Violations at 1925 Eastchester Road
Bronx, NY 10461 · BBL 2-04205-0002 · Back to the property
HPD housing violations
The newest 50 of 60 HPD violations. The city keeps the complete history.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum allow temp. of 130 degrees in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Mar 17, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 28c, 28th story, 2nd apartment from west at north
Feb 21, 2026 · Apt 28C
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 21, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 28c, 28th story, 2nd apartment from west at north
Feb 21, 2026 · Apt 28C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 23a, 23rd story, 2nd apartment from north at east
Feb 18, 2026 · Apt 23A
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 18a, 18th story, 2nd apartment from east at south
Feb 18, 2026 · Apt 18A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 26d, 26th story, 1st apartment from south at west
Feb 14, 2026 · Apt 26D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lo ked at boiler room
Feb 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 27d, 27th story, 1st apartment from south at west
Feb 14, 2026 · Apt 27D
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 6, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 6, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 6, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 6, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 6, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 18f, 17th story, 1st apartment from north at east
Jan 7, 2026 · Apt 18F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arms, door lead from public hall to landury room at laundry room, 1st story
May 7, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Mar 2, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Mar 2, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Mar 2, 2021
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Mar 2, 2021
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing notice at public hall
Mar 2, 2021
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 15b, 15th story, 1st apartment from east at south
Mar 2, 2021 · Apt 15B
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective window frame in the 2nd room from north located at apt 15b, 15th story, 1st apartment from east at south
Mar 2, 2021 · Apt 15B
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 8f, 8th story, 1st apartment from south at west
Apr 25, 2019 · Apt 8F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway , the 1st room from north at west, the 1st room from north at east, the foyer , the 3rd room from north located at apt 2e, 2nd story, 2nd apartment from south at west
Jul 28, 2018 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the 1st room from north at west located at apt 2e, 2nd story, 2nd apartment from south at west
Jul 28, 2018 · Apt 2E
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2e, 2nd story, 2nd apartment from south at west
Jul 28, 2018 · Apt 2E
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2e, 2nd story, 2nd apartment from south at west
Jul 28, 2018 · Apt 2E
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2e, 2nd story, 2nd apartment from south at west
Jul 28, 2018 · Apt 2E
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 13, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2016
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south located at apt 15g, 15th story, 2nd apartment from east at south , section ''1945'', at northwest
Apr 30, 2016 · Apt 15G
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8h, 8th story, apartment at south
Jan 22, 2016 · Apt 8H
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window sill in the kitchen located at apt 15g, 15th story, 2nd apartment from east at south , section ''1945''
Jul 22, 2015 · Apt 15G
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window sill in the 3rd room from east located at apt 15g, 15th story, 2nd apartment from east at south , section ''1945''
Jul 22, 2015 · Apt 15G
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window sill in the 1st room from east located at apt 15g, 15th story, 2nd apartment from east at south , section ''1945''
Jul 22, 2015 · Apt 15G
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story, section ''1945''
Jul 22, 2015
Closed — Violation closed
DOB building violations
The newest 50 of 188 DOB violations. The city keeps the complete history.
- Construction other optional
Ewo due to hazard condi observed on serveral exp & on roof:cracked & spalling flr eye brow @ multi flrs.spalling, damage mortar joints in brick bulkhead; disintergrating coping stone on bulkhead; crack in sea -lant joints on parapet walls;broken bulkhead window panes. remdy: immedy provide safety meas to protect the public.repair damage facade
Nov 22, 2024
Dob violation - active - Construction other optional
Ewo due to imminent hazard conditions observed on exp 1,2,3,4 & roof conditions such as cracked, spalling, eyebrow on various flrs & @ para -pet & bulkhead/penthouse coping stones & window panes remedy: immediately provide sidewalk safety measure shed, netting.,etc to protect the public. repair damage facades as per ircny 103-04
Nov 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Sep 30, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 19, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Jun 18, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Jun 17, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Jun 16, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Jun 15, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2020
Dob violation - resolved - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2018
