Violations at 1130 Burke Avenue
Bronx, NY 10469 · BBL 2-04581-0001 · Back to the property
HPD housing violations
The newest 50 of 251 HPD violations. The city keeps the complete history.
- ANon-hazardous
Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number 2p2492
Oct 21, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 6th story
Oct 21, 2026
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire rated door in the entrance located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov certified on time - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective connection under sink in the kitchen located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinly floor tiles ( walking area) in the kitchen located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings ahd all walls in the entire apartment located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Notice of issuance sent to tenant - BHazardous
Refit top window sash on east wall in the bathroom located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling. and all walls in the bathroom located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft. at ceiling and walls in the bathroom located at apt 5d, 5th story, 2nd apartment from west at north
Oct 17, 2026 · Apt 5D
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt apt5f, 5th story, 2nd apartment from east at south
Sep 29, 2026 · Apt APT5F
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from north, the private hallway , the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Sep 12, 2026 · Apt 4F
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4f, 4th story, 2nd apartment from east at south
Sep 12, 2026 · Apt 4F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective escutcheon plate at ceiling west riser in the 4th room from north located at apt 4f, 4th story, 2nd apartment from east at south
Sep 12, 2026 · Apt 4F
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Sep 12, 2026 · Apt 4F
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 4f, 4th story, 2nd apartment from east at south
Sep 12, 2026 · Apt 4F
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak over the south wall in the bathroom located at apt 4f, 4th story, 2nd apartment from east at south
Sep 12, 2026 · Apt 4F
Open — Civ14 mailed - BHazardous
Provide heavy duty locking device , 1st story
Jul 28, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at building entrance door , 1st story
Jul 28, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door (leading to public hall from street) building entrance , 1st story
Jul 23, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch and assembly at door (leading to 1st story from street) building entrance , 1st story
Jul 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door (leading to 1st story from street) building entrance , 1st story
Jul 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door (leading to public hall from street) , 1st story
Jul 23, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west and south walls in the 5th room from north located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 4th room from north located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in drain under sink in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in drain under bathtub in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, west, and south walls in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 20 at north wall in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective shower stall in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, north wall, east wall in the bathroom located at apt 1g, 1st story, 1st apartment from east at south
Jul 15, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Replace with new the missing latch and assemblies at street to public hall door , 1st story
Jul 14, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and assemblies at street to public hall door , 1st story
Jul 14, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of wooden wedge , 1st story
Jul 14, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 1a, 1st story, 3rd apartment from east at south
Jul 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and all walls in the bathroom located at apt 1a, 1st story, 3rd apartment from east at south
Jul 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 1a, 1st story, 3rd apartment from east at south
Jul 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1a, 1st story, 3rd apartment from east at south
Jul 7, 2026 · Apt 1A
Open — Nov sent out
DOB building violations
The newest 50 of 89 DOB violations. The city keeps the complete history.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 8, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 8, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 8, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 8, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 8, 2017
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jul 24, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jul 7, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 27, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 7, 2017
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jan 31, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed
ECB violations
43 ECB violations, newest first.
- Class - 2
At time of inspection of a 8-story building with sidewalk shed erected at exp#1-4,during my inspection i noticed sidewalk shed doesn't meet code 3307.6.4.9 avoid interference. also as per section 3307.6.3 area
Jul 15, 2025 · Penalty $10,000
Active - Class - 2
Failure to maintain building exterior walls/facade and appurtenances. at the time of inspection view at exp1:missing window and broken pane.exp2 damaged joints.exp3 damaged joints,bulging bricks and missing win
Jun 13, 2022 · Penalty $1,250
Active - Class - 2
Insulation missing from boiler-no cover on pressure controls-water seeping into and flooding boiler room; correct all violating conditions, submit cert. of correction.
May 24, 2021 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property. incident respond. at time of inspection obsered active jobsite. worker was standing on dumpster pulling down the rope of the garbage bucket he loose his balance
Jun 24, 2019
Resolve - Class - 2
3307.6.5 use and maintenance of sidewalk sheds: note: sidewalk shed erected uner job #240113523 along exp1, has inoperable bulb rendering affected area visibly dark and shadowy creating a potential risk to
Jan 5, 2016
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Apr 15, 2011
Resolve - Class - 2
Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations 36008847x.rem:fi
Jul 12, 2010
Resolve - Class - 2
39o2.70o2.98u5.64m7 provide nyc device # tag on controller and main machine
Jun 2, 2009
Resolve - Class - 2
39o1.64m7.81m07.98u5.64m7 provide nyc device # tag for controller and main
Jun 2, 2009
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules and regulations
Apr 10, 2009
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules and regulations
Apr 10, 2009
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules and regulations
Apr 10, 2009
Resolve - Class - 2
20i11/39o02/39x10/60q03/98u05. 20-i-11 replace damaged 4th & 7th flr hoistway door vision glass. 39-x-10 repair light on top of car.
