2930 Grace Avenue
Bronx, NY 10469BBL 2-04797-0058Map
Owner of record: Reid, Londell E
2930 Grace Avenue is a walk-up apartment building built in 2002 in Bronx, 10469. It has 3 residential units across 3 floors. The owner of record is Reid, Londell E. HPD has recorded 57 housing violations here, most recently on May 7, 2026. 33 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 37
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash counter balance at north wall in the 2nd bathroom from north located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe at washbasin in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet at toilet in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at toilet in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective plywood at base of cabinet at sink in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and celing in the 2nd room from north located at apt 3, 3rd story, 1st apartment from west at north
Apr 29, 2025 · Apt 3
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Provide approved type mesh under the skylight at public hall, 3rd story
Mar 15, 2025
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective electrical wall outlet at the west wall in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective warped and deteriorated wood base at sink cabinet in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degress in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked and broken ceramic tiles at the south wall at bathtub in the 2nd bathroom from east located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the bathtub in the 2nd bathroom from east located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective the mixing valve at the shower body in the 2nd bathroom from east located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the 1st bathroom from east located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical wall outlet at the south wall in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance of the lower sash (guillotine effect) in the 1st bathroom from east located at apt 3, 3rd story, 1st apartment from west at north
Mar 15, 2025 · Apt 3
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame is missing at public hall, 1st story
Mar 15, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 15, 2025
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign is missing at public hall, 1st story
Mar 15, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign is missing at public hall, 1st story
Mar 15, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 15, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 15, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 15, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at lower base cabinet, (rotted) in the kitchen located at apt 3, 3rd story, 1st apartment from south at west
Aug 15, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3, 3rd story, 1st apartment from south at west
Aug 15, 2024 · Apt 3
Open — Nov sent out - BHazardous
Provide waterproof silicone caulk at wash basin (east wall) in the 1st bathroom located at apt 3, 3rd story, 1st apartment from south at west
Aug 15, 2024 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose medicine cabinet at east wall (loose) in the 1st bathroom located at apt 3, 3rd story, 1st apartment from south at west
Aug 15, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the at east wall and south wall (bathtub/shower) mildew in the 2nd bathroom located at apt 3, 3rd story, 1st apartment from south at west
Aug 15, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 3, 3rd story, 1st apartment from south at west
Aug 15, 2024 · Apt 3
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling. in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and west walls in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north, east walls and ceiling. in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - ANon-hazardous
Refit door at entrance in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jun 21, 2022
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door at entrance in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 2nd bathroom from north located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall. in the private hallway located at apt 3, 3rd story, 1st apartment from west at north
Jun 21, 2022 · Apt 3
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Jun 14, 2025 · Apt 1
Close - Electric
Wiring
Mar 29, 2025 · Apt 3
Close - Paint/plaster
Wall
Mar 13, 2025 · Apt 3
Close - Door/window
Window frame
Mar 13, 2025 · Apt 3
Close - Door/window
Window frame
Mar 13, 2025 · Apt 3
Close - Plumbing
Basin/sink
Mar 13, 2025 · Apt 3
Close - Paint/plaster
Wall
Mar 13, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Mar 13, 2025 · Apt 3
Close - Unsanitary condition
Mold
Mar 13, 2025 · Apt 3
Close - Plumbing
Toilet
Mar 13, 2025 · Apt 3
Close
Show 27 more ↓
- Plumbing
Toilet
Mar 13, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 3RDFLO
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 3
Close - Electric
Outlet/switch
Dec 23, 2024 · Apt 3
Close - Door/window
Window frame
Dec 23, 2024 · Apt 3
Close - Unsanitary condition
Mold
Dec 23, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Nov 23, 2024 · Apt 3
Close - General
Cabinet
Nov 23, 2024 · Apt 3
Close - Electric
Outlet/switch
Nov 23, 2024 · Apt 3
Close - Plumbing
Basin/sink
Jul 10, 2024 · Apt 3
Close - Plumbing
Basin/sink
Jul 10, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 3
Close - Unsanitary condition
Pests
Jan 17, 2024 · Apt 3
Close - Unsanitary condition
Pests
Jun 11, 2022 · Apt 3
Close - Paint/plaster
Wall
Jun 11, 2022 · Apt 3
Close - Paint/plaster
Wall
Jun 11, 2022 · Apt 3
Close - Heat/hot water
Apartment only
Nov 17, 2018 · Apt 1
Close - Unsanitary condition
Pests
May 8, 2014 · Apt 3
Close - Unsanitary condition
Pests
May 8, 2014 · Apt 3
Close - Unsanitary condition
Pests
Apr 25, 2014 · Apt 3
Close - Nonconst
Vermin
Nov 10, 2012 · Apt 3
Close - Heating
Heat related
Nov 18, 2008 · Apt 3
Close - Heating
Heat-plant
Nov 18, 2008 · Apt 3
Close - Nonconst
Odor
Jun 25, 2004 · Apt 3
Close - Plumbing
Sewer
Jun 25, 2004 · Apt 3
Close - Heating
Heat related
Jun 25, 2004 · Apt 3
Close - Nonconst
Vermin
Jun 25, 2004 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2002
- Floors
- 3
- Residential units
- 3
- Building area
- 2,924 ft²
- Lot area
- 2,896 ft²
- Zoning
- R4
- Community board
- 212
- Council district
- 12
- Block / lot
- 4797 / 58
- Assessed value
- $55,260
- Landmark / historic district
- No
HPD registration #223560, last renewed Sep 6, 2025.
Questions about 2930 Grace Avenue
Who owns 2930 Grace Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Reid, Londell E.
Does 2930 Grace Avenue have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 2930 Grace Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2930 Grace Avenue built?
City records list 2002 as the year it was built.
How many apartments are in 2930 Grace Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.