roofy

824 East 232 Street

Bronx, NY 10466BBL 2-04856-0063Map

Owner of record: 824 East 232 LLC

824 East 232 Street is a walk-up apartment building built in 1930 in Bronx, 10466. It has 5 residential units across 2 floors. The owner of record is 824 East 232 LLC. HPD has recorded 236 housing violations here, most recently on July 29, 2026. 6 of the 50 most recent violations are still open.

HPD violations
236
DOB violations
0
ECB violations
0
HPD complaints
105

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 236

  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall in the 3rd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window sash from east at south wall in the 2nd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall, north wall, west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Defect letter issued
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at boiler room

    Jul 22, 2026

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at boiler room

    Jul 22, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Jun 10, 2026

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing piece of rug and stopper at vestibule , 1st story

    Jun 10, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at building entrance door , 1st story

    Jun 10, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building vestibule , 1st story

    May 16, 2026

    Closed — Violation closed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building vestibule , 1st story

    May 16, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective lock and assembly at building vestibule door , 1st story

    May 16, 2026

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall, 1st window frame from west at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    May 1, 2026 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the 2nd room from north at east, the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from west at north

    May 1, 2026 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    May 1, 2026 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches at public hall, 1st story

    Apr 25, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 25, 2026 · Apt 2R

    Open — Violation will be reinspected
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Apr 25, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Apr 25, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 25, 2026 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Mar 31, 2026

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 2nd story

    Mar 31, 2026

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Mar 31, 2026 · Apt 2R

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at door from vestibule to 1st sty at public hall, 1st story

    Aug 8, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 8, 2025

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 2r, 2nd story, 1st apartment from south at west

    Aug 8, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 2r, 2nd story, 1st apartment from south at west

    Aug 8, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at the south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west original violation 17910783 issued 22-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at the ceiling at 1st public hall bulkhead from north, 2nd story

    May 22, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at the south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at 1st public hall bulkhead from north, 2nd story

    May 22, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east at north, the 2nd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 22, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective brick and mortar at west exterior wall at 2nd story

    Aug 15, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective brick and mortar at north facade from 1st story to parapet

    Aug 15, 2024

    Closed — Violation dismissed
  • B

    Properly secure the loose scuttle ladder at public hall, 2nd story

    Aug 15, 2024

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Apr 23, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Apr 3, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Mar 30, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jan 29, 2026 · Apt 2R

    Close
  • Door/window

    Door

    Jan 29, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jan 29, 2026 · Apt 2R

    Close
  • Electric

    Power outage

    Jul 13, 2025 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Jun 30, 2025 · Apt 1F

    Close
  • Door/window

    Door

    Jun 9, 2025 · Apt BASEME

    Close
  • Unsanitary condition

    Pests

    May 16, 2025 · Apt 2R

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    May 16, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    May 16, 2025 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Feb 4, 2025 · Apt 5BASEM

    Close
  • Paint/plaster

    Ceiling

    Feb 4, 2025 · Apt 5BASEM

    Close
  • Door/window

    Window frame

    Feb 4, 2025 · Apt 5BASEM

    Close
  • Door/window

    Door

    Feb 4, 2025 · Apt 5BASEM

    Close
  • Plumbing

    Basin/sink

    Feb 4, 2025 · Apt 5BASEM

    Close
  • Plumbing

    Basin/sink

    Feb 4, 2025 · Apt 5BASEM

    Close
  • Door/window

    Door

    Nov 13, 2024 · Apt 5

    Close
  • Flooring/stairs

    Floor

    Nov 13, 2024 · Apt 5

    Close
  • Paint/plaster

    Wall

    Nov 13, 2024 · Apt 5

    Close
  • Water leak

    Slow leak

    Nov 13, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Nov 13, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Nov 13, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Jul 11, 2024 · Apt 5

    Close
  • Plumbing

    Basin/sink

    Jul 11, 2024 · Apt 5

    Close
  • Water leak

    Slow leak

    Jul 11, 2024 · Apt 5

    Close
  • Plumbing

    Basin/sink

    Jul 11, 2024 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Jul 11, 2024 · Apt 5

    Close
  • Door/window

    Door

    Jul 11, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Jul 11, 2024 · Apt 5

    Close
  • Plumbing

    Basin/sink

    Jul 11, 2024 · Apt 5

    Close
  • Paint/plaster

    Ceiling

    Jul 11, 2024 · Apt 5

    Close
  • Plumbing

    Basin/sink

    Jul 11, 2024 · Apt 5

    Close
  • Outside building

    Roofing

    Jul 11, 2024 · Apt 5B

    Close
  • Water leak

    Slow leak

    Jul 11, 2024 · Apt 5

    Close
  • Door/window

    Door

    Jul 11, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Jul 11, 2024 · Apt 5

    Close
  • Water leak

    Slow leak

    Jun 10, 2024 · Apt 5

    Close
  • Paint/plaster

    Wall

    Jun 10, 2024 · Apt 5

    Close
  • Door/window

    Door

    Jun 10, 2024 · Apt 5

    Close
  • Flooring/stairs

    Floor

    Jun 10, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Jun 10, 2024 · Apt 5

    Close
  • Door/window

    Window frame

    Jun 10, 2024 · Apt 5

    Close
  • Plumbing

    Water supply

    Mar 6, 2024 · Apt 2F

    Close
  • Door/window

    Door

    Mar 6, 2024 · Apt NA

    Close
  • Safety

    Carbon monoxide detector

    Mar 6, 2024 · Apt 2R

    Close
  • Safety

    Smoke detector

    Mar 6, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 10, 2023 · Apt 5BASEM

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1930
Floors
2
Residential units
5
Building area
3,300 ft²
Lot area
2,867 ft²
Zoning
R4
Community board
212
Council district
11
Block / lot
4856 / 63
Assessed value
$295,200
Landmark / historic district
No

HPD registration #207638, last renewed Dec 24, 2025.

Questions about 824 East 232 Street

Who owns 824 East 232 Street?

The owner of record in NYC Department of City Planning PLUTO data is 824 East 232 LLC.

Does 824 East 232 Street have violations?

Yes. NYC HPD has recorded 236 housing violations at this property.

Is 824 East 232 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 824 East 232 Street built?

City records list 1930 as the year it was built.

How many apartments are in 824 East 232 Street?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.