roofy

1912 Amethyst Street

Bronx, NY 10462BBL 2-04254-0011Map

Owner of record: Muslim American Society Of Upper New Yor K

1912 Amethyst Street is a religious facility built in 2021 in Bronx, 10462. The owner of record is Muslim American Society Of Upper New Yor K. HPD has recorded 8 housing violations here, most recently on February 13, 2006.

HPD violations
8
DOB violations
7
ECB violations
29
HPD complaints
74

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Feb 13, 2006

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 8

  • B

    Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • A

    Replace with new the broken or defective light switch in the 4th room from east located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • A

    Replace with new the broken or defective electrical wall outlets in the 4th room from east located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • A

    Abate the nuisance consisting of window nailed shut in the 4th room from east located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings in the bathroom located at apt 2f, 2nd story

    Feb 13, 2006 · Apt 2F

    Closed — Violation closed
  • B

    § 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy in the entire apartment located at cellar apt 1

    Jun 15, 2000 · Apt 1

    Closed — Violation closed

DOB building violations · 7

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 15, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 1, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 20, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 27, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 27, 2016

    Dob violation - dismissed

ECB violations · 29

  • Class - 2

    At the time of inspection, the suspended scaffold permit expired while the equipment remained in use. operation of suspended scaffolds without a valid, active permit prevents verification of approved installati

    Jul 2, 2026

    Resolve
  • Class - 2

    At the time of inspection, the sidewalk shed (sws) permit expired while the shed remained installed and in use. operation of a sidewalk shed without a valid, active permit prevents verification of approved desi

    Jul 2, 2026

    Resolve
  • Class - 2

    Observed suspended scaffold installed roof lvl & 3rd fl of jobsite. upon review of approved plans there is no detail for use of caster frame & caster frames in use missing screw jacks. frames are seated on sty

    Jan 8, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observed jobsite with suspended scaffold installed roof lvl and 3rd fl of jobsite. upon request for manufacture specs for all equipment, pull test, daily inspection logs & pre/post installation. none were provi

    Jan 8, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    1rcny-104-202(k) certificate of fitness-observed ongoing use of suspend scaffold on jobsite. upon request from onsite personnel and workers themselves for certificate of fitness, none were provided at the time

    Jan 8, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observed suspend scaffolding in use on active jobsite. upon request for the designated rigger foreman from onsite personnel, none were provided at the time of inspection. stop all use of suspended scaffoldingpr

    Jan 8, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    28-110.2 phased site safety plans- observed active jobsite with suspended scaffolding installed and active facade work taking place. upon review of provided site safety plan, it does not reflect current phase o

    Jan 8, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Observed jobsite with active facade and exterior work taking place with the use of suspended scaffolding and incomplete roof work. no roof protection has been provided to the adjacent property at exposure 3. st

    Jan 8, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Observed sidewalk shed installed 2 exposure 1 of jobsite. upon review of approved plans, it does not reflect 20 foot entry way and does not show details for extended shed on adjacent property @ expo 4. shed ext

    Jan 8, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observed construction fence installed @ exposure 1 exterior of jobsite. viewing panels are not installed every 25 ft of construction fence. 2 viewing panels obstructed with paint. no information display is post

    Jan 8, 2026 · Penalty $1,000

    Active
Show 19 more ↓
  • Class - 1

    (bc 3303.3) at the time of my inspection of a 3-story nb,building approx. 9.500 square feet. site closed and there were no construction activity.upon shouting at perimeter and banging on fence and door to alert

    Sep 20, 2025 · Penalty $5,000

    Active
  • Class - 2

    Observed active jobsite with a construction fence @ exposure 1. when reviewing jobsite documents on dob internal systems it was apparent that the fence permit had expired 08/07/2023 with no active permit shown.

