3401 Bruner Avenue
Bronx, NY 10469BBL 2-04883-0132Map
Owner of record: Sudhakaran, Shaji
3401 Bruner Avenue is a two-family home built in 2004 in Bronx, 10469. It has 2 residential units across 2 floors. The owner of record is Sudhakaran, Shaji. HPD has recorded 44 housing violations here, most recently on April 11, 2026. 41 of the 44 most recent violations are still open.
- HPD violations
- 44
- DOB violations
- 4
- ECB violations
- 16
- HPD complaints
- 91
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- ANon-hazardous
Repair the broken or defective rain leader at east exterior wall at public hall, 1st story
Apr 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracks/ missing (cement flashing) at east exterior wall (building front)
Jan 19, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective horizantal cracks (cement) at public stairs (from bottom thread to 1st story landing) building front area
Jan 19, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Jan 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Jan 16, 2026 · Apt 2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage bags and micellaneouse items at buiding front
Jan 16, 2026
Open — Nov sent out - ANon-hazardous
Provide a gutter, properly connected to drainage system, for proper drainage at south exterior wall
Oct 24, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective casement window glass pane at right sash in the 3rd room from east located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Open — Nov sent out
Show 34 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft st all walls and ceiling in the bathroom located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair or replace the broken or defective upper window sash counter balance at south wall in the 4th room from east located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east located at apt b, 2nd story, 2nd apartment from east at south
Oct 24, 2025 · Apt B
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 23, 2025
Open — Info nov sent out - BHazardous
Properly repair with similar material the broken or defective vertical crack and cracked concrete flashing at lower stairway support wall at east wall at
Oct 21, 2025
Open — Nov sent out - CImmediately hazardous
Properly secure the loose 12th concrete tread up from bottom at 1st story landing at front entrance staircase at public hall
Oct 21, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats
Apr 6, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 29, 2022
Open — Info nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 2nd story, 2nd apartment from east at south
Mar 28, 2022 · Apt 1B
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 2nd story, 2nd apartment from east at south
Mar 28, 2022 · Apt 1B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin in the 1st bathroom from north at west located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin sink in the 1st bathroom from north at west located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair the broken or defective casement window crank handle in the 2nd room from north at west located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper and lower window sash spring balance in the entire apartment located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and walls in the private hallway located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and walls in the 3rd bathroom from north at west located at apt b, 2nd story, 2nd apartment from south at west
Mar 30, 2017 · Apt B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Refit at all upper and lower sash windows in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all ceilings in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at all ceilings in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of looose trash and debris at intermediate landing ..building front yard
Jun 24, 2016
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of loose trash and debris at building front yard
Jun 24, 2016
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 2nd room from east at south located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the 1st bathroom from north at west located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the 1st bathroom from north at west located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 24, 2016 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 18, 2016 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall by the window in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
May 18, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlets at north wall in the kitchen located at apt 2, 2nd story, apartment at east
May 18, 2016 · Apt 2
Open — Nov sent out
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2011
Dob violation - dismissed - Plumbing none
P-plumbing none
Jul 28, 2007
Dob violation - active
ECB violations · 16
- Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34851139l issued on 6/28/10 pursuant to 28-204.4 & 1rcny 102.01. remedy: file a c of c.
Nov 18, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34851139l issued on 6.28.10. note: horizontal & vertical cracks throughout stairs. no permits or c/c. remedy: comply w/the commissioner's order.
Jul 28, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner.@ front of premises masonry stair and retaining wall cracked/bulging with evidence of water penetration @ rear yard masonry stairs cracked with evidence of wa
May 13, 2011 · Penalty $250
Active - Class - 1
Failure to maintain bldg in code compliant manner.noted:@ front yard,masonry stairs & retaining wall in disreapir w/cracks,displaced cmu,& signs of water penetration throughout-rear yard masonry stairs in simil
Mar 15, 2011 · Penalty $2,500
Active - Class - 2
Failure to maintain building in a code-compliant manner.noted:at front yard masonry stair and retaining/support walls cracked in various locatons with evidence of water penetration at rear yard masonry.retainin
Jan 4, 2011 · Penalty $1,250
Active - Class - 1
Unlawful act(s) failure to comply with an order of the comm.respondentfailed to correct the conditions cited in nov#34851139l.masonry stair structure at front yard cracked at various locations.no certificate
Jan 4, 2011 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in code compliant manner noted stair structure constructed from cmu is appx 25'high has multiple horizontal & vertical cracks w/ appx 1/8" displacement at top landing stair structure is
Jun 28, 2010 · Penalty $5,000
Active - Class - 2
Nb occupied w/ expd tco # 200762807 expd 9/20/07 remedy:obtain valid cofo
Jun 9, 2009
Resolve - Class - 1
New bldg is occupied w/o a valid c of o which exp on 9/20/07 new bldg number 200762807 remedy: obtain a valid c of o
Nov 18, 2008 · Penalty $5,000
Active - Non-hazardous
Failure to maintain- rear concrete retaining wall is cracked & leaningremedy: immediately repair defect, obtain permits.
Jun 19, 2007 · Penalty $2,500
Active
Show 6 more ↓
- Non-hazardous
New bldg 200762807 is occupied w/o a valid certificate of occupancy which expired 8/8/06.remedy:obtain a valid c of o.
