roofy

Violations at 3403 Bruner Avenue

Bronx, NY 10469 · BBL 2-04883-0131 · Back to the property

HPD housing violations

26 HPD violations, newest first.

  • BHazardous

    Abate the infestation consisting of roaches located at apt 2, 2nd story

    Dec 12, 2025 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Trace and repair the source and abate the visible mold condition... approx. 3 sq ft at ceiling. in the 1st bathroom from east at south located at apt 1, 1st story, 2nd apartment from south at west original violation 15207261 issued 16-jun-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 16, 2022 · Apt 1

    Open — First no access to re- inspect violation
  • BHazardous

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 4th room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling. in the 4th room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the missing outlet cover at south wall. in the 3rd room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at south, east walls and ceiling. in the 3rd room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at west and north wall. in the 3rd room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective hinge at north wall cabinet in the kitchen located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective marble saddle at entrance in the kitchen located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling. in the 1st bathroom from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... approx. 3 sq ft at ceiling. in the 1st bathroom from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from east at north located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective grout at east wall in the 1st bathroom from east at north located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling. in the 1st bathroom from east at north located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the missing crank arm at north 2 casement window in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Refit entrance door in the 3rd room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... approx 8 sq ft at ceiling approx 3 sq ft at east wall in the 1st bathroom from east at north located at apt 1, 1st story, 2nd apartment from south at west

    Jun 16, 2022 · Apt 1

    Open — First no access to re- inspect violation
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 30, 2018

    Closed — Violation dismissed
  • BHazardous

    Replace with new the broken or defective sink base counter top in the kitchen located at apt 1, 1st story

    Feb 13, 2018 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective wall base cabinets in the kitchen located at apt 1, 1st story

    Feb 13, 2018 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective crank handle at casement window in the 1st room from north located at apt 1, 1st story

    Feb 13, 2018 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the roof so that it will not leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Mar 17, 2009 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Mar 17, 2009 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story

    Mar 24, 2008 · Apt 1

    Open — Nov sent out

DOB building violations

5 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 15, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 6, 2011

    Dob violation - active
  • Plumbing none

    P-plumbing none

    Jul 28, 2007

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Aug 16, 2005

    Dob violation - active

ECB violations

11 ECB violations, newest first.

  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34851138j issued on 6/28/10 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Nov 18, 2011 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in nov #34851139l issued on 6.28.10. note: horizontal & vertical cracks throughout stairs no permits or c/c.

    Jul 28, 2011 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to maintain bldg in a code-compliant manner @ front of premises.masonry retaining wall & stairs cracked/bulging various locations throughout.provide structural stability report from p.e. for retaining w

    May 13, 2011 · Penalty $5,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner noted:@ front yard masonry stairs and 20'high masonry reatining wall in disreapir with cracks, displaced cmu & signs of water penetration throughout rear yard s

    Mar 15, 2011 · Penalty $25,000

    Active
  • Class - 1

    Unlawful act(s)failure to comply w/an order of the comm.respondent failed to correct the conditions cited in nov#34851138j.failure to maintain masonry stair and retaining wall at front yard.rem:comply with comm

    Jan 4, 2011 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to maintain building in a code-compliant manner.noted:at frontyard masonry stair structure cracked w/evidence of water penetration various locations throughout.(stair structure acts as a retaining wall

    Jan 4, 2011 · Penalty $10,000

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner noted front stairs constructed from cmu has three runs of step totaling 6,10 & 11 support structure has vertical and horizontal cracking upper landing outside c

    Jun 28, 2010 · Penalty $5,000

    Active
  • Class - 2

    Nb occupied w/ expd tco # 200762816 expd 9/20/07 remedy:obtain valid cofo

    Jun 9, 2009 · Penalty $2,500

    Active
  • Class - 1

    New bldg 200762816 is occupied w/o a valid c of o which exp 9/20/07 remedy: obtain a valid c of o

    Nov 19, 2008 · Penalty $5,000

    Active
  • Non-hazardous

    New bldg 2007-62816 is occupied w/o a valid certificate of occupancy which expired 8/8/06.remedy:obtain a valid c of o.

    Mar 30, 2007 · Penalty $2,500

    Active
  • Non-hazardous

    New bldg. occupied w/o a valid c of o. temp c of o# 200762816t001 exp 11-13-05. remedy: obtain a valid c of o.

    Apr 11, 2006

    Resolve