Violations at 1400 Pelham Parkway South
Bronx, NY 10461 · BBL 2-04205-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
The newest 50 of 862 DOB violations. The city keeps the complete history.
- Construction other optional
Failure to maintain building in a code compliant manner.as noted on ex p1 south elev:observed broken window panes on several floors(3rd & 4th )exp3 north elev:loose window trim on the underside of window sill.rem edy:repair and/or replace broken window panes,window trim
May 27, 2025
Dob violation - active - Construction other optional
Failure to maintain bldg in code complaint manner. note - observed section of brick removed at exp 1 loading dock area where no safety measure in place. obsereved damaged mortar joint toward bulkhead. x remedy - fix and or replace
May 25, 2025
Dob violation - active - Construction other optional
Failure to maintain bldg in code complaint manner. note - observed section of brick removed at exp 1 loading dock area where no safety measure in place. observed damaged mortar joint toward bulkhead. fix and or replace
May 25, 2025
Dob violation - active - Construction other optional
Emergency work order due to hazardous material. at time of inspection observed large section of brick removed from facade at exp#1 load doc area above an entrance/exit door.no safe measure were installed for safety of public & prop.remedy:take & provide safe meas to secure public safety at exp#1 loading doc area
May 23, 2025
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Dec 7, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed
ECB violations
The newest 50 of 131 ECB violations. The city keeps the complete history.
- Class - 1
Incident where a worker was using outrigger pulley system to bring material up to 7th fl when he got hurt, failed to submit report within 3business days of required 16 items to code 28-103.21 per-28-103.21.1 vi
Apr 3, 2026 · Penalty $25,000
Active - Class - 2
At the time of inspection of a 12-story hospital building, i observed supported pipe scaffolds install with debris chute approx. 45 feet high, i review the department of building records reveals no permit was o
Mar 26, 2026 · Penalty $1,280
Active - Class - 1
Failure to maintain/display on site documents required by bc chapter 33. at time of inspection of active alteration site upon request for dob documented plans for job x00814971 none were provided., maintain/dis
Mar 24, 2026 · Penalty $12,500
Active - Class - 1
Failure to promptly notify the department of an accident, incident,or damage to adjoining property at construction,demolition site.responded to a incident reported pulley on supported scaffold out rigger fell a
Mar 24, 2026 · Penalty $25,000
Active - Class - 1
Work without a permit. at time of observed interior renovation in progress permit#x00814971-l1-gc with expired permit 11/12/2025., obtain permit
Mar 24, 2026 · Penalty $12,500
Active - Class - 2
At time of inspection responded to an incident where a worker was using outrigger pulley system to bring material up to 7th floor, the pulley detached and fell 13 stories hitting worker in shoulder causing inju
Mar 24, 2026 · Penalty $6,280
Active - Class - 1
Failure to maintain in code-compliant manner. responded to a incident where a worker was using outrigger pulley system to bring material up to 7th floor, the pulley detached and fell 13 stories hitting worker i
Mar 24, 2026 · Penalty $12,500
Resolve - Class - 2
Pedestrian protection does not meet code specifications. as noted: at the time of inspection i observed on exposure #1 of building and exposure #3: sidewalk sheds has missing parapet panels. exposure #1 also ha
May 27, 2025 · Penalty $10,000
Active - Class - 2
Expired sidewalk shed in place. note at time of inspection shed was inplace multiple locations of the building but when looking for a permit. it was exoired on dobnow and bis. no valid permit observed. remedy:
May 23, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observed broken window glass on 4th fl. at exp #1(east elev). remedy: maintain exterior building facade and appurt
Mar 27, 2025 · Penalty $2,500
Active - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#913095.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control908591.submit acceptable required tech report
Dec 2, 2022 · Penalty $6,250
Active - Class - 2
Failure to submit acceptable required cycle9a report of critical examination documenting condition of exterior wall&appurtenances required by28-302.4 for control#908592.submit acceptable required technical repo
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Note: at the time of inspection observed about 180ft long sidewalk shade at expsure1, pedestrian walking under sidewalk shed. observed about 20ft plywood parapet missing on it ; creating debris/construction mat
Jul 12, 2022 · Penalty $625
Active - Class - 2
Note: at the time of inspection observed about 180ft long sidewalk shade at expsure1, pedestrian walking under sidewalk shed. observed missing parapet information panel ; creating hazard for 1st responder in ca
Jul 12, 2022 · Penalty $625
Active - Class - 2
Failure to maintain building exterior walls,facade and appurtenances. exp1 crack at exterior ceiling,damaged joints and loose bricks.exp2 damage sellant.exp3 step crack at emergency area.remedy:maintain buildin
Jun 17, 2022 · Penalty $1,250
Active - Class - 2
Failure to maintain building exterior walls/facade and appurtenances. exp1 damaged ceiling at emergency area.building bricks damaged joints exp2 damaged facade at parking garage.exp3 damaged joints.remedy:maint
Jun 17, 2022 · Penalty $1,250
Active - Class - 2
Failure to maintain building exterior walls facade and appurtenances:observed at exposure 1:crack window pane,damaged at bldg entrance awning. exposure 2:damaged joints,damaged bricks and bulging. exposure 3:cr
Jun 17, 2022 · Penalty $1,250
Active - Class - 1
No door lock monitoring installed in this controller as per 3.10.12 of appendix k3 of the 2014 nycbc. remedy; install dlm and perform and file test with nycdob.
