roofy

1313 East 222 Street

Bronx, NY 10469BBL 2-04888-0009Map

Owner of record: Smr 222 LLC

1313 East 222 Street is a religious facility built in 1950 in Bronx, 10469. The owner of record is Smr 222 LLC. HPD has recorded 73 housing violations here, most recently on October 9, 2026. 28 of the 50 most recent violations are still open.

HPD violations
73
DOB violations
15
ECB violations
1
HPD complaints
97

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 73

  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 8; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures creating a hazard. in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2f, 2nd story, 1st apartment from south at west

    Oct 9, 2026 · Apt 2F

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Sep 2, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Sep 2, 2026 · Apt 2R

    Open — Civ14 mailed
  • A

    Cleanse to the satisfaction of this department the mold on grout at ceramic tiles at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west

    Sep 2, 2026 · Apt 2R

    Open — Civ14 mailed
Show 40 more ↓
  • C

    Properly repair or replace the broken or defective mortise lock on building entrance door at public hall, 1st story

    Sep 2, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    Jul 23, 2026 · Apt 2R

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from south at west wall in the 3rd room from north located at apt 2r, 2nd story, 2nd apartment from south at west

    Jul 23, 2026 · Apt 2R

    Open — Defect letter issued
  • A

    Paint metal in accordance with dept. regulation the in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    Jul 23, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north located at apt 2r, 2nd story, 2nd apartment from south at west

    Jul 23, 2026 · Apt 2R

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from west at north wall in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    Jul 23, 2026 · Apt 2R

    Open — Defect letter issued
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from south at west

    Jul 23, 2026 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at north

    Jul 23, 2026 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective defective locks at mailboxes in vestibule for apt 2r at public hall, 1st story

    Jun 10, 2026

    Closed — Violation closed
  • A

    Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations. at public hall, 1st story

    Jun 10, 2026

    Open — Not complied with
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from west at north wall in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    May 25, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    May 25, 2026 · Apt 2R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from south at west wall in the 3rd room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    May 25, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west

    May 25, 2026 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at north wall, 1st door frame from north at east wall, west wall in the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    May 25, 2026 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at upper window sash in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west

    May 19, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west

    May 19, 2026 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective missing lock at apartment 2r mailbox at south exterior wall (building front)

    May 19, 2026

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from south at west wall in the 1st room from north located at apt 2r, 2nd story, 1st apartment from south at west

    May 8, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st radiator from west at north wall in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from south at west

    May 8, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the 1st room from north at west located at apt 2r, 2nd story, 1st apartment from south at west

    May 8, 2026 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west, the 1st room from north at west, the 3rd room from north located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 1, 2026 · Apt 2R

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west

    Apr 1, 2026 · Apt 2R

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, apartment at west

    Feb 1, 2026 · Apt 2F

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked, at boiler room

    Feb 1, 2026

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in waste line at bathtub, in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 26, 2025 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste line at sink, in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west

    Dec 26, 2025 · Apt 2F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door

    Dec 26, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance

    Dec 26, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west, the 1st room from north at west located at apt 2r, 2nd story, 2nd apartment from south at west

    Dec 3, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the foyer located at apt 2r, 2nd story, 2nd apartment from south at west

    Dec 3, 2023 · Apt 2R

    Open — Defect letter issued
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 2nd apartment from south at west

    Dec 3, 2023 · Apt 2R

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door ( metal gate ) located at building entrance.

    Dec 7, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 4, 2015

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from west at north

    Jul 21, 2010 · Apt 2R

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jul 21, 2010 · Apt 2R

    Open — Nov sent out

DOB building violations · 15

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
Show 5 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - active

ECB violations · 1

  • Class - 2

    Failure to maintain building walls or appurtenances.at the time of inspection the violating conditions are as follows:at exposurse #2 towards the rear at the poperty line retaining wall bounding (sail)at 1511

    Sep 29, 2017 · Penalty $500

    Active

Complaints

  • Heat/hot water

    Apartment only

    Oct 23, 2026 · Apt 2F

    Open
  • Unsanitary condition

    Pests

    Oct 5, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 5, 2026 · Apt 2F

    Close
  • Safety

    Window guard broken/missing

    Oct 5, 2026 · Apt 2F

    Close
  • Plumbing

    Radiator

    Oct 5, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 2R

    Close
  • Plumbing

    Water supply

    Sep 1, 2026 · Apt 2R

    Close
  • Door/window

    Door

    Sep 1, 2026 · Apt 2R

    Close
  • General

    Mailbox

    Sep 1, 2026 · Apt 2R

    Close
Show 40 more ↓
  • Door/window

    Door

    Aug 31, 2026 · Apt 2R

    Open
  • General

    Mailbox

    Aug 31, 2026 · Apt 2R

    Open
  • Unsanitary condition

    Mold

    Aug 28, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Aug 28, 2026 · Apt 2R

    Close
  • Plumbing

    Water supply

    Aug 28, 2026 · Apt 2R

    Close
  • Door/window

    Door

    Aug 28, 2026 · Apt 2R

    Close
  • General

    Mailbox

    Aug 28, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jul 31, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2026 · Apt 2F

    Close
  • Plumbing

    Radiator

    Jul 31, 2026 · Apt 2F

    Close
  • Safety

    Window guard broken/missing

    Jul 31, 2026 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Jul 9, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jul 9, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2026 · Apt 2R

    Close
  • Plumbing

    Water supply

    Jul 9, 2026 · Apt 2R

    Close
  • Safety

    Window guard broken/missing

    Jun 26, 2026 · Apt 2F

    Close
  • Door/window

    Window frame

    Jun 26, 2026 · Apt 2F

    Close
  • Plumbing

    Radiator

    Jun 26, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Jun 26, 2026 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jun 26, 2026 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jun 18, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jun 18, 2026 · Apt 2R

    Close
  • General

    Mailbox

    Jun 8, 2026 · Apt 2R

    Close
  • Door/window

    Door

    May 11, 2026 · Apt 2R

    Close
  • Plumbing

    Radiator

    May 11, 2026 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    May 11, 2026 · Apt 2R

    Close
  • Appliance

    Refrigerator

    May 11, 2026 · Apt 2R

    Close
  • Plumbing

    Radiator

    May 11, 2026 · Apt 2R

    Close
  • Door/window

    Window frame

    May 11, 2026 · Apt 2R

    Close
  • General

    Mailbox

    May 11, 2026 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    May 11, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    May 11, 2026 · Apt 2R

    Close
  • Paint/plaster

    Radiator

    May 1, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Mar 23, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Mar 23, 2026 · Apt 2R

    Close
  • Plumbing

    Radiator

    Mar 18, 2026 · Apt 2F

    Close
  • Safety

    Window guard broken/missing

    Mar 18, 2026 · Apt 2F

    Close
  • Safety

    Window guard broken/missing

    Mar 6, 2026 · Apt 2F

    Close
  • Plumbing

    Radiator

    Mar 6, 2026 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2026 · Apt 2F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Religious facility (M1)
Year built
1950
Floors
2
Residential units
—
Building area
3,750 ft²
Lot area
5,000 ft²
Zoning
R5
Community board
212
Council district
12
Block / lot
4888 / 9
Assessed value
$347,850
Landmark / historic district
No

HPD registration #221938, last renewed Oct 16, 2025.

Questions about 1313 East 222 Street

Who owns 1313 East 222 Street?

The owner of record in NYC Department of City Planning PLUTO data is Smr 222 LLC.

Does 1313 East 222 Street have violations?

Yes. NYC HPD has recorded 73 housing violations at this property.

Is 1313 East 222 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1313 East 222 Street built?

City records list 1950 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.