roofy

Violations at 3340 Eastchester Road

Bronx, NY 10469 · BBL 2-04744-0052 · Back to the property

HPD housing violations

26 HPD violations, newest first.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 24, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceding 130 degrees at fixtures in the bathroom and kitchen in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Nov 22, 2025 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective door bell in the entrance located at apt 2, 2nd story, 1st apartment from north at east

    Nov 22, 2025 · Apt 2

    Open — Nov sent out
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st private hallway from east, the 3rd room from north at west, the 1st room from north at west, the 2nd private hallway from east, the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock and stud wall with door erected from floor to ceiling obstructing natural light and ventilation in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall, 1st window frame from north at east wall, west wall, north wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the south wall, ceiling, 1st window frame from north at east wall, east wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Oct 25, 2024 · Apt 1

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    May 28, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 3rd room from north at west located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, west wall in the 1st room from north at east located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department east wall in the 3rd room from north at west located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Replace with new the missing electrical outlet cover at east wall in the kitchen located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective water supply pipe at sink in the kitchen located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood base cabinet in the kitchen located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective water supply pipe at wash basin in the bathroom located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Remove all obstructions from water closet bowl in the bathroom located at apt 1, 2nd story, 1st apartment from west at north

    May 22, 2024 · Apt 1

    Open — Nov sent out

DOB building violations

No DOB violations on record

ECB violations

No ECB violations on record