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2016
Dob violation - resolved
ECB violations
40 ECB violations, newest first.
- Class - 2
At time of inspection, observed temporary lighting installed beneath the sidewalk shed. electrical permit x01160056-i1-el expired on 06/12/2026 and the lighting remained in operation under the expired permit. c
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building walls and/or appurtenances. at time of inspection, i observed cracking concrete wall(white stripe rise-up); 14 floor level at exposure 4 south elevation. remedy: owner to repair/rep
Sep 5, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building walls and appurtenances. as noted: at the time of inspection i observed on several exposures spalling,cracked floor slab eyebrows on multiple=floors. cracks and spalling on
Nov 22, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building walls and appurtenances. as noted: at the time of inspection i observed on several exposures: cracks and spalling floor slab eye brows at multiple floor. damaged mortar joi
Nov 22, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building walls and appurtenances. as noted: at the time of inspection i observed on multiple exposures: spalling, cracked masonry at several floors on eye brows and brick work. roof
Nov 22, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed at exposure 3(north elevation) 2 cracked window glass, one window on the first floor, second cracked window glass located approxima
Sep 27, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed at all exposures spalling/cracked concrete slabs, spalling masonry, deteriorated mortar joints and spalling sills on the roof eleva
Sep 27, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed at exposure 2(north elevation) a cracked window not noted on qewi report, located approximately between floors 4-6, with no safety
Sep 27, 2024 · Penalty $2,500
Active - Class - 2
Failure to comply with commissioner's order contained in summons #35635427x issued 10/1/2021 & failure to file certificate of correction pursuant to 28.201.1 & 1rcny 102-01(d)(2).an acceptable certificate has n
May 15, 2024 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons #35635426y issued 10/1/2021 & failure to file certificate of correction pursuant to 28.201.1 & 1rcny 102-01(d)(2).an acceptable certificate has n
May 15, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #35635425m issued 10/1/2021 & failure to file certificate of correction pursuant to 28.201.1 & 1rcny 102-01(d)(2).an acceptable certificate has n
May 15, 2024 · Penalty $1,250
Active - Class - 1
At time of inspection observed active parking garage concrete ceiling instate of disrepair conditions with cracks, spalling & section missing concrete and exposed rebar on ceiling over ramp at level a & b. also
Dec 27, 2023 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#908596.rem:submit acceptable required t
Dec 9, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control908598.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control908597.submit acceptable required technical report
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances.as noted:at time of inspection observed on exp #3 vertical cracks in bricks at 28th floor spall cracked eyebrow/concrete floor slab on 13th floor ex
Oct 1, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building walls and appurtenances.as noted:at time of inspection observed at exp #3 vertical cracks in 28th loor bricks.exp #4 cracked concrete on 28th floor step cracks in brick at
Oct 1, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances.as noted:at time of inspection observed at exp #3 spalling masonry at several floors & spalling cracked concrete on 28th floor spandrel damaged crac
Oct 1, 2021 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances.as noted building has spalled concrete masonry on all exposures and on roof in several locations also damaged mortar joints and step cracking throu
Aug 17, 2021 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances.as noted:building has spalled concrete masory on all exposures and on roof in several locations also damaged mortar joints and step cracking throug
Aug 17, 2021 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances.as noted building has spalled concrete masonry on all exposures and on roof in several locations also damaged mortar joints and step cracking.remed
Aug 17, 2021 · Penalty $1,250
Resolve - Class - 2
Restore to service so a full inspection can be made by this department.
Jan 20, 2021
Resolve - Class - 1
Cease use= 2 items, altered car door restrictor, missing governor led seal ,repair restrictor and provide seal and tact governor in front of a dob inspector , class 1=no door lock monitoring in this controller
Jan 21, 2020 · Penalty $1,250
Resolve - Class - 2
A.c. 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1, 2019, in an office buildi
Nov 15, 2019
Resolve - Class - 2
A.c. 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1, 2019, in an office buildi
Nov 15, 2019
Resolve - Class - 1
97l##; 59bb07;68m07; 99bb05. 97l##-elevator defective. cease use pend ing investigatgion by dob elevator unit. 59bb07-provide and perform brake maintenance; 68m07-provide elevator maintenance logbook for the
Jul 28, 2019 · Penalty $1,250
Resolve - Class - 1
05z10. cease use item car door restrictor altered/tampered with repair and contact nycdob to return car to service.
Sep 17, 2017 · Penalty $1,000
Resolve - Class - 2
68b07,70o02
Jul 11, 2016 · Penalty $250
Resolve - Class - 2
16h11,68b07,70o02. 16-1st floor hoistway hangar rollers worn
Jul 11, 2016 · Penalty $250
Resolve - Class - 1
59m07,50q03,45m07,42q03,05m07. 59m07-provide 1year brake inspection tag; 50q03-install generator brush covers; 45m07-provide governor dev ice#; 42q03-install controller side-junction cover;05m07-provide car
May 13, 2016 · Penalty $1,000
Resolve - Class - 1
*01x10,59m07,70o02,42q03,50q03,45m07,05m07. 01x10-repair stop switch; 59m07-provide 1year brake tag; 70o02-clean pit; 42q03-install side controller function cover; 50q03-install brush covers on generator; 45m07
May 13, 2016 · Penalty $1,000
Resolve - Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015
Resolve - Class - 2
Failure to file an architect / engineer report certifying exit / direcetional signs are connected to emergency power source / storage battery equipment. remedy: file architect / engineer report.
Jan 27, 2010 · Penalty $400
Resolve - Class - 2
52h11 60q03 68m07 81m07 52h11 -replace badly worn hoist ropes
Jul 1, 2009
Resolve - Non-hazardous
75u05
Jan 10, 2001
Resolve - Non-hazardous
75u05,46h12.46-excessive crown wear and valley breaks.
Jan 10, 2001
Resolve - Non-hazardous
32m.32-motor room over the broken box wires hanging out at ducct work
Feb 5, 1997
Resolve - Non-hazardous
09h.
Feb 5, 1997 · Penalty $100
Resolve - Hazardous
Failure to file an amended report acceptable to this department pursuante to rule rcny 32-036(5)indicatin coreection of hazardous conditions described in initial ll10/80 report. remedy: file an amend
May 15, 1992
Resolve - Hazardous
Failure to file an amended report acceptable to this department pursuant to rule rcny 32-03b(5)indicating correction of hazardous conditions described in initial ll10 /80 report. remedy: file an amend
May 15, 1992
Resolve