4225 Grace Avenue
Bronx, NY 10466BBL 2-05017-0030Map
Owner of record: Mala Khan INC
4225 Grace Avenue is a two-family home built in 1925 in Bronx, 10466. It has 2 residential units across 2 floors. The owner of record is Mala Khan INC. HPD has recorded 18 housing violations here, most recently on July 11, 2025. 16 of the 18 most recent violations are still open.
- HPD violations
- 18
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 46
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- ANon-hazardous
Cleanse to the satisfaction of this department the mold on ceramic wall tiles at the south wall and the east wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jul 11, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin and bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2025 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 1, 1st story, 1st apartment from east at south
Jun 20, 2025 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
May 21, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin and bathtub in the bathroom located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 1st private hallway from east located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 6th room from east located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation
Show 8 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of hot water temperature of 155 f exceeding maximum allowable temperature limit of 130 f at all plumbing fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit entrance door at north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department don't approve, need to change it to 856 1st door from west at north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Refit exit door at west wall in the 1st private hallway from east located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway from east located at apt 1, 1st story, 1st apartment from east at south
May 19, 2025 · Apt 1
Open — First no access to re- inspect violation
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Door
Apr 13, 2026 · Apt 1A
Close - Safety
Fire escape
Apr 13, 2026 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Apr 13, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt 1A
Close - Door/window
Window frame
Apr 13, 2026 · Apt 1A
Close - Safety
Fire escape
Apr 13, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt 1A
Close - Plumbing
Basin/sink
Jan 18, 2026 · Apt 1FLOOR
Close - Paint/plaster
Wall
Jan 18, 2026 · Apt 1FLOOR
Close - Unsanitary condition
Mold
Jan 18, 2026 · Apt 1FLOOR
Close
Show 36 more ↓
- Safety
Fire escape
Jan 18, 2026 · Apt 1FLOOR
Close - Electric
Power outage
Jul 28, 2025 · Apt 1A
Close - Electric
Power outage
Jul 10, 2025 · Apt 1A
Close - Unsanitary condition
Mold
Jul 4, 2025 · Apt 1
Close - Unsanitary condition
Pests
Jun 15, 2025 · Apt 1
Close - Paint/plaster
Wall
Jun 15, 2025 · Apt 1
Close - Flooring/stairs
Floor
Jun 15, 2025 · Apt 1
Close - Unsanitary condition
Pests
Jun 15, 2025 · Apt 1
Close - Plumbing
Water supply
Jun 15, 2025 · Apt 1
Close - Heat/hot water
Entire building
Jun 15, 2025 · Apt 1
Close - Appliance
Electric/gas range
Jun 15, 2025 · Apt 1
Close - Safety
Window guard broken/missing
Jun 15, 2025 · Apt 1
Close - Safety
Sprinkler
Jun 15, 2025 · Apt 1
Close - General
Bell/buzzer/intercom
Jun 15, 2025 · Apt 1
Close - Heat/hot water
Entire building
Jun 15, 2025 · Apt 12THEB
Close - Plumbing
Steam pipe/riser
Jun 15, 2025 · Apt 12THEB
Close - Door/window
Door
Jun 15, 2025 · Apt 12THEB
Close - Plumbing
Water supply
Jun 12, 2025 · Apt 1
Close - Plumbing
Radiator
Jun 12, 2025 · Apt 1
Close - Safety
Window guard broken/missing
Jun 12, 2025 · Apt 1
Close - Door/window
Window frame
Jun 12, 2025 · Apt 1
Close - Door/window
Door
Jun 12, 2025 · Apt 1
Close - Door/window
Door
Jun 12, 2025 · Apt 1
Close - Paint/plaster
Wall
Jun 12, 2025 · Apt 1
Close - Plumbing
Water supply
Jun 9, 2025 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Jun 6, 2025 · Apt 1
Close - Door/window
Door
Jun 6, 2025 · Apt 1
Close - Plumbing
Water supply
Jun 6, 2025 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Jun 4, 2025 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Jun 4, 2025 · Apt 1STFLO
Close - Safety
Window guard broken/missing
May 15, 2025 · Apt 1
Close - Plumbing
Water supply
May 15, 2025 · Apt 1
Close - Door/window
Door
May 15, 2025 · Apt 1
Close - Plumbing
Basin/sink
May 15, 2025 · Apt 1
Close - Door/window
Door
May 15, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 2,124 ft²
- Lot area
- 2,375 ft²
- Zoning
- R4A
- Community board
- 212
- Council district
- 12
- Block / lot
- 5017 / 30
- Assessed value
- $54,840
- Landmark / historic district
- No
HPD registration #716052, last renewed Aug 14, 2025.
Questions about 4225 Grace Avenue
Who owns 4225 Grace Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mala Khan INC.
Does 4225 Grace Avenue have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 4225 Grace Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4225 Grace Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 4225 Grace Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.