4381 Matilda Avenue
Bronx, NY 10466BBL 2-05040-0039Map
Owner of record: Doyley Headley
4381 Matilda Avenue is a walk-up apartment building built in 1931 in Bronx, 10466. It has 6 residential units across 3 floors. The owner of record is Doyley Headley. HPD has recorded 192 housing violations here, most recently on May 16, 2026. 46 of the 50 most recent violations are still open.
- HPD violations
- 192
- DOB violations
- 2
- ECB violations
- 0
- HPD complaints
- 187
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 192
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south and east wall in the bathroom located at apt 2, 1st story, 2nd apartment from west at north
May 16, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 16, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story, 2nd apartment from west at north
May 16, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures no electrical light at all story's at public hall
May 16, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective connection at drain pipe at wash basin in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 3
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 3, 2nd story, 1st apartment from south at west
Apr 5, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 2nd story, 2nd apartment from south at west
Mar 25, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
Mar 25, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
Mar 25, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 25, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 25, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Mar 25, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 25, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 2nd apartment from south at west
Mar 25, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th entire apartment from east at north located at apt 2, 1st story, 2nd apartment from south at west
Mar 25, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 25, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lolck and assembly at door in the entrance located at apt 4, 2nd story, 2nd apartment from south at west
Mar 25, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the 4th entire apartment from east at north located at apt 2, 1st story, 2nd apartment from south at west
Mar 25, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of door frame stored at bulkhead
Feb 20, 2026
Open — Nov sent out - BHazardous
Provide wire mesh at bulkhead skylight
Feb 20, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 20, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Feb 20, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 20, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 1, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at boiler room
Feb 12, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 12, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 2nd story, 2nd apartment from south at west
Feb 6, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 2nd story, 2nd apartment from south at west
Feb 6, 2026 · Apt 4
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Feb 6, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Feb 6, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 2nd apartment from south at west
Feb 6, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Feb 6, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2 lower level, 1st story, 2nd apartment from west at north
Jan 24, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west and north wall in the bathroom located at apt 2 lower level, 1st story, 2nd apartment from west at north
Jan 24, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2 lower level, 1st story, 2nd apartment from west at north
Jan 24, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2 lower level, 1st story, 2nd apartment from west at north
Jan 24, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counterbalance, at upper and lower window sashes in the entire apartment located at apt 2, 1st story, 2nd apartment from west at north
Jan 24, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum allowable temperutre of 130 degrees at fixtures in the kitchen located at apt 21stfl lower level, 1st story, 2nd apartment from west at north
Jan 24, 2026 · Apt 21STFL
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 3rd story, 1st apartment from east at south
Jan 21, 2026 · Apt 5
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from east at south
Jan 21, 2026 · Apt 5
Open — Notice of issuance sent to tenant
DOB building violations · 2
- Plumbing none
The department of buildings intends to revoke the permit and approvals issued in connection to job# x00960303-i1. due to suspension of the master plumber's license #2286. all plumbing work in connection with this application has been ordered stopped immediately.
Jul 10, 2024
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Jun 14, 2026 · Apt 1
Close - Water leak
Heavy flow
Jun 14, 2026 · Apt 1
Close - Plumbing
Basin/sink
Jun 14, 2026 · Apt 1
Close - Heat/hot water
Entire building
May 16, 2026 · Apt 2
Close - Electric
Power outage
May 16, 2026 · Apt 2
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt 4
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 5
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 2
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 9, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 6
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt 2
Close - Plumbing
Water supply
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 21STFL
Close - Door/window
Window frame
Jan 17, 2026 · Apt 2
Close - Unsanitary condition
Mold
Jan 17, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 5
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 5
Close - Unsanitary condition
Mold
Jan 17, 2026 · Apt 5
Close - Unsanitary condition
Pests
Jan 17, 2026 · Apt 5
Close - Plumbing
Steam pipe/riser
Jan 17, 2026 · Apt 5
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 17, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 4
Close - Paint/plaster
Wall
Dec 26, 2025 · Apt 3
Close - Unsanitary condition
Mold
Dec 26, 2025 · Apt 3
Close - Plumbing
Water supply
Dec 26, 2025 · Apt 3
Close - Water leak
Slow leak
Dec 26, 2025 · Apt 3
Close - Plumbing
Water supply
Dec 25, 2025 · Apt 3
Close - Plumbing
Water supply
Nov 24, 2025 · Apt 3
Close - Plumbing
Bathtub/shower
Nov 24, 2025 · Apt 3
Close - Unsanitary condition
Pests
Nov 24, 2025 · Apt 3
Close - Unsanitary condition
Mold
Nov 24, 2025 · Apt 3
Close - Plumbing
Water supply
Aug 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Plumbing
Water supply
Feb 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 22, 2025 · Apt 2
Close - Water leak
Slow leak
Jan 22, 2025 · Apt 2
Close - Water leak
Slow leak
Jan 21, 2025 · Apt 2
Close - Water leak
Heavy flow
Jan 20, 2025 · Apt 2
Close - Water leak
Heavy flow
Jan 20, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Jan 20, 2025 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,850 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5A
- Community board
- 212
- Council district
- 11
- Block / lot
- 5040 / 39
- Assessed value
- $353,700
- Landmark / historic district
- No
HPD registration #201374, last renewed Oct 3, 2024.
Questions about 4381 Matilda Avenue
Who owns 4381 Matilda Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Doyley Headley.
Does 4381 Matilda Avenue have violations?
Yes. NYC HPD has recorded 192 housing violations at this property.
Is 4381 Matilda Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4381 Matilda Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 4381 Matilda Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.