1591 East 233 Street
Bronx, NY 10466BBL 2-04971-0001Map
Owner of record: Superior 233rd LLC
1591 East 233 Street is a hotel built in 1948 in Bronx, 10466. The owner of record is Superior 233rd LLC. HPD has recorded 2 housing violations here, most recently on April 30, 2026.
- HPD violations
- 2
- DOB violations
- 17
- ECB violations
- 18
- HPD complaints
- 12
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom, 1st story
Feb 17, 2026
Closed — Violation closed
DOB building violations · 17
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
Show 7 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 27, 1993
Vpw*-violation unserved ecb-work without permit-dismissed
ECB violations · 18
- Class - 1
Class 1 c/u: firefighters' service phase ii - door close function inoperative, as per asme a17.1 2.27.3.3.6. remedy: repair door close function and restore proper phase ii operation. email elevator division at
Oct 6, 2026 · Penalty $1,250
Active - Class - 2
At the time of inspection observed pvc being used on the water heaters fresh air intake piping this is contrary to 503.4.1, repair and/or replace
Oct 6, 2026 · Penalty $1,250
Active - Class - 2
Observed in basement domestic water line tied into dedicated fire line. also lack support on waste line which is contrary to code sections pc 102.3 and provision of law bc 903 and nfpa 13 section 23.1.1 2007 ed
Nov 18, 2025 · Penalty $625
Resolve - Class - 2
Class 2 items: category 5 test tag missing. provide access to pit area via hoistway door. provide an updated maintenance log. provide a maintenance control program.
Oct 28, 2025 · Penalty $312
Resolve - Class - 2
Failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service.
Oct 28, 2025
Resolve - Class - 2
Restore to service; elevator out of service on top floor, repair phone in eelvator; provide fire extinguisher in motor room
May 3, 2023 · Penalty $1,562
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at the time of inspection of 2 story type-2 alteration jobsite i noted bolt on records and at of fence psino to provide means & method of providing
Jul 28, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to provide safety equipment or inform workers of danger affected by construction operations-failure to provide fall protection.at time of inspection on an active 2 story alt construction site notice two
Jul 8, 2021 · Penalty $2,500
Resolve - Class - 1
3314.4.8 failure to maintain pipe scaffold onsite as per code.at time of inspection on an active 2 story alt construction site noticed workers on pipe scaffold that was not maintained as per code.few of the pip
Jul 8, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/display onsite documents.at time of inspection on an active 2 story construction site,noticed workers onsite when request was made for the the approx construction drawings for the site all t
Jul 8, 2021 · Penalty $1,250
Resolve
Show 8 more ↓
- Class - 1
Failure to communicate required information to workers during pre-shift safety meetings.at time of inspection on an active 2 story alt construction site when request was made for the pre-shift safety meetings f
Jul 8, 2021 · Penalty $5,000
Resolve - Class - 1
Bc 3301.5 unsafe condition(structural steel on secrued)upon inspectionof 2nd floor steel beam it was observed the steel beam was not securedin its final resting place and beam pocket of a masonry column.the bea
Jan 19, 2021 · Penalty $2,500
Resolve - Class - 2
Superintendent failed to perform duties.upon inspection the registeredconstruction superintendent(tejpal sandhu)was not onsite and the following violating safety conditions were observed:(1).a main structural s
Jan 19, 2021 · Penalty $625
Resolve - Class - 1
Workcontrary to approved plans(demolished wall)upon inspection the re ar wall of masonry/cmu block at exposure#3 was substantially demolished.approximately 40% of the wall remained or about 11ft 6high.this demo
Jan 19, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain required onsite documents(g-joist plan)upon inspection cold form steel c-joists were installed on the 1st and 2nd floor of a 2 story commercial alteration building.however upon request no de
Jan 19, 2021 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection(sidewalk shed)does not meet code specifications.upon inspection,the sidewalk shed at exposure#1(east 233rd st)did not fully cover the sidewalk to the curb(+/-18")the pedestrian sidewalk in
Jan 19, 2021 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39018886r issued on 03/04/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102.01. for work w/o a permit. remedy: comply w/comm's orde
Sep 4, 2020 · Penalty $2,500
Resolve - Class - 1
Work without a permit. at time of inspection noted five men doing interior demolition work. job number 210180597 disapproved on 01/31/2020. no active permits on file. a full stop work order issued, the work is
Mar 4, 2020 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Feb 15, 2026 · Apt 3060
Close - Electric
Power outage
May 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2023 · Apt BLDG
Close
Show 2 more ↓
- Heat/hot water
Entire building
Feb 20, 2023 · Apt BLDG
Close - Electric
No lighting
Nov 20, 2019 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Nov 12, 2025 | Non-market transfer | Other hotels | 1 |
Building details
- Building type
- Hotel (HR)
- Year built
- 1948
- Floors
- 2
- Residential units
- —
- Building area
- 35,539 ft²
- Lot area
- 27,650 ft²
- Zoning
- M1-1
- Community board
- 212
- Council district
- 12
- Block / lot
- 4971 / 1
- Assessed value
- $3,213,000
- Landmark / historic district
- No
Questions about 1591 East 233 Street
Who owns 1591 East 233 Street?
The owner of record in NYC Department of City Planning PLUTO data is Superior 233rd LLC.
Does 1591 East 233 Street have violations?
Yes. NYC HPD has recorded 2 housing violations at this property.
Is 1591 East 233 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1591 East 233 Street built?
City records list 1948 as the year it was built.