Dec 10, 2008
Resolve - Class - 2
39o02/60b07/60q03/70o02/71x10/98u05.
Dec 10, 2008
Resolve - Class - 2
20i11/39o02/39x10/60q03/70o02/71x10/77x10/98u05. 20-i-11 replace damage 3rd flr hoistway door vision glass 39-x-10 repair light on top of car 77-x-10 repair light under car.
Dec 10, 2008
Resolve - Class - 2
39o02/39x10/41w07/60q03. 39x10 repair light on top of car. 41w07 provide lock for motor room door.
Dec 10, 2008
Resolve - Class - 2
10h11/39o02/60q03/98u05/100u05. 100u05 file & perform a 2 year test &tag device.
Dec 10, 2008
Resolve - Class - 2
20i11/39o02/39x10/60q03. 20i11 replace damaged 3rd & 4th flr hoistway door vision class. 39x10 repair light on top of car.
Dec 10, 2008
Resolve - Class - 3
39x10/60q03. 39x10 repair light on top of car.
Dec 10, 2008
Resolve - Class - 2
39x10/60q03. 39x10 repair light on top of car.
Dec 10, 2008
Resolve - Class - 2
35q03 39o02 39x10 60q03 70o02 35q03 install cover for electrical box on top of car 39x10 repair light on top of car
Dec 3, 2008
Resolve - Class - 2
39o02 39x10 60q03 70o02 77x10 39x10 repair light on top of car 77x10 repair light under car
Dec 3, 2008
Resolve - Class - 2
39o02 39x10 60q03 70o02 39x10 repair light on top of car
Dec 3, 2008
Resolve - Class - 2
39o02 39q03 60q03 70o02 39q03 install guard for light on top of car
Dec 3, 2008
Resolve - Class - 2
39o02 60q03 70o02
Dec 3, 2008
Resolve - Class - 2
39o02 39x10 42g11 60q03 70o02 39x10 repair light on top of car
Dec 3, 2008
Resolve - Non-hazardous
10h11.16k10.16d6.66o02. 16k10 rusted hoistway doors on 3,4 fls 16d6 2nd fl keeper contact
May 12, 2008
Resolve - Non-hazardous
83x10. 83x10 elevator out service repair & restore to service for fulla full inspection
May 12, 2008
Resolve - Non-hazardous
16k10. 16k10 rusted hoistway doors on 1,2,3,4,5,6 fls
May 12, 2008
Resolve - Non-hazardous
11m7.16i10. 11m7.missing fl # for 1-3 fls 16i10 7 fl door check
May 12, 2008
Resolve - Non-hazardous
16k10.16i10 16k10.16i10 2nd fl hoistway 16i10 door check 2nd fl door & 7 fl
May 12, 2008
Resolve - Non-hazardous
20i11.66d6. 20i11 hoistway doors 66d6 pit door
May 12, 2008
Resolve - Non-hazardous
16k10,10h11,27h11.16-hoistway doors on 1,2,3 floors.27-cab door hanger rollers.
Oct 18, 2007
Resolve - Non-hazardous
Altered bldg occupied without a valid certificate of occupancy alt.#220323364 note:tco #200323364 expt.7/24/01 remedy:obtain a valid cerficate of occupanancy
Dec 26, 2001
Resolve - Non-hazardous
Occupancy contrary to that allowed by the tco noted:in that tco expired july 20 2000 #73592 rem:amend c/o
Jun 1, 2001 · Penalty $2,500
Resolve - Non-hazardous
Altered bldg occupied without a valid certificate of occupancy(c/o). alt#200323364. note:temp c/o#200323364 expired 7/20/00 for community center. remedy: obtain a valid c/o.
Nov 28, 2000
Resolve - Non-hazardous
Altered bldg occupied without a valid ceritficate of occupancy. c/o # 73512 exp'd 1/21/00. remedy: obtain valid certificate of occupancy.
Sep 25, 2000 · Penalty $2,500
Resolve - Non-hazardous
35t7, 31r9. door in motor room and switch on wall 31) not used for elevator.
May 2, 1995
Resolve - Non-hazardous
Pa contrary to apporved plans 79-65. wall separating recreation room and reading room removed combining the two spaces. increasing occupancy from 144 to 168 persons. location : cellar
Feb 28, 1994
Resolve - Non-hazardous
Use of prohibited door. doors throughout passageway make of xombustilbe materials. location: senior center in cellar. remedy; provide fireproof self closing
Feb 28, 1994
Resolve - Hazardous
Failure to submit a 3rd round technical report. periodic inspection of exterior wall and appurtenances as required by ll 10/80 and the department of buildings.
Feb 14, 1994
Resolve - Non-hazardous
73x,(73)restore elvevator to service,or file a bn application for removal
Jan 7, 1991
Resolve - Non-hazardous
Exit signs: missing from northeast and northwest exits to cprvodpr/ remedy: have illuminsted exit signs installed at n/e and n/w exits as per approved p.a. plan.
Aug 30, 1988 · Penalty $125
Resolve