    Dec 6, 2024

    Resolve
  • Class - 1

    Observed no roof protection @ exposure 2&4 adjacent property roof. roof protection for adjacent properties are required while exterior building construction operations have not been completed. stop all work 10

    Dec 6, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Observed no overhead protection @ expo 2 adjacent property walkway and expo 4 adjacent property front entrance/porch. bc 3309.13 protection of adjoining property equipment and spaces states that overhead protec

    Dec 6, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Observed sidewalk shed @ exposure 1 not tight to the facade with no debris netting to cover the gap or anything to adequately protection pedestrian walking. bc 3307.6.4.5 deck states the deck of the sws shall b

    Dec 6, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Observed ongoing masonry operations @ exposure one interior of jobsite. when reviewing documents on dob internal systems it was apparent that the disability insurance had expired on 06/02/2024, at the time of

    Aug 27, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Observed active jobsite with inadequate housekeeping with accumulated construction debris @ 2 floor and exposure 1 of jobsite with a huge pile of broken cmu block, garbage bags, and foam insulation. exposure on

    Aug 27, 2024

    Resolve
  • Class - 1

    Failure to maintain supported scaffold in code complying manner 3314.4.8. aoi observed workers installing cinder blocks at exp. 2 on a supported scaffold. upon inspecting site, observed several supported scaffo

    Jan 15, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    Inadequate guard rail cable system and missing guard rails where require. upon inspecting 1 floor not on grade level approx. 5 ft. elevated. observed missing guard rails on unenclosed perimeter going all the wa

    Jan 15, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection, observed active jobsite currently installing cinder blocks at exp. 2. observed 8 workers on site upon requesting for sst cards two works provided sst card not accepted after march 18 2023

    Jan 15, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain competent person while active work 3301.13.12. at time of inspection, observed active work . observed workers on a supported scaffold not built per code. upon requesting to speak with cp, t

    Jan 15, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to protect foundations -at time of inspection of a closed jobsite, observed accumlation of water on jobsite foundationdrain water from jobsite

    Nov 4, 2022 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection, observed jobsite fence in place at exposure 1 missing project information panel.

    Nov 4, 2022 · Penalty $625

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pusuant to subsection. @the time of my inspection of a proposed 3 sty demolition i observed. @exp#1 & 2 there is a const fence enclosing the jobsite. the fence has

    May 31, 2019 · Penalty $400

    Resolve
  • Class - 2

    Work w/o a permit:expired permit @the time my inspection of a proposed 3 sty demolition i observed @exp#4 1 & 2(there) is a const fence enclosing jobsite there is a fence but the fence permit is expired. this

    May 31, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to provide notification to the department prior to commencement of demoliton. at time of demo sign off inspection noted on bis that the required notification was not submitted to the dept also on 2/2/17

    Dec 19, 2018 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to provide viewing panels on job site fence. at time of inspection of demo sign off as requested by construction the jobsite fence at exp1 did not have the required viewing panels on fence.rmdy:comply

    Dec 19, 2018 · Penalty $800

    Resolve
  • Class - 1

    Fail to safeguard all persons/prop affected by const ops.note:@active demo site structure down to 1st fl lvl,large masonry rubble pcs have pushed the fence out into public sidewalk.pointed scsrews protrude into

    Oct 27, 2015 · Penalty $800

    Resolve
  • Class - 1

    Work w/o permit.full stop work order. not:@active demo site structure has been brought down to 1st fl lvl.not permit has been issued.rem:stop all work.obtain permit.call b.e.s.t. squad for re-inspection.

