Violations at 3545 Tiemann Avenue
Bronx, NY 10469 · BBL 2-04728-0017 · Back to the property
HPD housing violations
28 HPD violations, newest first.
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st stair case baluster from east at south wall, south wall in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall, 2nd window frame from north at east wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective radiator in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective radiator in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective north 1 closet door hinges in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall, 1st window frame from east at south wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st stair case newel post from east at south wall in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the south wall in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Mar 5, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balances lower window sash in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Feb 9, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling installed in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Feb 9, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective entrance door lock in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Feb 9, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 9, 2024 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 9, 2024 · Apt 2
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 1st apartment from south at west
Sep 5, 2023 · Apt 2
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electric outlet at north wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 2nd apartment from east at south
Feb 26, 2015 · Apt 2
Closed — Violation dismissed
DOB building violations
2 DOB violations, newest first.
- Construction other optional
Work without permit noted at basement level erected various full height partitions to create bathroom and 2 additional rooms. installed additional electrical lines for lights, switches, and outlets. installed water and waste lines for 3 piece bathroom (toilet, sink, shower), and residential sink. installed gas line for stove.
Mar 29, 2022
Dob violation - active - Construction other optional
Residence altered; noted c of o #67812 indicates building as 2 family 2 story, basement as recreation room, boiler room, storage. building now has been altered to 3 family. alteration work noted at basement level, basement is now occupied as class a apartments with kitchen with gas stove, residential sink, 3 piece bathroom, 1 bedroom.
Mar 29, 2022
Dob violation - active
ECB violations
4 ECB violations, newest first.
- Class - 1
Work with out a permit. no electrical permit for basement area., for installation of additional electrical lines for lights, outlets and switches. hrp has been issued on 03/29/22 by badge#2908 for work without
Apr 24, 2024 · Penalty $1,250
Resolve - Class - 2
: residence altered; noted c of o #67812 indicates building as 2 family 2 story, basement as recreation room, boiler room, storage. building now has been altered to 3 family. alteration work noted at basement l
Apr 24, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to maintain. rear room is basement level, water damaged wall and mold on wall. hrp has been issued on 02/29/22 by badge#2908 for failure to maintain. action has not been corrected., repair and/or replac
Apr 24, 2024 · Penalty $655
Active - Non-hazardous
Work without a permit. partitation basement sub divided, kitchen,bath room and habitable space. extention porch in rear, fence approximately80'x6' high wiought iron driveway paved. remedy:obtain a permit if
Nov 9, 1992 · Penalty $350
Resolve