roofy

Violations at 3223 Pearsall Avenue

Bronx, NY 10469 · BBL 2-04617-0054 · Back to the property

HPD housing violations

23 HPD violations, newest first.

  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at boiler room

    Oct 11, 2026

    Open — Nov certified on time
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Oct 11, 2026 · Apt 3

    Open — Nov sent out
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard

    Sep 26, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story

    Sep 14, 2026

    Open — Not complied with
  • CImmediately hazardous

    Remove device preventing door from being self-closing door sweep at fire door at west leading to public hall stairs at public hall, 1st story

    Sep 14, 2026

    Open — Not complied with
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story

    Jul 23, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper/plastic at north wall

    Jul 23, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper/plastic at north wall , 1st story

    Jul 23, 2026

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story

    Jul 23, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system not filled out , 1st story

    Jul 23, 2026

    Open — Not complied with
  • ANon-hazardous

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story

    Jul 23, 2026

    Open — Nov sent out
  • BHazardous

    M/d law abate the nuisance consisting of excessive (vegitation) at north yard

    Jul 23, 2026

    Open — Nov certified on time
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold items and garbage bags at rear yard

    Apr 13, 2026

    Closed — Violation dismissed
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet . in the 1st bathroom from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Apr 13, 2026 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Apr 13, 2026 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Apr 13, 2026 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Apr 13, 2026 · Apt 2

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Apr 13, 2026 · Apt 2

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Apr 13, 2026 · Apt 2

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed

DOB building violations

No DOB violations on record

ECB violations

1 ECB violations, newest first.

  • Class - 2

    Failure to provide approved/accepted const docs @jobsite @time of inspnb job(#220544212).@time of of an energy code compliance insp.i observed that there were no job approved plans @job site.rem:provide complet

    Aug 16, 2018 · Penalty $250

    Resolve