Paint/plaster

    Door/frame

    Sep 30, 2015 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Sep 30, 2015 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Sep 30, 2015 · Apt 2B

    Close
  • Electric

    No lighting

    Sep 30, 2015 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Sep 30, 2015 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2015 · Apt 2B

    Close
  • Water leak

    Slow leak

    Sep 30, 2015 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Sep 30, 2015 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2015 · Apt 2B

    Close
  • Appliance

    Electric/gas range

    Sep 30, 2015 · Apt 2B

    Close
  • Appliance

    Refrigerator

    Sep 30, 2015 · Apt 2B

    Close
  • Door/window

    Window frame

    Sep 30, 2015 · Apt 2B

    Close
  • Water leak

    Slow leak

    Sep 30, 2015 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2014 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2014 · Apt BLDG

    Close
  • Electric

    No lighting

    May 8, 2014 · Apt BLDG

    Close
  • Electric

    No lighting

    May 8, 2014 · Apt BLDG

    Close
  • Electric

    No lighting

    May 8, 2014 · Apt BLDG

    Close
  • Door/window

    Door

    May 8, 2014 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 21, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Nov 13, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Nov 12, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Dec 11, 2011 · Apt 2F

    Close
  • Heating

    Heat related

    Apr 8, 2011 · Apt 2F

    Close
  • Heating

    Heat related

    Apr 1, 2011 · Apt 2F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1920
Floors
2
Residential units
3
Building area
2,930 ft²
Lot area
2,500 ft²
Zoning
R5A
Community board
212
Council district
11
Block / lot
5078 / 61
Assessed value
$51,540
Landmark / historic district
No

HPD registration #218695, last renewed Oct 24, 2025.

Questions about 4621 Carpenter Avenue

Who owns 4621 Carpenter Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Bkbx01 Investors INC.

Does 4621 Carpenter Avenue have violations?

Yes. NYC HPD has recorded 51 housing violations at this property.

Is 4621 Carpenter Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 4621 Carpenter Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 4621 Carpenter Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.