709 East 214 Street
Bronx, NY 10467BBL 2-04662-0027Map
Owner of record: 709 Residents LLC
709 East 214 Street is a mixed residential and retail building built in 1928 in Bronx, 10467. It has 5 residential units across 3 floors. The owner of record is 709 Residents LLC. HPD has recorded 102 housing violations here, most recently on August 12, 2024. 3 of the 50 most recent violations are still open.
- HPD violations
- 102
- DOB violations
- 2
- ECB violations
- 0
- HPD complaints
- 94
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 102
- BHazardous
Properly repair with similar material the broken or defective missing motar at south exterior wall (parripit wall)
Aug 12, 2024
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage approx. 20 cubic yards at rear yard
Aug 5, 2024
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of building front (excessive cable wires around drop down ladder). at fire escape
Mar 30, 2024
Closed — Violation closed - ANon-hazardous
§ 62 m/d law rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line 3rd story building front
Mar 30, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door being held by uneven floor in the entrance located at apt 3f, 3rd story, 1st apartment from south at west
Mar 13, 2024 · Apt 3F
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Mar 13, 2024 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Mar 13, 2024 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from south at west
Mar 13, 2024 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 3rd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet cover plate at south wall and north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from south at west
Feb 11, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story
Jul 4, 2023
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 1st story
Jul 4, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents evidence of rats at public hall, 1st story
Jul 4, 2023
Open — Defect letter issued - CImmediately hazardous
Properly repair with similar material the broken or defective wood balusters at stairs at public hall stairs, 1st story
Jul 4, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the bathroom , the 2nd room from north at east, the 1st room from north, the 2nd room from north at west located at apt 5r, 1st story, 2nd apartment from south at west
Dec 7, 2021 · Apt 5R
Closed — Violation dismissed - BHazardous
Replace the broken or defective radiator valve in the 2nd room from north at east located at apt 5r, 1st story, 2nd apartment from south at west
Dec 7, 2021 · Apt 5R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5r, 1st story, 2nd apartment from south at west
Dec 7, 2021 · Apt 5R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5r, 1st story, 2nd apartment from south at west
Dec 7, 2021 · Apt 5R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Dec 1, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Dec 1, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Dec 1, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell buzzer from building front to apartment in the foyer located at apt 3f, 3rd story, 1st apartment from south at west
Dec 1, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles and other household items blocking way towards the scuttle ladder at public hall, 3rd story
Nov 23, 2020
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing 5 wood baluster at public hall stairs, 2nd story
Nov 23, 2020
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing 8 wood baluster at public hall stairs, 1st story
Nov 23, 2020
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing 5 wood baluster at public hall, 2nd story
Nov 23, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the 1st room from east at south, the kitchen , the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Oct 19, 2020 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from south at west
Oct 19, 2020 · Apt 2F
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical outlets at east and south walls in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from south at west
Oct 19, 2020 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical switch cover plate at north wall in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
Oct 19, 2020 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Oct 19, 2020 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions from water closet in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Oct 19, 2020 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 19, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 1st story
Oct 19, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall, 1st story
Oct 19, 2020
