Violations at Barnes Avenue
Bronx, NY 10462 · BBL 2-04053-0047 · Back to the property
HPD housing violations
17 HPD violations, newest first.
- CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Jul 7, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Jul 7, 2025 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jul 7, 2025 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jul 7, 2025 · Apt 1F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3r, 3rd story, 1st apartment from north at east
Nov 8, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 3r, 3rd story, 1st apartment from north at east
Nov 8, 2024 · Apt 3R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to cellar from 1st story public hall
Sep 13, 2022
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ''missing''
Sep 13, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ''missing''
Sep 13, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Sep 13, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 13, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 13, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ''missing''
Sep 13, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 13, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations
5 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed
ECB violations
10 ECB violations, newest first.
- Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. at time of inspection i observed 2 workers water proofing the concrete from work at exp#2 male stated plans not at site & to call th
Apr 11, 2017 · Penalty $250
Resolve - Class - 3
Sec. 28-105.1 work w/o a permit. expired permit. the violating conditions are as follows. at time of 2 workers water proofing the perimeter of concrete forms work at exp#2. no valid permit job#220481994-01-nb
Apr 11, 2017 · Penalty $100
Resolve - Class - 2
Sec. 3301.7 failure to provide construction super logs. at time of inspection observed an active construction site w/concrete work in progress for foundation wall. during inspection requested for construction
Mar 6, 2017 · Penalty $800
Resolve - Class - 1
Sec. 3301.2 failure to provide adequate means of egress. at time of inspection observed an active construction site w/concrete work in progress for foundation work. during inspection noted: that workers were
Mar 6, 2017 · Penalty $1,600
Resolve - Class - 1
No guardrails. at time of inspection observed an active construction site w/concrete work in progress for foundation walls. during inspection noted that there was no guardrails around foundation wall which it
Mar 6, 2017 · Penalty $1,200
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at time of inspection observed an active construction site w/concrete work in progress. during inspection after search on bis noted that there was
Mar 6, 2017 · Penalty $4,800
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.noted:at the time of inspection construction site is missing guardrails around excavation area expo#7,expo#2 and expo#4 it was al
Feb 8, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to notify dob within 24-48 hours of the start of the excava tion. noted at time of inspection contractor has started the excavations operations for the new building footings and foundations and no
Jan 24, 2017 · Penalty $1,230
Resolve - Class - 2
Failure to provide an adequate construction fence inadequacies noted. at time of inspection the construction site fence is missing fence sections at exp#3 and exp#4. fence sections have fallen and contractor ha
Jan 24, 2017 · Penalty $830
Resolve - Non-hazardous
Occupancy contrary to that allowed by the bldg dept records. noted alt1235/56 which indicates vacant front & side yard at the south section change any now occupied as parking of 2 commercial vans any 1
Oct 11, 2007 · Penalty $400
Resolve