Mar 26, 2007 · Penalty $2,500
Active - Non-hazardous
New bldg occupied w/o a valid c of o.co#20076280t002 expired august 8,2006. remedy:discontinue illegal use.
Dec 18, 2006 · Penalty $2,500
Active - Hazardous
New building occupied w/out a valid c of o. temp c of o #200762807t001expired 11-13-05. remedy: obtain a valid c of o.
Apr 18, 2006
Resolve - Hazardous
Failure to perform adequate housekeeping. work noted: site strewn with 2 x 4' s of various lengths with nails protruding as well as other types of wood, masonry & refuse making for a hazardous work place
Mar 2, 2005 · Penalty $350
Resolve - Hazardous
Job site fence defective:jobsite fence is not properly anchored and leaning severely out of plumb. toward public sidewalk. chain link fence buckled and displaced at various locations. remedy: repair and or repl
Mar 2, 2005 · Penalty $500
Resolve - Hazardous
Failure to safeguard public and property affected by construction operations.site is accessible to public. various dangers such as fence leaning,debris and drops in elevation. sections of fence open. remedy:sec
Mar 2, 2005 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 16, 2026 · Apt BLDG
Open - Plumbing
Toilet
Oct 14, 2026 · Apt 1
Open - Plumbing
Basin/sink
Oct 14, 2026 · Apt 1
Open - Door/window
Window pane
Oct 14, 2026 · Apt 1
Open - Unsanitary condition
Garbage/recycling storage
Sep 29, 2026 · Apt BLDG
Open - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 2
Close - Electric
Power outage
Jan 16, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Jan 16, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Oct 23, 2025 · Apt B
Close
Show 40 more ↓
- Door/window
Window frame
Oct 23, 2025 · Apt B
Close - Appliance
Electric/gas range
Oct 23, 2025 · Apt B
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt B
Close - Door/window
Window frame
Oct 23, 2025 · Apt B
Close - Paint/plaster
Ceiling
Oct 20, 2025 · Apt B
Close - Appliance
Electric/gas range
Oct 20, 2025 · Apt B
Close - Heat/hot water
Apartment only
Oct 20, 2025 · Apt B
Close - Paint/plaster
Ceiling
Oct 20, 2025 · Apt B
Close - Door/window
Window frame
Sep 16, 2025 · Apt 1FLOOR
Close - Appliance
Electric/gas range
Sep 16, 2025 · Apt 1
Close - Door/window
Window pane
Sep 16, 2025 · Apt 1
Close - Plumbing
Toilet
Apr 27, 2023 · Apt 1
Close - Door/window
Window frame
Apr 27, 2023 · Apt 1
Close - Appliance
Electric/gas range
Mar 4, 2023 · Apt 1
Close - Plumbing
Basin/sink
Mar 4, 2023 · Apt 1
Close - Plumbing
Toilet
Mar 4, 2023 · Apt 1
Close - Door/window
Window pane
Mar 4, 2023 · Apt 1
Close - Appliance
Electric/gas range
Mar 4, 2023 · Apt 1
Close - Plumbing
Toilet
Mar 4, 2023 · Apt 1
Close - Plumbing
Basin/sink
Mar 4, 2023 · Apt 1
Close - Door/window
Window pane
Mar 4, 2023 · Apt 1
Close - Plumbing
Toilet
Oct 8, 2022 · Apt 1B
Close - Appliance
Electric/gas range
Oct 8, 2022 · Apt 1B
Close - Appliance
Electric/gas range
Oct 1, 2022 · Apt 1B
Close - Plumbing
Toilet
Oct 1, 2022 · Apt 1B
Close - Plumbing
Basin/sink
May 29, 2022 · Apt 1B
Close - Plumbing
Water supply
May 29, 2022 · Apt 1A
Close - Unsanitary condition
Pests
Mar 27, 2022 · Apt 1B
Close - Appliance
Electric/gas range
Mar 27, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 27, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 25, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 23, 2022 · Apt 1B
Close - General
Cooking gas
Mar 23, 2022 · Apt 1B
Close - Plumbing
Toilet
Jan 7, 2022 · Apt 1B
Close - General
Cooking gas
Jan 7, 2022 · Apt 1B
Close - Plumbing
Basin/sink
Jan 7, 2022 · Apt 1B
Close - Plumbing
Toilet
Nov 8, 2021 · Apt 1B
Close - Appliance
Electric/gas range
Nov 8, 2021 · Apt 1B
Close - Appliance
Electric/gas range
Aug 28, 2021 · Apt APT1B
Close - Heat/hot water
Apartment only
Aug 28, 2021 · Apt APT1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 2004
- Floors
- 2
- Residential units
- 2
- Building area
- 2,556 ft²
- Lot area
- 3,285 ft²
- Zoning
- R4
- Community board
- 212
- Council district
- 12
- Block / lot
- 4883 / 132
- Assessed value
- $49,380
- Landmark / historic district
- No
Questions about 3401 Bruner Avenue
Who owns 3401 Bruner Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Sudhakaran, Shaji.
Does 3401 Bruner Avenue have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is 3401 Bruner Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3401 Bruner Avenue built?
City records list 2004 as the year it was built.
How many apartments are in 3401 Bruner Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.