roofy

1856 Mayflower Avenue

Bronx, NY 10461BBL 2-04192-0019Map

Owner of record: Saleh , Ammer R

1856 Mayflower Avenue is a walk-up apartment building built in 1927 in Bronx, 10461. It has 4 residential units across 2 floors. The owner of record is Saleh , Ammer R. HPD has recorded 59 housing violations here, most recently on May 14, 2026. 35 of the 50 most recent violations are still open.

HPD violations
59
DOB violations
0
ECB violations
0
HPD complaints
38

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 59

  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    May 14, 2026

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 1, wg to repair = 5 in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    May 14, 2026 · Apt 1F

    Open — Nov certified late
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 1f, 1st story, 1st apartment from north at east

    May 14, 2026 · Apt 1F

    Open — Nov certified late
  • A

    Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from north at east

    May 14, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective hydronic baseboard heater cover at west wall in the 3rd room from east located at apt 1f, 1st story, 1st apartment from north at east

    May 14, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1f, 1st story, 1st apartment from north at east

    May 14, 2026 · Apt 1F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the private hallway , the bathroom , the 2nd room from east at north located at apt 1f, 1st story, 1st apartment from north at east

    May 14, 2026 · Apt 1F

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 2nd room from east at north located at apt 1f, 1st story, 1st apartment from north at east

    Feb 25, 2025 · Apt 1F

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the bathroom , the private hallway , the kitchen , the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Feb 10, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Nov 1, 2024 · Apt 1R

    Open — Nov sent out
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Nov 1, 2024 · Apt 1R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • C

    Abate the infestation consisting of rodents rats in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2F

    Open — Notice of issuance sent to tenant
  • B

    Properly secure the loose west door frame casing in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance at upper sash of 1st window from east at south in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    May 20, 2024 · Apt 2

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing

    May 17, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hing at door in the foyer located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing

    May 17, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    May 17, 2024

    Open — Nov sent out
  • B

    Properly secure the loose ceramic floor saddle in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 17, 2024

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 17, 2024

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing

    May 17, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    May 17, 2024

    Open — Nov sent out
  • A

    Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.

    May 17, 2024

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of exposed nails at broken cabinet drawer in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective cracked ceramic tile at the floor in the 2nd room from east located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    May 17, 2024 · Apt 2

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at building entrance door (street to vestibule)

    May 17, 2024

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 17, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 5, 2021

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures (bathtub) in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Mar 23, 2021 · Apt 1A

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Pests

    Mar 31, 2026 · Apt 1F

    Close
  • Water leak

    Heavy flow

    Mar 31, 2026 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Feb 18, 2025 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Jun 4, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    May 17, 2024 · Apt 2F

    Close
  • Paint/plaster

    Wall

    May 17, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    May 13, 2024 · Apt 2F

    Close
  • Paint/plaster

    Wall

    May 13, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    May 13, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    May 13, 2024 · Apt 2F

    Close
Show 28 more ↓
  • Unsanitary condition

    Pests

    May 1, 2024 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 2, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Feb 8, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Feb 8, 2024 · Apt 2F

    Close
  • General

    Cabinet

    Feb 8, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Feb 8, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Feb 8, 2024 · Apt 2F

    Close
  • Door/window

    Window frame

    Feb 8, 2024 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 22, 2023 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 4, 2023 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 4, 2023 · Apt 2F

    Close
  • Water leak

    Heavy flow

    Jun 4, 2022 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jun 4, 2022 · Apt 1A

    Close
  • Electric

    Power outage

    Jul 30, 2021 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Mar 22, 2021 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 16, 2021 · Apt 1A

    Close
  • Electric

    Wiring

    Feb 20, 2004 · Apt BST

    Close
  • Electric

    Wiring

    Feb 20, 2004 · Apt BST

    Close
  • General

    Windows

    Feb 20, 2004 · Apt BST

    Close
  • Plumbing

    Basin/sink

    Feb 20, 2004 · Apt BST

    Close
  • Plumbing

    Basin/sink

    Feb 20, 2004 · Apt BST

    Close
  • Paint/plaster

    Ceiling

    Feb 20, 2004 · Apt BST

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2004 · Apt BSMT

    Close
  • Plumbing

    Basin/sink

    Feb 18, 2004 · Apt BSMT

    Close
  • Plumbing

    Basin/sink

    Feb 18, 2004 · Apt BSMT

    Close
  • General

    Windows

    Feb 18, 2004 · Apt BSMT

    Close
  • Electric

    Wiring

    Feb 18, 2004 · Apt BSMT

    Close
  • Electric

    Wiring

    Feb 18, 2004 · Apt BSMT

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1927
Floors
2
Residential units
4
Building area
2,600 ft²
Lot area
2,375 ft²
Zoning
R5A
Community board
210
Council district
13
Block / lot
4192 / 19
Assessed value
$342,450
Landmark / historic district
No

HPD registration #217806, last renewed Dec 23, 2025.

Questions about 1856 Mayflower Avenue

Who owns 1856 Mayflower Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Saleh , Ammer R.

Does 1856 Mayflower Avenue have violations?

Yes. NYC HPD has recorded 59 housing violations at this property.

Is 1856 Mayflower Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1856 Mayflower Avenue built?

City records list 1927 as the year it was built.

How many apartments are in 1856 Mayflower Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.