Apr 22, 2021 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as per 3.10.12 of appendix k3 of the 2014 nycbc. remedy; install dlm and perform and file test with nycdob.
Apr 22, 2021 · Penalty $1,250
Resolve - Class - 2
Sec. 27-929.1 a.c.27-929.1,failure to complete the installation of a full system of automatic spriklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg
Nov 15, 2019 · Penalty $1,250
Active - Class - 2
Construction electrical installation w/o required commissioner's approval per section. mr. corrado christopher/global elec; contrg of completely installed an electrical sevice in excess of 1000kva pivot to rece
Apr 25, 2019 · Penalty $2,400
Active - Class - 2
Constructed electrical installation w/o required commissioner's approval per section. installed electrical service in excess of 1000kva w/oadvisory board approval. (application #y146691).rmdy: obtain approval.
Mar 22, 2019 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditiond described in intial facades report required by 28-302.5 for control #808591.file acceptabel report
Aug 1, 2018
Active - Class - 2
Failure to file accepptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #808592.file acceptable report.
Aug 1, 2018
Active - Class - 2
Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facdes report required by 28-302.5 for control #813095.file acceptable report
Aug 1, 2018
Active - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #808595.rem:submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #808593.rem:submit required technical report.
May 18, 2018
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report.rem:file acceptable amended report.
Nov 7, 2016
Active - Class - 1
Failure to take required measures to secure public safety - unsafe facade. noted: at time of inspection no safety measures in place to secure public safety from unsafe facade filed on 06/15/15. remedy: comply w
Jul 28, 2015
Active - Class - 1
Failure to take required measures to secure public safety - unsafe facade. noted: at time of my inspection no shed or protective measures to secure public safety from unsafe facade filed on 06/15/15. remedy: c
Jul 17, 2015
Active - Class - 1
Failure to take required measures to secure public safety - unsafe facade. noted: at time of inspection no shed or protective measures to secure public safety from unsafe facade filed on 06/15/15. remedy: compl
Jul 17, 2015
Active - Class - 2
/05m07/19m07/52h11/52m07/ 05m07-provide car door restrictor zone lock. 19n07-provide bottom hoistway door safety retainer (fire gibbs). 52m07-provide spin out for hoist ropes.
Dec 22, 2014
Resolve - Class - 2
/05m11/19m07/52h11/ 05m11-replace car door restrictor (zone lock). 19m07-provide bottom hoistway doors safety retainer (fire gibbs).
Dec 22, 2014
Resolve - Class - 2
/52h11/52m07/70o02/71q03/ 52m07-provide spin out fro hoist ropes.
Dec 22, 2014
Resolve - Class - 2
/03m11/03i11/35q03/44h11/52h11/42d06/67m07/76m07/ 03m11-replace missing section of handrail. 03i11-replace damaged fan grill. 35q03-install cover for electrical box top of car. 42d06-secure relay on controller
Dec 22, 2014
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Oct 14, 2014
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
May 27, 2014
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of bldgs rules & regul
Jan 15, 2012
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial ll11/98report.36015655r.rem:file an amended report following remedial repairs
May 27, 2011
Active - Class - 2
Failure to file an amended sixth round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remed
Dec 17, 2010
Active - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair
Sep 17, 2010
Active - Class - 2
Failure to file an architect/engineer report certifying exit/directional signs are connected to emergency power source/storage battery equipment.rem:file architect/engineer report
Jan 27, 2010
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair
Dec 4, 2009 · Penalty $4,000
Active - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following repairs of th
Dec 4, 2009
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of bldgs rules & regulat
Nov 27, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations re
Nov 27, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations re
Nov 27, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations re
Nov 27, 2009
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner - exterior bus type/patient canopy - concrete cracking exposing ruster rebar throughout. remedy: immediately make safe - immediately submit/obtain permit/make
Sep 5, 2009
Resolve