roofy

Violations at 900 Van Nest Avenue

Bronx, NY 10462 · BBL 2-04091-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

25 DOB violations, newest first.

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 5, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 5, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 2, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 2, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 8, 2016

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 10, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 10, 2014

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 4, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 4, 2010

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 26, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 28, 2001

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed

ECB violations

49 ECB violations, newest first.

  • Class - 2

    Failure to maintain building in code-compliant manner.noted:storage inelectrical switch gear room with misc.items consisting of janitorial supplies and equipment observed upon inspection.rem:repair and/or repla

    Apr 15, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: emergency generator for emergency backup lighting in cafeteria, gym, and auditorium not functioning in the cement of a power outage observed upon in

    Apr 15, 2026 · Penalty $1,250

    Active
  • Class - 2

    Reissue on ecb #35720022y. failure to maintain building in code-compliant manner. noted: 1st, 2nd, 3rd and 4th floor and 5th fl approx. 27 damaged exterior double pain glass in a variety of classrooms 514, 516,

    Apr 15, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue on ecb #35720023x. failure to maintain building in code-compliant manner. noted: water damage from roof leak on ceiling with spalling plaster/dry wall(5th floor staircase b in several locations and ongo

    Apr 15, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue on ecb #35720024h. exit door not self-closing. noted: emergency exterior exit doors not self-closing due to binding, missing and/or faulty hardware on exterior emergency exit #4 at exp #1 left side of m

    Apr 15, 2026 · Penalty $1,562

    Active
  • Class - 2

    Exit door not self-closing properly at the time of inspection at the time of inspection observed and noted at 5th floor stairway "a" 2 exit door not self-closing properly and at 1st floor stairway "a" one exit

    Jun 5, 2025 · Penalty $625

    Active
  • Class - 2

    Reissue #35688788k date of issue: 09-25-2024. failure to maintain building wall(s) or appurtenances at the time of inspection observed and noted roof leak causing damage to the ceiling at 5th floor staircase "b

    Jun 5, 2025 · Penalty $6,250

    Active
  • Class - 2

    Reissue: 35688789m date of issue: 09-25-2024. failure to maintain building in code-compliant manner. at the time of inspection observed and noted at 1st, 2nd, 3rd, 4th and 5th floor at room no room 106, 208, 30

    Jun 5, 2025 · Penalty $3,125

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: window glass cracks observed at classroom windows at following classrooms: room #514, 516, 406, 416, n308, 316, 314, 310, 302, 208, 106 and charter

    Sep 25, 2024 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building wall(s) or appurtenances. noted: roof leak causing damage to the ceiling at 5th floor staircase "b". remedy: make necessary repairs.

    Sep 25, 2024 · Penalty $1,250

    Active
  • Class - 2

    Exit door not self closing properly at the time of inspection. at fir st floor main entrance 2 exit door and 2nd floor gym there is two gym, 3 exit doors are not self closing properly and 4th floor one exit doo

    Jun 23, 2023 · Penalty $625

    Resolve
  • Class - 2

    Reissue #35655457p date of issue: 06.21.2022 failure to maintain building wall or appurtenances. at the time of inspection observed at exp#4 rear facade a vertical crack from the 4th floor to 2nd floor approx 3

    Jun 23, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    Reissue #35655458r date of issue: 06.21.22 failure to maintain building in code compliant manner. at the time of inspection observed at 5th floor room-502 several drop ceiling tiles are bulging due to leak from

    Jun 23, 2023 · Penalty $1,562

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner:noted:observed at 1st flr-rm#102(elec.meter room)has an excessive amount of storage which include multiple cardboard boxes school furniture & misc items bei

    Jun 21, 2022 · Penalty $625

    Resolve
  • Class - 2

    Reissue#35586627m-failure to maintain building in code-compliant manner.noted:observed at 5th flr-rm#502 several drop ceiling tiles are bulging due to leak from above,5th flr-stwy b ceiling has signs of water p

    Jun 21, 2022 · Penalty $625

    Resolve
  • Class - 2

    Reissue#35591816h-failure to maintain building wall(s)or appurtenancesnoted:observed at exp#3/rear facade a vertical crack from the 4th flr to 2nd flr approx.35ft long.rem:maintain building exterior wall.

    Jun 21, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Reissue 35586626k failure to maintain building walls or appurtenance note at exposure#3 rear facade a vertical crack from the 4th floor to 2nd floor.this is located near the outdoor playground area sidewalk she

    Oct 13, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner:provide required corridor width per bc1016.2,27-369.noted:upon inspection observed,at sideexit for stage in auditorium an excessive amount of cardboard boxes &

    Aug 23, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner.noted:upon inspection observed,at 4th floor corridor near room 410 both doors have defective door closers which can create a hazardous &/or fatal situation if

    Aug 23, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code-compliant manner.noted:upon inspection observed,at room #502-drop ceiling tiles are bulging due to leak,at 5th fl stair b-plaster is wet & bulging from ceiling due to leak comin

    Aug 23, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain bldg wall(s) or appurtenances.noted:upon inspection observed,at exp.#3 from the outdoor play area located on the 4th fl.there is a vertical crack going down the masonry wall approx. 35 ft.

    Aug 23, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Re-issue #35433841x failure to maintain bldg in code-compliant manner.noted:upon inspection observed,excessive storage in room #105 main electrical room of cardboard boxes.remedy:repair &/or replace.

