Violations at 3221 Pearsall Avenue
Bronx, NY 10469 · BBL 2-04617-0055 · Back to the property
HPD housing violations
22 HPD violations, newest first.
- CImmediately hazardous
Remove device preventing door from being self-closing door sweep at fire door at west leading to public hall stairs at public hall, 1st story
Sep 14, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance , 1st story
Sep 14, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
Jun 25, 2026
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable latch at scuttle hatch at public hall, 3rd story
Jun 2, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Jun 2, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 2, 2026
Open — Nov certified on time - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 2, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper sign
Jun 2, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper sign at public hall, 1st story
Jun 2, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 2, 2026
Open — Nov certified on time - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Jun 2, 2026
Open — False certification - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard yard
Jun 2, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jul 30, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jul 30, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective door casing in the entrance located at apt 1, 1st story, 1st apartment from east at south
May 1, 2025 · Apt 1
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south
May 1, 2025 · Apt 1
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective the door wall cabinet in the kitchen located at apt 1, 1st story, 1st apartment from east at south
May 1, 2025 · Apt 1
Open — Nov certified late - BHazardous
Properly secure the loose washa basin in the bathroom located at apt 1, 1st story, 1st apartment from east at south
May 1, 2025 · Apt 1
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations
No DOB violations on record
ECB violations
1 ECB violations, newest first.
- Class - 2
Failure to provide approved/accpeted const docs @jobsite @time of inso.nb job #220544221.@time of an energy code compliance insp. i observed that there were no job approved plans @jobsite.rem:provide complete s
Aug 16, 2018 · Penalty $250
Resolve