823 East 221 Street
Bronx, NY 10467BBL 2-04680-0026Map
Owner of record: 823 East 221 Street, LLC
823 East 221 Street is a walk-up apartment building built in 1928 in Bronx, 10467. It has 6 residential units across 3 floors. The owner of record is 823 East 221 Street, LLC. HPD has recorded 53 housing violations here, most recently on April 30, 2026. 1 of the 50 most recent violations are still open.
- HPD violations
- 53
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 202
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 53
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3f, 3rd story, 1st apartment from north at east
Jul 13, 2022 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1, 1st story, 1st apartment from west at north
Jul 13, 2022 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2r, 2nd story, 1st apartment from west at north
Jul 13, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2r, 2nd story, 1st apartment from west at north
Jul 13, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 2r, 2nd story, 1st apartment from west at north
Jul 13, 2022 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Jul 13, 2022 · Apt 2F
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches located at apt 2r, 2nd story, 1st apartment from west at north
Jul 13, 2022 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window casing in the 1st room from north located at apt 1r, 1st story, 1st apartment from west at north
Sep 5, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 2nd room from north located at apt 1r, 1st story, 1st apartment from west at north
Sep 5, 2021 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from north located at apt 1r, 1st story, 1st apartment from west at north
Sep 5, 2021 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak over window header in the 1st room from north located at apt 1r, 1st story, 1st apartment from west at north
Sep 5, 2021 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, 1st apartment from west at north
Sep 5, 2021 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 12, 2019 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 12, 2019 · Apt 1
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the 4th room from north located at apt 1, 1st story, 1st apartment from west at north
Jul 11, 2018 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires south wall in the 4th room from north located at apt 1, 1st story, 1st apartment from west at north
Jul 11, 2018 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from north located at apt 1, 1st story, 1st apartment from west at north
Jul 11, 2018 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Dec 30, 2017 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Dec 30, 2017 · Apt 2F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner installed in window to fire escape in the 1st room from north located at apt 2f, 2nd story, 1st apartment from north at east
Dec 30, 2017 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2f, 2nd story, 1st apartment from north at east
Dec 30, 2017 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 2f, 2nd story, 1st apartment from north at east
Dec 30, 2017 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective mailbox door for apartment # 2f , at public hall, 1st story
Jul 31, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Jul 31, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Jul 31, 2017
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at building entrance at public hall, 1st story
Jun 23, 2017
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of air conditioner at window leading to fire escape in the 4th room from north located at apt 2f, 2nd story, 1st apartment from north at east
Jun 23, 2017 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 2, 2016
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Feb 2, 2016 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Feb 2, 2016 · Apt 2F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at east and north walls ( approx. 12 sq. ft. ) in the bathroom located at apt 2f, 2nd story, apartment at east
Dec 9, 2015 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall , in the bathroom located at apt 2f, 2nd story, apartment at east
Dec 9, 2015 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall inside base cabinet in the kitchen located at apt 2f, 2nd story, apartment at east
Dec 9, 2015 · Apt 2F
Closed — Violation closed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof .. at public hall, 3rd story
Dec 9, 2015
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling , in the 1st room from north located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak penetrating thru window frame, in the 1st room from north located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric light switch at south wall , in the 1st room from north located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls , in the bathroom located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall( inside base cabinet) in the kitchen located at apt 2f, 2nd story, apartment at east
Jan 17, 2014 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric light fixture at ceiling in the private hallway located at apt 2r, 2nd story, 1st apartment from west at north
Mar 5, 2005 · Apt 2R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Dec 6, 2004 · Apt 2R
Open — Not complied with - BHazardous
Properly repair the broken or defective upper and lower window sashe counter balances in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north
Dec 6, 2004 · Apt 2R
Closed — Violation closed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Work w/o a permit. work noted: constructed partitions throughout cellar constructed a 3pc bthrm. constructed a partial kitchen. remedy: obtain a permit if feasible or restore back to prior legal condition.