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective door lock in the entrance located at apt 3f, 3rd story, 1st apartment from south at west
Aug 21, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3f, 3rd story, 1st apartment from south at west
Aug 21, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Aug 21, 2020 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold around bathtub on the tile and grout surfaces in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Aug 21, 2020 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Aug 21, 2020 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3f, 3rd story, 1st apartment from south at west
Aug 21, 2020 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jun 29, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jun 29, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jun 29, 2020
Closed — Violation dismissed
DOB building violations · 2
- Construction other optional
Circumstances beyond owner's control. there was a fire at premises all floors were severly burned & damaged by water. building is completely sealed
Jun 19, 2008
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jun 29, 1990
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Flooring/stairs
Floor
Mar 12, 2024 · Apt 3F
Close - Paint/plaster
Ceiling
Mar 12, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Mar 12, 2024 · Apt 3F
Close - Appliance
Electric/gas range
Mar 12, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 9, 2024 · Apt 3R
Close - Door/window
Door
Feb 9, 2024 · Apt 3R
Close - Paint/plaster
Wall
Feb 9, 2024 · Apt 3R
Close - Paint/plaster
Ceiling
Feb 9, 2024 · Apt 3R
Close - Paint/plaster
Radiator
Feb 9, 2024 · Apt 3R
Close - Electric
Outlet/switch
Feb 9, 2024 · Apt 3R
Close
Show 40 more ↓
- General
Bell/buzzer/intercom
Feb 9, 2024 · Apt 3R
Close - Door/window
Door frame
Feb 9, 2024 · Apt 3R
Close - Flooring/stairs
Floor
Feb 9, 2024 · Apt 3R
Close - Door/window
Window frame
Feb 9, 2024 · Apt 3R
Close - Flooring/stairs
Floor
Feb 9, 2024 · Apt 3R
Close - Safety
Carbon monoxide detector
Feb 9, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Feb 9, 2024 · Apt 3R
Close - Safety
Smoke detector
Feb 9, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Feb 9, 2024 · Apt 3R
Close - Water leak
Slow leak
Feb 9, 2024 · Apt 3R
Close - Safety
Window guard broken/missing
Feb 9, 2024 · Apt 3R
Close - Paint/plaster
Ceiling
Sep 25, 2023 · Apt 2R
Close - Water leak
Damp spot
Sep 25, 2023 · Apt 2R
Close - Paint/plaster
Ceiling
Jul 3, 2023 · Apt 2R
Close - Water leak
Damp spot
Jul 3, 2023 · Apt 2R
Close - Unsanitary condition
Mold
Jul 3, 2023 · Apt 2R
Close - Plumbing
Steam pipe/riser
Dec 4, 2021 · Apt 5R
Close - Door/window
Door
Dec 5, 2020 · Apt 1R
Close - Door/window
Door
Dec 5, 2020 · Apt 1R
Close - Water leak
Heavy flow
Dec 5, 2020 · Apt 1R
Close - General
Bell/buzzer/intercom
Oct 23, 2020 · Apt 3F
Close - Water leak
Heavy flow
Oct 23, 2020 · Apt 3F
Close - Paint/plaster
Ceiling
Oct 23, 2020 · Apt 3F
Close - Plumbing
Basin/sink
Oct 23, 2020 · Apt 3F
Close - Plumbing
Bathtub/shower
Oct 13, 2020 · Apt 2F
Close - Water leak
Slow leak
Oct 13, 2020 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Sep 9, 2020 · Apt 1R
Close - General
Bell/buzzer/intercom
Aug 11, 2020 · Apt 3F
Close - Appliance
Electric/gas range
Aug 11, 2020 · Apt 3F
Close - Door/window
Door
Aug 11, 2020 · Apt 3F
Close - Plumbing
Basin/sink
Aug 11, 2020 · Apt 3F
Close - Plumbing
Basin/sink
Aug 11, 2020 · Apt 3F
Close - Appliance
Electric/gas range
Jun 26, 2020 · Apt 2F
Close - Electric
Lighting
Jun 26, 2020 · Apt 2F
Close - Unsanitary condition
Pests
Jun 26, 2020 · Apt 2F
Close - Appliance
Refrigerator
Jun 26, 2020 · Apt 2F
Close - Appliance
Electric/gas range
May 24, 2020 · Apt 2
Close - Appliance
Refrigerator
May 24, 2020 · Apt 2
Close - Plumbing
Basin/sink
May 21, 2020 · Apt 3F
Close - Appliance
Refrigerator
May 21, 2020 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1928
- Floors
- 3
- Residential units
- 5
- Building area
- 4,533 ft²
- Lot area
- 3,125 ft²
- Zoning
- R7A
- Community board
- 212
- Council district
- 12
- Block / lot
- 4662 / 27
- Assessed value
- $438,300
- Landmark / historic district
- No
HPD registration #221285, last renewed Sep 11, 2025.
Questions about 709 East 214 Street
Who owns 709 East 214 Street?
The owner of record in NYC Department of City Planning PLUTO data is 709 Residents LLC.
Does 709 East 214 Street have violations?
Yes. NYC HPD has recorded 102 housing violations at this property.
Is 709 East 214 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 709 East 214 Street built?
City records list 1928 as the year it was built.
How many apartments are in 709 East 214 Street?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.