    Oct 27, 2015 · Penalty $1,600

    Resolve

Complaints

  • Heating

    Heat related

    Dec 4, 2013 · Apt 2F

    Close
  • Heating

    Heat related

    Oct 31, 2012 · Apt NA

    Close
  • Electric

    Lighting

    Aug 21, 2012 · Apt 2R

    Close
  • Nonconst

    Vermin

    Aug 21, 2012 · Apt 2R

    Close
  • Nonconst

    Vermin

    Aug 21, 2012 · Apt 2R

    Close
  • Nonconst

    Vermin

    Aug 21, 2012 · Apt 2R

    Close
  • General

    Doors

    Aug 21, 2012 · Apt 2R

    Close
  • General

    Window guards

    Jun 18, 2012 · Apt 2NDFL

    Close
  • General

    Windows

    Jun 18, 2012 · Apt 2NDFL

    Close
  • General

    Window guards

    Jun 18, 2012 · Apt 2NDFL

    Close
Show 40 more ↓
  • Electric

    Lighting

    May 29, 2012 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    May 29, 2012 · Apt 2F

    Close
  • Electric

    Electric-supply

    May 29, 2012 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    May 29, 2012 · Apt 2F

    Close
  • Plumbing

    Water supply

    Aug 2, 2011 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Aug 22, 2010 · Apt 1

    Close
  • General

    Cooking gas

    Aug 22, 2010 · Apt 1

    Close
  • Electric

    Wiring

    Jul 15, 2010 · Apt 2F

    Close
  • Electric

    Electric-supply

    Jul 15, 2010 · Apt 2F

    Close
  • Electric

    Electric-supply

    Mar 2, 2010 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Nov 16, 2009 · Apt 2F

    Close
  • General

    Mold

    Nov 16, 2009 · Apt 2F

    Close
  • General

    Floor

    Nov 16, 2009 · Apt 2F

    Close
  • Heating

    Heat related

    Oct 15, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    Sep 8, 2009 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 8, 2009 · Apt 2R

    Close
  • General

    Windows

    Sep 8, 2009 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 8, 2009 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 22, 2009 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 17, 2009 · Apt 1

    Close
  • Heating

    Heat related

    Jan 13, 2009 · Apt 1

    Close
  • Appliance

    Refrigerator

    Jan 13, 2009 · Apt 1

    Close
  • Heating

    Heat related

    Oct 18, 2008 · Apt 1

    Close
  • Electric

    Wiring

    Sep 6, 2008 · Apt 1FLR

    Close
  • Nonconst

    Vermin

    Sep 6, 2008 · Apt 1FLR

    Close
  • Electric

    Electric-supply

    Sep 6, 2008 · Apt 1FLR

    Close
  • Paint/plaster

    Wall

    Jan 8, 2007 · Apt BASE

    Close
  • Paint/plaster

    Ceiling

    Jan 8, 2007 · Apt BASE

    Close
  • Heating

    Heat related

    Feb 22, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 18, 2006 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 9, 2006 · Apt 2F

    Close
  • Electric

    Wiring

    Feb 9, 2006 · Apt 2F

    Close
  • Electric

    Electric-supply

    Feb 9, 2006 · Apt 2F

    Close
  • Plumbing

    Radiator

    Feb 9, 2006 · Apt 2F

    Close
  • Nonconst

    Vermin

    Feb 9, 2006 · Apt 2F

    Close
  • General

    Windows

    Feb 9, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Oct 14, 2005 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Jun 30, 2005 · Apt 2R

    Close
  • Plumbing

    Radiator

    Jun 30, 2005 · Apt 2R

    Close
  • Electric

    Electric-supply

    Jun 30, 2005 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Religious facility (M1)
Year built
2021
Floors
3
Residential units
—
Building area
31,933 ft²
Lot area
9,500 ft²
Zoning
C8-1
Community board
211
Council district
13
Block / lot
4254 / 11
Assessed value
$2,213,550
Landmark / historic district
No

Questions about 1912 Amethyst Street

Who owns 1912 Amethyst Street?

The owner of record in NYC Department of City Planning PLUTO data is Muslim American Society Of Upper New Yor K.

Does 1912 Amethyst Street have violations?

Yes. NYC HPD has recorded 8 housing violations at this property.

Is 1912 Amethyst Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1912 Amethyst Street built?

City records list 2021 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.