    Aug 23, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue #35442148a failure to maintain building in code compliant manner broken door check @ 4th floro corridor repair and or replace

    Jun 5, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue#35442149y failure to maintain building in code compliant manner storag ein room 105 main electrical room boxes in room repair and or replace

    Jun 5, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue: 35341711j noted: failure to maintain bldg in code compliant manner: at electrical room over 50 boes. remedy: repair &/or repair.

    Jul 19, 2019

    Resolve
  • Class - 2

    Reissue: 35272233h failure to maintain bldg in code compliant. noted: broken door check @ 4th fl corridor. remedy: repair &/or replace.

    Jul 19, 2019

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: at the elctrical room there are over 50 boxes. no storage should be in this room. rmdy: repair and/or replace.

    Jun 21, 2018

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: noted: at electrical room pipes are penetrating through the wall w/o fire stopping. rmdy: provide/maintain fire stopping.

    Jun 21, 2018

    Resolve
  • Class - 2

    Reissue: 35272232x failure to maintain bldg in code-compliant manner noted: at roof level defective rtu(2) hvac which is leaking. rmdy: repair and/or replace.

    Jun 21, 2018

    Resolve
  • Class - 2

    Reissue: 35272233h failure to maintain bldg in code compliant manner:noted: broken door check at 4th floor corridors by room 410. rmdy: repair and/or replace.

    Jun 21, 2018

    Resolve
  • Class - 2

    97x10 restore to service so full inspection can be done by the dept.

    Nov 20, 2017

    Resolve
  • Class - 2

    Sec: 28-301.1. unlawful placement of furnishing, decorations or other ogjects @ exits that obstruct access to, egress from or visibility thereof per fdny 2008 code; @ 2nd flr corridor, near room 252, tables & c

    Jun 22, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: broken door check @ 4th flr corridor by smoke door. rem: repair &/or replace.

    Jun 22, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg wall(s) or appurtenances. noted: @ roof level defective rtu(2)/hvac was observed. rem: maintain exterior bldg wall.

    Jun 22, 2017

    Resolve
  • Class - 2

    99bb05,98bb05. (99bb05)failure to report cat1 to dob. (98bb05)failure to report cat5 insp to dob.

    Nov 7, 2016

    Resolve
  • Class - 1

    Cease use. 100##,100m11,100i11,3m11,81m11,97x10,98u15,99bb5. (100##)failure to report an elevator accident- failure to report an elevator accident promptly- accident occured on 5/23/16, damages to property in e

    Nov 7, 2016

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances. reissue nov#35119934j issed 2-9-15. noted: water penetrating bldg envelope at 5th sty north corridor wall & ceiling. remedy: repair defect noted.

    Oct 28, 2016

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. reissued nov#35119935l issued 2-9-15. noted: drywall at ceiling damaged by water at 5th sty corridor at north-west area. remedy: repair defects noted.

    Oct 28, 2016

    Resolve
  • Class - 2

    Water damaged drywall & accoustical ceilings.@5th story north-west corridor ceiling adjoining northwall.@3rd story room #'s n314 & n316. remedy:repair &/or replace defects noted.

    Feb 9, 2015

    Resolve
  • Class - 2

    Water penetrating bldg envelope @5th story north corridor- northwall & ceiling. remedy:repair defect noted maintain weather-proof integrity of bldg envelope.

    Feb 9, 2015

    Resolve
  • Class - 2

    Failure to maintain bldg in a code compliant manner: provide required corridor width per bc 1016.2;27-369 public corridor partially obstructute by tables w/student projects displayed at 5th,4th & 3rd stories.

    May 22, 2013

    Resolve
  • Class - 2

    Fire protective coating missing at stair a roof bulk head structural steel has exposed surfaces (no fire proofing applied to section of steel roof beam) remedy: repair defect noted provide fire protective coati

    May 15, 2012

    Resolve
  • Class - 1

    Failure to provide sidewalk (shed) where required. no sidewalk (shed) at exp #2. remedy: provide sidewalk shed.

    May 8, 2009

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. tie-ins are contrary to approved plan. remedy: conform to approved documents or amendments.

    May 8, 2009

    Resolve
  • Non-hazardous

    Failure to safeguard public and property effected by demolition operations. note: at the time of inspection approx 130ft fencing was down ,ake site accessible for 3 adjacent property back yard. remedy: replace

    Jun 12, 2008 · Penalty $1,500

    Resolve
  • Non-hazardous

    Failure to post permit for work in progress noted: at the time of inspection on demolition site work in progress in repairing approx 130ft of fence on west side of site with no permit posted as per code.

    Jun 12, 2008 · Penalty $130

    Resolve
  • Hazardous

    Sec. 27-1036(c)(1). failure to remove hazardous material, like glassesfrom bldg as per bldg code. at the time of inspection inactive demolition site, work in progress. glasses found in floors as broken & pieces

    Apr 1, 2008

    Resolve
  • Non-hazardous

    Elevator landing signs missing throughout bldg. floor number signs missing throughout. stair and elevator i.d. signs missing. remedy: install signs as per code ll16/84.

    Aug 26, 1992

    Resolve
  • Non-hazardous

    Failure to obtain equipment use permit for unit mounted at north west roof level. remedy: file plan+obtain approval+permit.

    Mar 12, 1991

    Resolve