Jan 31, 2008 · Penalty $250
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 1, 2026 · Apt 1R
Close - Electric
Wiring
Jan 17, 2022 · Apt 1R
Close - Door/window
Window frame
Sep 1, 2021 · Apt 1R
Close - Water leak
Heavy flow
Sep 1, 2021 · Apt 1R
Close - Heat/hot water
Entire building
Dec 22, 2020 · Apt 3F
Close - Heat/hot water
Entire building
Dec 21, 2019 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 10, 2019 · Apt 1
Close - Heat/hot water
Entire building
Nov 18, 2018 · Apt 1
Close - Door/window
Window frame
Aug 28, 2018 · Apt 2R
Close - Unsanitary condition
Mold
Aug 28, 2018 · Apt 2R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Aug 28, 2018 · Apt 2R
Close - Electric
No lighting
Jul 3, 2018 · Apt 1
Close - Heat/hot water
Apartment only
Dec 30, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Dec 29, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2017 · Apt 1F
Close - Heat/hot water
Apartment only
Dec 27, 2017 · Apt 2F
Close - General
Mailbox
Jul 26, 2017 · Apt 2F
Close - Electric
No lighting
Jun 21, 2017 · Apt 2F
Close - Unsanitary condition
Pests
Jun 21, 2017 · Apt 2F
Close - Unsanitary condition
Pests
Jun 21, 2017 · Apt 2F
Close - Appliance
Refrigerator
Jun 21, 2017 · Apt 2F
Close - Unsanitary condition
Pests
Jun 21, 2017 · Apt 2F
Close - Heat/hot water
Entire building
Dec 31, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Dec 27, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Feb 16, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Feb 5, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Feb 5, 2016 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 3, 2016 · Apt 2S
Close - Heat/hot water
Entire building
Feb 1, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Jan 31, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Jan 26, 2016 · Apt 2F
Close - Heat/hot water
Entire building
Jan 21, 2016 · Apt 2F
Close - Heating
Heat related
Jan 22, 2014 · Apt 2F
Close - Heating
Heat related
Jan 21, 2014 · Apt 2F
Close - Heating
Heat related
Jan 20, 2014 · Apt NA
Close - Heating
Heat related
Jan 18, 2014 · Apt NA
Close - Heating
Heat related
Jan 1, 2014 · Apt NA
Close - Heating
Heat related
Dec 12, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Jan 3, 2013 · Apt 2F
Close - Plumbing
Bathtub/shower
Jan 3, 2013 · Apt 2F
Close - Paint/plaster
Ceiling
Apr 3, 2009 · Apt 2R
Close - Plumbing
Water-leaks
Apr 3, 2009 · Apt 2R
Close - General
Windows
Feb 4, 2006 · Apt 3R
Close - General
Ceramic-tile
Feb 4, 2006 · Apt 3R
Close - General
Ceramic-tile
Feb 4, 2006 · Apt 3R
Close - General
Floor
Feb 4, 2006 · Apt 3R
Close - Nonconst
Vermin
Feb 4, 2006 · Apt 3R
Close - Nonconst
Vermin
Feb 4, 2006 · Apt 3R
Close - Heating
Heat related
Feb 4, 2006 · Apt 3R
Close - Electric
Lighting
Dec 31, 2005 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1928
- Floors
- 3
- Residential units
- 6
- Building area
- 3,682 ft²
- Lot area
- 4,115 ft²
- Zoning
- R5
- Community board
- 212
- Council district
- 12
- Block / lot
- 4680 / 26
- Assessed value
- $406,800
- Landmark / historic district
- No
HPD registration #219705, last renewed Sep 8, 2025.
Questions about 823 East 221 Street
Who owns 823 East 221 Street?
The owner of record in NYC Department of City Planning PLUTO data is 823 East 221 Street, LLC.
Does 823 East 221 Street have violations?
Yes. NYC HPD has recorded 53 housing violations at this property.
Is 823 East 221 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 823 East 221 Street built?
City records list 1928 as the year it was built.
How many apartments are in 823 East 221 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.